Wikisage, the free encyclopedia of the second generation, is digital heritage
CBD and South East Light Rail: Difference between revisions
(→Construction: testing along most of the line expected in August; make references more consistent) |
(add opening date) |
||
(3 intermediate revisions by the same user not shown) | |||
Line 15: | Line 15: | ||
|type = | |type = | ||
|system = | |system = | ||
|status = | |status = | ||
|locale = | |locale = | ||
|start = [[#Circular Quay|]] | |start = [[#Circular Quay|]] | ||
Line 23: | Line 23: | ||
|daily_ridership = | |daily_ridership = | ||
|ridership2 = | |ridership2 = | ||
|open = | |open = 14 December 2019 | ||
|close = | |close = | ||
|authority = [[Transport for NSW]] | |authority = [[Transport for NSW]] | ||
Line 55: | Line 54: | ||
}} | }} | ||
The '''CBD and South East Light Rail''' is a | The '''CBD and South East Light Rail''' is a [[light rail]] line in the Australian city of [[Sydney]], New South Wales, running from [[wikipedia:Circular Quay|Circular Quay]] at the northern end of the [[wikipedia:Sydney central business district|central business district]] to the south-eastern suburbs of [[wikipedia:Randwick, New South Wales|Randwick]] and [[wikipedia:Kingsford, New South Wales|Kingsford]]. The line is part of [[Light rail in Sydney|Sydney's light rail network]]. Services are branded as the L2 Randwick Line and L3 Kingsford Line. The L2 Randwick Line opened in December 2019 and the L3 Kingsford Line is set to open in March 2020. Operation and maintenance of the CBD and South East Light Rail is contracted to the ALTRAC Light Rail consortium by the New South Wales Government's transport authority, [[Transport for NSW]]. Services are operated by [[wikipedia:Transdev Sydney|Transdev Sydney]] as a member of ALTRAC Light Rail. | ||
== Background and initial announcement == | == Background and initial announcement == | ||
{{Sydney public transport services|light rail=}} | {{Sydney public transport services|light rail=}} | ||
Since the light rail network's [[Inner West Light Rail|original line]] opened in 1997, a line through the [[wikipedia:Sydney central business district|Sydney central business district]] had been suggested numerous times but failed to achieve the support of the New South Wales Government. This changed in February 2010 when the Keneally Government announced a new line from Haymarket to Circular Quay via Barangaroo.<ref>{{cite press release | Since the light rail network's [[Inner West Light Rail|original line]] opened in 1997, a line through the [[wikipedia:Sydney central business district|Sydney central business district]] had been suggested numerous times but failed to achieve the support of the New South Wales Government. This changed in February 2010 when the Keneally Government announced a new line from Haymarket to Circular Quay via Barangaroo.<ref>{{cite press release |title=Transport plan for Sydney |date=21 February 2010 |publisher=New South Wales Governemnt |format=PDF |accessdate=25 February 2011 |archiveurl= https://web.archive.org/web/20110312213829/http://www.nsw.gov.au/sites/default/files/uploads/common/Transport%20Overview%20Statement.pdf |archivedate=12 March 2011 |url= http://www.nsw.gov.au/sites/default/files/uploads/common/Transport%20Overview%20Statement.pdf }}</ref> The final route was not decided, with the three options being to send the line north via George Street, Sussex Street or a loop using both.<ref>{{cite press release |title=Work underway on $500 million Sydney light rail revolution |date=14 August 2010 |publisher=New South Wales Government |format=PDF|accessdate=25 February 2011 |archiveurl = https://web.archive.org/web/20110217070742/http://www.transport.nsw.gov.au/sites/default/files/releases/100814_work_underway_on_500_million_sydney_light_rail_revolution.pdf |archivedate=17 February 2011 |url = http://www.transport.nsw.gov.au/sites/default/files/releases/100814_work_underway_on_500_million_sydney_light_rail_revolution.pdf }}</ref> | ||
