Wikisage, the free encyclopedia of the second generation, is digital heritage

Sydney Metro: Difference between revisions

From Wikisage
Jump to navigation Jump to search
(based on https://en.wikipedia.org/w/index.php?title=Sydney_Metro&oldid=881055615)
 
Line 82: Line 82:


==Rolling stock==
==Rolling stock==
[[File:Sydney Metro train (better quality).jpg|thumb|Prototype of an [[Alstom Metropolis]] designed for the Sydney Metro, on display at the [[Sydney Royal Easter Show|2017 Sydney Royal Easter Show]].]]
Twenty-two self-driving [[Alstom Metropolis]] [[electric multiple units]] have been ordered for the network. The trains come in a 6-car single deck configuration. Each train features two dedicated areas for prams, luggage and bicycles. There are three doors per side per carriage and no internal doors between the carriages.<ref>{{cite web|title=Case study: North West Rail Link, Sydney, Australia|url=https://assets.partners.alstom.com/StreamedAsset.axd?assetid=eec46df7-20f4-4ca0-b084-48fd3bab023e&size=Original&disposition=inline|publisher=Alstom|accessdate=14 October 2015|deadurl=yes|archiveurl=https://web.archive.org/web/20160304121646/https://assets.partners.alstom.com/StreamedAsset.axd?assetid=eec46df7-20f4-4ca0-b084-48fd3bab023e&size=Original&disposition=inline|archivedate=4 March 2016|df=dmy-all}}</ref> The trains seat 378 people, with a total capacity of 1,100.<ref>{{cite news|last1=O'Rourke|first1=Jim|title=Sydney Metro Northwest: Transport minister unveils life-size model of Metropolis carriage|url=http://www.dailytelegraph.com.au/news/nsw/sydney-metro-northwest-transport-minister-unveils-life-size-model-of-metropolis-carriage/story-fni0cx12-1227597579623|accessdate=7 November 2015|website=The Daily Telegraph|date=5 November 2015}}</ref> The seating comes in the longitudinal configuration (running along the side walls of the carriages), in accordance with the style of most other metro trains.<ref>{{cite news|title=Alstom’s first ‘Make in India’ Metro inaugurated in Kochi|url=http://www.raillynews.com/2017/alstoms-first-make-india-metro-inaugurated-kochi/|work=raillynews.com|date=19 June 2017|accessdate=21 January 2018}}</ref>
Twenty-two 6-car [[Alstom Metropolis]] [[electric multiple units]] have been ordered for the network. Each single deck train will feature two dedicated areas for prams, luggage and bicycles. There will be three doors per side per carriage and no internal doors between the carriages.<ref>{{cite web|title=Case study: North West Rail Link, Sydney, Australia|url=https://assets.partners.alstom.com/StreamedAsset.axd?assetid=eec46df7-20f4-4ca0-b084-48fd3bab023e&size=Original&disposition=inline|publisher=Alstom|accessdate=14 October 2015|deadurl=yes|archiveurl=https://web.archive.org/web/20160304121646/https://assets.partners.alstom.com/StreamedAsset.axd?assetid=eec46df7-20f4-4ca0-b084-48fd3bab023e&size=Original&disposition=inline|archivedate=4 March 2016|df=dmy-all}}</ref> In a 6-car configuration the trains will sit 378 people, with a total capacity of 1,100.<ref>{{cite news|last1=O'Rourke|first1=Jim|title=Sydney Metro Northwest: Transport minister unveils life-size model of Metropolis carriage|url=http://www.dailytelegraph.com.au/news/nsw/sydney-metro-northwest-transport-minister-unveils-life-size-model-of-metropolis-carriage/story-fni0cx12-1227597579623|accessdate=7 November 2015|website=The Daily Telegraph|date=5 November 2015}}</ref> Seating arrangements on the Alstom trains will be longitudinal, in accordance with the style of most other metro trains.<ref>{{cite news|title=Alstom’s first ‘Make in India’ Metro inaugurated in Kochi|url=http://www.raillynews.com/2017/alstoms-first-make-india-metro-inaugurated-kochi/|work=raillynews.com|date=19 June 2017|accessdate=21 January 2018}}</ref>