When the O'Farrell Government took office in March 2011, it committed to building a line through the CBD to Barangaroo, with a preferred route along George Street.<ref>{{cite news |url = http://southern-courier.whereilive.com.au/news/story/premier-barry-ofarrell-promises-light-rail-revolution/ |archiveurl=https://web.archive.org/web/20120115031830/http://southern-courier.whereilive.com.au/news/story/premier-barry-ofarrell-promises-light-rail-revolution |archivedate=15 January 2012 |title = Premier Barry O'Farrell promises light rail revolution|work=The Daily Telegraph |date = 9 July 2011 |accessdate=14 December 2012 | | When the O'Farrell Government took office in March 2011, it committed to building a line through the CBD to Barangaroo, with a preferred route along George Street.<ref>{{cite news |url = http://southern-courier.whereilive.com.au/news/story/premier-barry-ofarrell-promises-light-rail-revolution/ |archiveurl=https://web.archive.org/web/20120115031830/http://southern-courier.whereilive.com.au/news/story/premier-barry-ofarrell-promises-light-rail-revolution |archivedate=15 January 2012 |title=Premier Barry O'Farrell promises light rail revolution|work=The Daily Telegraph |date = 9 July 2011 |accessdate=14 December 2012 |last=Clennell |first=Andrew }}</ref><ref name="SMHJun11">{{cite news |url=http://www.smh.com.au/nsw/light-rail-brought-on-board-multitrip-tickets-20110613-1g0jb.html |title=Light rail brought on board multi-trip tickets |work=The Sydney Morning Herald |date=14 June 2011 |accessdate=9 December 2011 |last=Saulwick |first=Jacob }}</ref><ref name=TransportMin8Dec11>{{cite press release |url = http://yoursayrandwick.com.au/document/show/262 |title=Expanding light rail - potential routes shortlisted |publisher=Ministry for Transport |date=8 December 2011 |accessdate=9 December 2011}}</ref> It also committed to conducting feasibility studies into the construction of lines from the City to Sydney University and the City to the University of New South Wales.<ref name="SMHJun11" /><ref>{{cite web |title=Sydney Light Rail Program |url=http://www.transport.nsw.gov.au/lightrail-program |publisher=Transport for NSW |accessdate=30 June 2013 |archive-url=https://web.archive.org/web/20130507080151/http://www.transport.nsw.gov.au/lightrail-program# |archive-date=7 May 2013 |dead-url=yes }}</ref> On 8 December 2011, the government announced shortlisted potential routes for these extensions.<ref name="TransportMin8Dec11" /> In 2012, Transport for NSW decided the routes to Sydney University and Barangaroo via The Rocks provided fewer customer benefits and were considered a lower priority. A route from Circular Quay to the University of New South Wales via Central station was seen as the best option.<ref>{{cite web |title=CBD and South East Light Rail |url=http://www.transport.nsw.gov.au/lightrail-program/cbd-and-south-east-light-rail |publisher=Transport for NSW }}</ref> | ||
On 13 December 2012, the government announced a commitment to build a $1.6 billion line from Circular Quay down George Street to Central station, then across to | On 13 December 2012, the government announced a commitment to build a $1.6 billion line from Circular Quay down George Street to Central station, then across to Moore Park and down Anzac Parade with branches to Kingsford and Randwick.<ref name="TransportNSW13Dec12">{{cite web |url=http://engage.haveyoursay.nsw.gov.au/document/show/601 |title=Sydney's Light Rail Future |publisher=Transport for NSW |date=13 December 2012 |accessdate=14 December 2012 |pages=9, 13, 14–17, 24 |deadurl=yes |archiveurl=https://web.archive.org/web/20130410121516/http://engage.haveyoursay.nsw.gov.au/document/show/601 |archivedate=10 April 2013}}</ref> Construction was expected to begin in 2014 and to take five to six years.<ref name="TransportNSW13Dec12" /><ref>{{cite news |url=http://www.dailytelegraph.com.au/news/trams-will-track-sydneys-transport-future/story-e6freuy9-1226536459334 |title=Trams will track Sydney's transport future |work=The Daily Telegraph |accessdate=14 December 2012 |date=14 December 2012 |last1=Campion |first1=Vikki |last2 = Wood |firt2=Alicia}}</ref> | ||
== Design == | == Design == | ||
Line 72: | Line 71: | ||
The route is mostly on-street but includes an off-street section through Moore Park. The only major engineering works on the line are a new bridge over the Eastern Distributor and a tunnel under Moore Park and Anzac Parade. | The route is mostly on-street but includes an off-street section through Moore Park. The only major engineering works on the line are a new bridge over the Eastern Distributor and a tunnel under Moore Park and Anzac Parade. | ||