A full-scale model of the new train has been built for use on public display, including at the annual [[Sydney Royal Easter Show]].<ref>{{Cite news|url=http://www.dailytelegraph.com.au/newslocal/rouse-hill-times/model-of-sydney-metro-train-will-provide-close-look-how-the-new-rail-link-will-transform-transport-in-nsw/news-story/324631cb383e29904402a89cb82ce488|title=Check out the Sydney Metro train|access-date=2017-07-29}}</ref><ref>{{Cite web|url=http://www.proj-x.com.au/news/portfolio-items/transport-nsw-sydney-metro-marquee-sydney-royal-easter-show-2016/|title=Transport for NSW Sydney Metro Marquee at the Sydney Royal Easter Show 2016 - Proj-X Design|website=www.proj-x.com.au|language=en-AU|access-date=2017-07-29}}</ref> It consists of the front carriage, including its distinctive nose. Members of the public are able to tour the inside of the mockup. It is approximately 75% of the length of the final design for the new carriages, having two doors instead of three.<ref>{{Cite web|url=https://www.sydneymetro.info/article/first-glimpse-new-metro-train|title=First glimpse of new Metro train {{!}} Sydney Metro|website=www.sydneymetro.info|language=en|access-date=2017-07-30}}</ref>
The trains were built in [[Sri City]], Andhra Pradesh, India.<ref>{{cite news|title=First metro trains arrive for new $8.3 billion line to Sydney's north west|url=http://www.smh.com.au/nsw/first-metro-trains-arrive-for-new-83-billion-line-to-sydneys-north-west-20170926-gyost6.html|accessdate=20 January 2018|work=Sydney Morning Herald|date=26 September 2017}}</ref> The first train arrived in Rouse Hill on 26 September 2017.<ref>{{Cite web|title=First Sydney Metro train arrives|work=NSW Government|url=https://www.sydneymetro.info/article/first-sydney-metro-train-arrives|date=26 September 2017|accessdate=27 September 2017}}</ref> Dynamic testing on the first of the trains began in February 2018.<ref name=":0">{{Cite news|url=http://www.metro-report.com/news/single-view/view/sydney-metro-train-on-test.html|title=Sydney metro train on test|last=UK|first=DVV Media|work=Metro Report|access-date=2018-02-11|language=en}}</ref>
 
These trains were built in [[Sri City]], [[Andhra Pradesh]], India.<ref>{{cite news|title=First metro trains arrive for new $8.3 billion line to Sydney's north west|url=http://www.smh.com.au/nsw/first-metro-trains-arrive-for-new-83-billion-line-to-sydneys-north-west-20170926-gyost6.html|accessdate=20 January 2018|work=Sydney Morning Herald|date=26 September 2017}}</ref> The first six-car Sydney Metro train arrived in Rouse Hill on 26 September 2017 and will undergo testing in the coming months.<ref>{{Cite web|title=First Sydney Metro train arrives|work=NSW Government|url=https://www.sydneymetro.info/article/first-sydney-metro-train-arrives|date=26 September 2017|accessdate=27 September 2017}}</ref>
 
In February 2018, dynamic testing on the first of the trainsets began.<ref name=":0">{{Cite news|url=http://www.metro-report.com/news/single-view/view/sydney-metro-train-on-test.html|title=Sydney metro train on test|last=UK|first=DVV Media|work=Metro Report|access-date=2018-02-11|language=en}}</ref> Testing is being done on brakes, passenger information displays, lighting and door operation.<ref>{{Cite web|url=https://www.sydneymetro.info/article/first-metro-train-testing|title=First Metro Train Testing {{!}} Sydney Metro|website=www.sydneymetro.info|language=en|access-date=2018-02-11}}</ref>


==Capacity==
==Capacity==

Revision as of 05:12, 13 February 2019


Sydney Metro is a future automated rapid transit system in Sydney, New South Wales, Australia. Sydney will be the first Australian city to build a metro system.[1][2] The network will be controlled by the Sydney Metro Authority and Transport for NSW, both of which are agencies of the New South Wales Government.[3] The network will be part of Transport for NSW's Opal ticketing system.

The first line is planned to consist of 31 stations and 66 km of track. It will be served by driverless, single deck trains, arriving every 4 minutes in peak hours and every 10 minutes at other times. The first section of this line, called Sydney Metro Northwest, is currently testing and is expected to open in mid 2019. It will link Rouse Hill to Chatswood. Construction has also commenced on Sydney Metro City & Southwest, an extension across Sydney Harbour, through the Central Business District (CBD) and then on to Bankstown.[4] This stage is expected to open in 2024.[5]

Sydney Metro West, a separate line between the Sydney CBD and Parramatta, was approved for financing by the New South Wales Government in June 2018[6] and is expected to open in the second half of the 2020s.

Sydney Metro Western Sydney Airport, a third line, is also in the early planning stages. This line is planned to provide a connection between the existing suburban railway station at St Marys and the new Western Sydney Airport.

History

Earlier proposals

Then-Co-ordinator-General of Rail Ron Christie released his "Long-term Strategic Plan for Rail" report in 2001, outlining long-term goals for the expansion of the rail network.[7] He suggested that after 2020 a number of "metro" lines that would be operationally independent from the existing network should be created.[8]

The idea for a metro resurfaced in late 2007, when discussions about an underground 'Anzac Line' took place within the New South Wales Government. The line would have run from West Ryde in Sydney's north-west to Malabar in the south-east. The line was never officially adopted as a government project and did not come to fruition.[9] In early 2008, following the shelving of various heavy rail expansion projects from the 2005 Metropolitan Rail Expansion Program, the Government officially announced the Template:Convert North West Metro.[10] Expected to cost $12 billion, it would have linked Rouse Hill in Sydney's north-west with the CBD, with construction starting in 2010 and finishing in 2017.[11]

Funding for the North West Metro was dependent on the privatisation of the electricity network,[12] and after a change of the state's premier in late 2008 it was cancelled due to budgetary concerns. Its replacement was the Template:Convert, CBD Metro, a dramatically shortened route running from Rozelle in the inner-west and into the CBD through to Central.[13] Construction was scheduled to start in 2010, like its predecessor, but finish earlier in 2015. The CBD Metro was to have formed the "central spine" of a future metro network, with a planned West Metro extension to Westmead and Parramatta to be constructed soon after, subject to federal funding.[14] The New South Wales Government's initial submission to the Australian Government body Infrastructure Australia for funding was rejected due to "a lack of integrated planning".[15]

Facing increased costs[16] and concerns about patronage[17], and following a change of premier, the CBD Metro was cancelled in early 2010.[18][19] The new premier, Kristina Keneally, chose instead to focus on expansion of the existing heavy rail network.[20]

Revival

In mid-2012 the newly elected Coalition government announced Sydney's Rail Future and the NSW Transport Masterplan.[21] Under this proposal, the North West Rail Link would be built as a single-deck, privately operated metro connecting to a future second harbour rail crossing.[22] These plans received criticism on the basis that they might not have the capacity of existing double-deck trains,[23] and concerns over the inability of trains on the existing network to use the new crossing.[24]

In 2014 the Government announced the second harbour crossing under the name Sydney Rapid Transit, as part of the 'Rebuilding NSW' infrastructure plan funded through the sale of electricity infrastructure.[25][26] The new railway would cross Sydney Harbour, tunnel beneath the CBD, and join the Bankstown line which would be converted to metro standards.[27]

The system was officially renamed 'Sydney Metro' in June 2015 following the passage of power privatisation bills.[28]

Under construction

Sydney Metro Northwest

The first stage will connect Sydney's north-western suburbs to Chatswood. Template:Convert of new track is planned between Rouse Hill and Epping, including eight new stations. The Template:Convert Epping to Chatswood rail link will then be converted to rapid transit standards and segregated from the existing Sydney Trains network.[29] Passengers will be able to interchange with the existing system at both Epping and Chatswood. Construction on Sydney Metro Northwest began in late 2013 and the first services are scheduled to start in 2019.[30]

In November 2016, Sydney Metro, in particular the John Holland Group, Dragados and Transport for NSW, were awarded the 2016 NSW Premier's Award for Building Infrastructure for the 15 km twin-tunnels in Bella Vista and Epping, which are currently the longest tunnels constructed in Australia.[31] The completion of these tunnels in early 2016 marked the completion of the first stage of Sydney Metro Northwest. The NSW Premier's award recognises "infrastructure projects in the state that make a difference to the local community".[31]