Several changes to the design were announced in December 2014. The major changes involve revising platform lengths at all stops to support an increase in the length of the trams from 45m to 67m, redesigning several stops, switching technologies for the delivery of the wire-free section and the removal of a proposed stop at World Square. It was also announced that the projected cost had increased from $1.6 billion to $2.2 billion. The government claimed the increase was due to the design modifications, but a 2016 report produced by the Audit Office of New South Wales found that the increase was largely due to Transport for NSW underestimating the cost of the project.<ref name="dec design adjustment">{{cite web |url = http://www.transport.nsw.gov.au/media-releases/cbd-and-south-east-light-rail-improvements-deliver-better-service-customers |title = CBD and South East Light Rail improvements to deliver a better service for customers |date=2 December 2014 |publisher=Transport for NSW |archive-url=https://web.archive.org/web/20141214174608/http://www.transport.nsw.gov.au/media-releases/cbd-and-south-east-light-rail-improvements-deliver-better-service-customers |archive-date=14 December 2014}}</ref><ref> | Several changes to the design were announced in December 2014. The major changes involve revising platform lengths at all stops to support an increase in the length of the trams from 45m to 67m, redesigning several stops, switching technologies for the delivery of the wire-free section and the removal of a proposed stop at World Square. It was also announced that the projected cost had increased from $1.6 billion to $2.2 billion. The government claimed the increase was due to the design modifications, but a 2016 report produced by the Audit Office of New South Wales found that the increase was largely due to Transport for NSW underestimating the cost of the project.<ref name="dec design adjustment">{{cite web |url=http://www.transport.nsw.gov.au/media-releases/cbd-and-south-east-light-rail-improvements-deliver-better-service-customers |title=CBD and South East Light Rail improvements to deliver a better service for customers |date=2 December 2014 |publisher=Transport for NSW |archive-url=https://web.archive.org/web/20141214174608/http://www.transport.nsw.gov.au/media-releases/cbd-and-south-east-light-rail-improvements-deliver-better-service-customers |archive-date=14 December 2014}}</ref><ref>{{cite web |title=Sydney light rail line costs blow out to $2.2 billion – $600 million more than budgeted |url=http://www.smh.com.au/nsw/sydney-light-rail-line-costs-blow-out-to-22-billion--600-million-more-than-budgeted-20141109-11jazn.html |work=The Sydney Morning Herald |date=10 November 2014 |archiveurl= |archivedate=}}</ref><ref>{{cite web |title=Costs are higher and benefits are lower than the approved business case |url=http://www.audit.nsw.gov.au/publications/latest-reports/performance/cbd-and-south-east-light-rail-project/executive-summary/1-executive-summary |publisher=Audit Office of New South Wales |accessdate=1 December 2016 |date=30 November 2016 }}</ref> | ||
The design included the creation of a pedestrian zone along approximately 40% of George Street, between Bathurst and Hunter streets.<ref name="TransportNSW13Dec12" /><ref name="SSIA Supporting Document">{{cite web |url=http://www.transport.nsw.gov.au/sites/default/files/b2b/projects/CSELR_State_Infrastructure_Application_June_2013.pdf |title=CBD and South East Light Rail - State Significant Infrastructure Application Supporting Document |publisher=Transport for NSW |date=21 June 2013 |accessdate=12 July 2013 |page=23 |format=PDF |deadurl=yes |archiveurl=https://web.archive.org/web/20130927100041/http://www.transport.nsw.gov.au/sites/default/files/b2b/projects/CSELR_State_Infrastructure_Application_June_2013.pdf |archivedate=27 September 2013}}</ref><ref>Modifications Report December 2014, pg1</ref> | |||
The section between Bathurst Street and Circular Quay will be wire-free.<ref>{{cite news |last=Campion|first=Vikki |title=Sydney's new light rail system will feature futuristic wire-free trams to ensure clutter-free streets |url = http://www.dailytelegraph.com.au/news/nsw/sydney8217s-new-light-rail-system-will-feature-futuristic-wirefree-trams-to-ensure-clutterfree-streets/story-fni0cx12-1226714773633 |newspaper=Daily Telegraph }}</ref> This was originally to have been achieved by equipping the trams with batteries and providing recharging facilities at stops. This was changed to the proprietary ground-level power supply technology of the tram supplier, [[wikipedia:Alstom|Alstom]]. | The section between Bathurst Street and Circular Quay will be wire-free.<ref>{{cite news |last=Campion|first=Vikki |title=Sydney's new light rail system will feature futuristic wire-free trams to ensure clutter-free streets |url=http://www.dailytelegraph.com.au/news/nsw/sydney8217s-new-light-rail-system-will-feature-futuristic-wirefree-trams-to-ensure-clutterfree-streets/story-fni0cx12-1226714773633 |newspaper=The Daily Telegraph}}</ref> This was originally to have been achieved by equipping the trams with batteries and providing recharging facilities at stops. This was changed to the proprietary ground-level power supply technology of the tram supplier, [[wikipedia:Alstom|Alstom]]. | ||