Sydney Metro City & Southwest

The second stage will extend Sydney Metro Northwest Template:Convert from Template:Rwsa on the North Shore, to Template:Rwsa in the city's south-west via the Sydney central business district. The centrepiece of the project is a new twin-tunnel rail crossing under Sydney Harbour. Together with planned improvements to the Main Western line, the project is expected to increase capacity on the Sydney rail network by up to 60%, and allow for the movement of over 100,000 extra commuters across the network every hour.[32] The City & Southwest extension represents the first phase of the "southern sector conversion" envisaged in Sydney's Rail Future.[5]

Proposed extensions

Sydney Metro West

Sydney Metro West is a separate line between the Sydney CBD and Westmead. Planning for the line is at an extremely early stage. Construction is expected to begin by 2022 and the line is expected to open in the second half of the 2020s.

Rolling stock

Twenty-two self-driving Alstom Metropolis electric multiple units have been ordered for the network. The trains come in a 6-car single deck configuration. Each train features two dedicated areas for prams, luggage and bicycles. There are three doors per side per carriage and no internal doors between the carriages.[33] The trains seat 378 people, with a total capacity of 1,100.[34] The seating comes in the longitudinal configuration (running along the side walls of the carriages), in accordance with the style of most other metro trains.[35]

The trains were built in Sri City, Andhra Pradesh, India.[36] The first train arrived in Rouse Hill on 26 September 2017.[37] Dynamic testing on the first of the trains began in February 2018.[38]

Capacity

Stage 1 is due to operate with 6-car trains running on 4 minute headways. After the addition of the Stage 2 extension to Bankstown the system will require at least 59 six-car trains to run every four minutes during peak periods. However the stations’ platforms will be configured to allow for future use of 8-car trains and the signalling system designed to allow for 2 minute headways, both of which are planned to be introduced once sufficient patronage demands it. Eight-car trains have a design capacity of 1,539 customers, and increasing the running frequency to ultimately 30 trains per hour (2 minute headway) would provide a maximum capacity of 46,170 passengers per hour per direction.[39] The line will run 21 or 22 hours.Template:Citation needed

Potential extensions

To Hurstville

The second phase of the southern sector conversion would see two of the four tracks between Sydenham and Hurstville, part of the Sydney Trains Illawarra line, converted to rapid transit and added to the Sydney Metro network. This would increase rail capacity between Hurstville and the city by 10 trains per hour. Though a precise construction timeframe was not provided, the plan envisages all work being completed by 2031. The Hurstville conversion would add eight stations and Template:Convert to the metro network.[5] Developing plans for this extension has proven difficult, and the Sydney Morning Herald reported in February 2016 that the project may have been dropped.[40]

Western Sydney routes

A scoping study into rail investment to service Western Sydney and the proposed Western Sydney Airport was announced by the New South Wales and Australian governments in November 2015.[41] A discussion paper was released in September 2016. The paper proposed various options that could provide a rail link to the airport, some of which are or are likely to be metro lines. The metro options are:[42]

Option Mode
Line to the Sydney Metro Northwest at Rouse Hill Likely to be metro
Extension of the Sydney Metro City & Southwest from Bankstown via Liverpool Metro
Line between Macarthur and Schofields via Western Sydney Airport and St Marys Likely to be metro

The paper also suggested two other potential metro projects: a new line between the Sydney CBD and Parramatta via Five Dock and Sydney Olympic Park and conversion of a section of the T2 Airport Line between the CBD and Revesby via the existing airport.[42] The New South Wales Government announced Sydney Metro West in November 2016, turning the CBD to Parramatta line into an official project of the government.

Template:Mapbox The study's final report was released in March 2018. It proposed two new lines to ultimately service the Western Sydney airport precinct: a "North-South Link" from Schofields to Macarthur and an "East-West Link" from Parramatta to the "Badgerys Creek Aerotropolis" - an area south of the airport. The report suggested that "a metro or light metro style of train would suit the North-South Link". The East-West Link could form an extension of Sydney Metro West. Two extensions of the initial metro line were also proposed: an extension of the northern section from Cudgegong Road to Schofields and an extension of the southern section from Bankstown to Liverpool.[43]

At the same time, the governments announced the development of a new rail line serving the airport. This line would form part of the North-South Link, running south from St Marys to the airport, before continuing on to the Badgerys Creek Aerotropolis. Funding for the line will be split 50:50 between the governments.[44] The line is scheduled to open by the time the airport opens in 2026.[45]

References

  1. "Sydney Metro: Info". sydneymetro.info. 13 July 2015. http://sydneymetro.info/home/documents/23011/download. 
  2. "Sydney Metro an Australian first". mondaq.com. 8 December 2009. http://www.mondaq.com/australia/x/90564/Sydneys+Metro+an+Australian+first. Retrieved 13 July 2015. 
  3. NSW, Transport for (18 May 2018). "All aboard Sydney Metro" (in en-AU). https://www.transport.nsw.gov.au/news-and-events/media-releases/all-aboard-sydney-metro. 
  4. Sanda, Dominica (22 June 2017). "Work on Sydney Harbour tunnels to start". Australian Associated Press. News Limited. http://www.news.com.au/national/breaking-news/sydney-harbour-metro-tunnelling-to-start/news-story/d34e019452cc98eb84afcdc156a139e1. Retrieved 22 June 2017. 
  5. 5.0 5.1 5.2 Transport for NSW (June 2012). Sydney's rail future: modernising Sydney's trains. http://www.transport.nsw.gov.au/sites/default/files/b2b/publications/sydneys-rail-future.pdf. 
  6. "New South Wales commits funds to the next Sydney Metro line". NextCity.org. 28 June 2018. https://nextcity.org/daily/entry/new-south-wales-commits-funds-to-the-next-sydney-metro-line. Retrieved 28 June 2018. 
  7. Template:Cite report
  8. Template:Cite report
  9. Besser, Linton (14 September 2007). "New east-west line may cut congestion". Fairfax Media. http://www.smh.com.au/news/national/new-sydney-tunnel-proposal/2007/09/13/1189276899575.html?page=fullpage#contentSwap1. Retrieved 14 June 2015. 
  10. Besser, Linton (26 February 2008). "Bye heavy rail, now for a north-west metro". Fairfax Media. http://www.smh.com.au/news/national/bye-heavy-rail-now-for-a-northwest-metro/2008/02/25/1203788248514.html?page=fullpage#contentSwap1. Retrieved 14 June 2015. 
  11. Iemma, Morris. "Premier Iemma unveils Sydney’s first Euro-style metro rail project". NSW Government. Archived from the original on 20 July 2008. https://web.archive.org/web/20080720202842/http://www.nsw.gov.au/docs/080318_Transport_SydneyLink.pdf. Retrieved 14 June 2015. 
  12. Gittins, Ross (17 March 2008). "Iemma's reasons for privatising electricity". The Sydney Morning Herald (Fairfax Media). http://www.smh.com.au/business/iemmas-reasons-for-privatising-electricity-20080316-1zsa.html. Retrieved 14 June 2015. 
  13. Benson, Simon (31 October 2008). "Northwest Metro rail link officially shelved". The Daily Telegraph (News Corp). http://www.dailytelegraph.com.au/news/nsw/northwest-metro-rail-disaster/story-e6freuzi-1111117906366. Retrieved 14 June 2015. 
  14. "Metro: The future of Sydney's transport". NSW Government. 30 June 2009. Archived from the original on 4 July 2009. https://web.archive.org/web/20090704030225/http://www.sydneymetro.nsw.gov.au/news/latest_news/west_metro/files/338/Metro_Thefutureoftransport.pdf. 
  15. Smith, Alexandra (6 February 2009). "'Inadequate' submission puts NSW down the list". The Sydney Morning Herald (Fairfax Media). http://www.smh.com.au/news/national/inadequate-submission-puts-nsw-down-the-list/2009/02/05/1233423405333.html. 
  16. Ralston, Nick (24 October 2008). "Rees reveals new Sydney Metro plan". The Sydney Morning Herald (Fairfax Media). http://www.smh.com.au//national/rees-reveals-new-sydney-metro-plan-20081024-57x2.html. Retrieved 14 June 2015. 
  17. Besser, Linton (4 May 2009). "CBD Metro will run almost empty". The Sydney Morning Herald (Fairfax Media). http://www.smh.com.au/national/cbd-metro-will-run-almost-empty-20090503-argd.html. 
  18. "Keneally rolls Rees and takes top job". AAP. ABC News. 4 December 2009. http://www.abc.net.au/news/2009-12-03/keneally-rolls-rees-and-takes-top-job/1168764. 
  19. "Keneally scraps CBD Metro plans". ABC/AAP. ABC News. 22 February 2010. http://www.abc.net.au/news/2010-02-21/keneally-scraps-cbd-metro-plans/338076. 
  20. Newman, Peter (23 February 2010). "An end to Sydney's transport lost years?". The Sydney Morning Herald (Fairfax Media). http://www.smh.com.au/federal-politics/political-opinion/an-end-to-sydneys-transport-lost-years-20100222-ornm.html. 
  21. "Sydney's Rail Future". Transport for NSW. June 2012. http://www.transport.nsw.gov.au/sites/default/files/b2b/publications/sydneys-rail-future.pdf. 
  22. Saulwick, Jacob (20 June 2012). "Sydney transport shake-up: plan for single deck metro-style trains and second harbour crossing". The Sydney Morning Herald (Fairfax Media). http://www.smh.com.au/nsw/sydney-transport-shakeup-plan-for-single-deck-metrostyle-trains-and-second-harbour-crossing-20120620-20ngm.html. 
  23. Saulwick, Jacob (23 September 2013). "Secret report casts doubt on train plan". The Sydney Morning Herald (Fairfax Media). http://www.smh.com.au/nsw/secret-report-casts-doubt-on-train-plan-20130922-2u7zg.html. 
  24. Saulwick, Jacob (4 July 2012). "Tunnel too small could make rail link a bridge too far". Drive (Fairfax Media). http://www.drive.com.au/roads-and-traffic/tunnel-too-small-could-make-rail-link-a-bridge-too-far-20120703-21fjy.html. 
  25. "Transforming Sydney: Sydney Rapid Transit". Transport for NSW. November 2014. http://www.nsw.gov.au/sites/default/files/miscellaneous/sydney-rapid-transit_sis2014.pdf. 
  26. "Rebuilding NSW". NSW Government. November 2014. http://www.nsw.gov.au/rebuilding. Retrieved 15 June 2015. 
  27. Geralthy, Sarah; Liz, Foschia (11 June 2014). "Sydney rapid transit rail build could begin in three years, NSW Transport Minister Gladys Berejiklian says". ABC News. http://www.abc.net.au/news/2014-06-11/sydney-rapid-transit-rail-could-begin-gladys-berejiklian/5515186. 
  28. "Funding secured: Sydney Metro to be a reality". Transport for NSW. 4 June 2015. Archived from the original on 23 June 2015. https://web.archive.org/web/20150623191517/http://www.transport.nsw.gov.au/media-releases/funding-secured-sydney-metro-be-reality. 
  29. "Green light for the North West Rail Link". Transport for NSW. June 2013. http://nwrail.transport.nsw.gov.au/NorthWestRailLink/handlers/DownloadMediaFile.ashx?file=~/NorthWestRailLink/media/NWRL/Original/newsletter/13180-Project-newsletter-update_ALIGNMENT_6pp_LR.pdf?ext=.pdf. Retrieved 7 November 2015. 
  30. "Construction ramps up as Showground Station site is cleared". Transport for NSW. 23 October 2013. Archived from the original on 7 November 2015. https://web.archive.org/web/20151107200612/http://nwrail.transport.nsw.gov.au/News/Latest-news/Construction-ramps-up-as-Showground-Station-site-i. Retrieved 7 November 2015. 
  31. 31.0 31.1 "Sydney Metro receives awards for excellence". Trenchless Australasia. 28 November 2016. https://www.trenchless-australasia.com/2016/11/28/sydney-metro-receives-awards-excellence/. Retrieved 28 November 2016. 
  32. Walker, Ian. "Construction begins on second Sydney Harbour rail crossing". http://www.dailytelegraph.com.au/news/nsw/construction-begins-on-second-sydney-harbour-rail-crossing/story-fni0cx12-1227296245667. Retrieved 23 April 2015. 
  33. "Case study: North West Rail Link, Sydney, Australia". Alstom. Archived from the original on 4 March 2016. https://web.archive.org/web/20160304121646/https://assets.partners.alstom.com/StreamedAsset.axd?assetid=eec46df7-20f4-4ca0-b084-48fd3bab023e&size=Original&disposition=inline. Retrieved 14 October 2015. 
  34. O'Rourke, Jim (5 November 2015). "Sydney Metro Northwest: Transport minister unveils life-size model of Metropolis carriage". http://www.dailytelegraph.com.au/news/nsw/sydney-metro-northwest-transport-minister-unveils-life-size-model-of-metropolis-carriage/story-fni0cx12-1227597579623. Retrieved 7 November 2015. 
  35. "Alstom’s first ‘Make in India’ Metro inaugurated in Kochi". raillynews.com. 19 June 2017. http://www.raillynews.com/2017/alstoms-first-make-india-metro-inaugurated-kochi/. Retrieved 21 January 2018. 
  36. "First metro trains arrive for new $8.3 billion line to Sydney's north west". Sydney Morning Herald. 26 September 2017. http://www.smh.com.au/nsw/first-metro-trains-arrive-for-new-83-billion-line-to-sydneys-north-west-20170926-gyost6.html. Retrieved 20 January 2018. 
  37. "First Sydney Metro train arrives". NSW Government. 26 September 2017. https://www.sydneymetro.info/article/first-sydney-metro-train-arrives. Retrieved 27 September 2017. 
  38. UK, DVV Media. "Sydney metro train on test" (in en). Metro Report. http://www.metro-report.com/news/single-view/view/sydney-metro-train-on-test.html. 
  39. "SYDNEY METRO CITY & SOUTHWEST | BUSINESS CASE SUMMARY". Transport for NSW. http://www.sydneymetro.info/sites/default/files/Sydney%20Metro%20CSW%20Business%20Case%20Summary.pdf. Retrieved 28 February 2017. 
  40. O'Sullivan, Matt; Saulwick, Jacob (3 February 2016). "Plan to extend Sydney metro line south hits growing list of hurdles". The Sydney Morning Herald. http://www.smh.com.au/nsw/plan-to-extend-sydney-metro-line-south-hits-growing-list-of-hurdles-20160201-gmj9dz.html. 
  41. "Western Sydney Airport". Transport for NSW. Archived from the original on 2 March 2016. https://web.archive.org/web/20160302024021/http://www.transport.nsw.gov.au/projects-western-sydney-airport. Retrieved 18 February 2016. 
  42. 42.0 42.1 "Western Sydney Rail Needs Scoping Study: Chapter 6 - The options". Transport for NSW. September 2016. https://s3-ap-southeast-2.amazonaws.com/ehq-production-australia/0add6de478ff4de8026af9de0d5b405fe855defa/documents/attachments/000/039/120/original/TfNSW_WSRN_DiscussionPaper_Ch6.pdf?1473927884. 
  43. "Western Sydney Rail Needs Scoping Study Outcomes Report". Australian Government and New South Wales Government. March 2018. pp. 7–11, 54–60. https://cities.infrastructure.gov.au/22446/documents/72491. Retrieved 7 March 2018. 
  44. "Western Sydney City Deal to deliver rail, investment and jobs". Transport for NSW. 4 March 2018. https://www.transport.nsw.gov.au/news-and-events/media-releases/western-sydney-city-deal-to-deliver-rail-investment-and-jobs. Retrieved 6 March 2018. 
  45. "Western Sydney City Deal - Connectivity". Department of Infrastructure, Regional Development and Cities. https://cities.infrastructure.gov.au/22446/documents/72484. Retrieved 16 March 2018. 

Attribution

The first revision of this article was based on the following revision of the English Wikipedia article "Sydney Metro": https://en.wikipedia.org/w/index.php?title=Sydney_Metro&oldid=881055615.


External links

NSW Government Sydney Metro Website