The line is designed to handle special events in the Moore Park precinct and at Royal Randwick Racecourse. Events at Moore Park were initially planned to be served using two coupled trams <!--{{convert|-->90<!--|-->m<!--}}--> long, with double length platforms at the Central Station and Moore Park stops.<ref name="SSIA Supporting Document" /><ref>Modification Report December 2014, p. 25.</ref> Following the decision to increase the length of the trams to <!--{{convert|-->67<!--|-->m<!--}}-->, the plans to operate coupled trams were abandoned. | The line is designed to handle special events in the Moore Park precinct and at Royal Randwick Racecourse. Events at Moore Park were initially planned to be served using two coupled trams <!--{{convert|-->90<!--|-->m<!--}}--> long, with double length platforms at the Central Station and Moore Park stops.<ref name="SSIA Supporting Document" /><ref>Modification Report December 2014, p. 25.</ref> Following the decision to increase the length of the trams to <!--{{convert|-->67<!--|-->m<!--}}-->, the plans to operate coupled trams were abandoned. | ||
A depot for the trams | A depot for the trams was built at the north-western corner of Royal Randwick Racecourse, providing stabling facilities and allowing light maintenance. Heavy maintenance is conducted at the former [[wikipedia:Metropolitan Goods railway line|Rozelle railway yard]] at [[wikipedia:Lilyfield, New South Wales|Lilyfield]], with access to the facility provided via the [[Inner West Light Rail]].<ref name="SSIA Supporting Document" /> | ||
==Construction== | ==Construction== | ||
<!--[[File:Light rail works on George Street Sydney July 2017.jpg|thumb|Construction work on George Street in July 2017]]--> | <!--[[File:Light rail works on George Street Sydney July 2017.jpg|thumb|Construction work on George Street in July 2017]]--> | ||
The line | The line was built as a public-private partnership, with the contract covering detailed design, major construction, operation and maintenance of the line as well as the provision of rolling stock. A contract for early construction works was awarded to Laing O'Rourke in July 2014.<ref>{{cite web |title=Laing O'Rourke has been awarded the first contract to return light rail to the centre of the Sydney CBD. |url=http://www.laingorourke.com/media/news-releases/2014/returning-light-rail-to-sydney.aspx |publisher=Laing O'Rourke |date=1 July 2014}}</ref> | ||
In February 2014, three consortia were short listed for the main contract - covering the construction and operation of the line:<ref>{{cite web |title=Tender out to deliver and operate Sydney's Light Rail Network |url=http://www.transport.nsw.gov.au/media-releases/tender-out-deliver-and-operate-sydneys-light-rail-network |publisher=Transport for NSW |date=7 March 2014 |archiveurl=https://web.archive.org/web/20140313103856/http://www.transport.nsw.gov.au/media-releases/tender-out-deliver-and-operate-sydneys-light-rail-network# |archivedate=13 March 2014}}</ref><ref>{{cite web |title=Three shortlisted for Sydney light rail PPP |url=http://www.railjournal.com/index.php/australia-nz/three-shortlisted-for-sydney-light-rail-ppp.html?channel=541 |publisher=International Railway Journal |date=20 February 2014 |archiveurl= |archivedate=}}</ref> | In February 2014, three consortia were short listed for the main contract - covering the construction and operation of the line:<ref>{{cite web |title=Tender out to deliver and operate Sydney's Light Rail Network |url=http://www.transport.nsw.gov.au/media-releases/tender-out-deliver-and-operate-sydneys-light-rail-network |publisher=Transport for NSW |date=7 March 2014 |archiveurl=https://web.archive.org/web/20140313103856/http://www.transport.nsw.gov.au/media-releases/tender-out-deliver-and-operate-sydneys-light-rail-network# |archivedate=13 March 2014}}</ref><ref>{{cite web |title=Three shortlisted for Sydney light rail PPP |url=http://www.railjournal.com/index.php/australia-nz/three-shortlisted-for-sydney-light-rail-ppp.html?channel=541 |publisher=International Railway Journal |date=20 February 2014 |archiveurl= |archivedate=}}</ref> | ||
Line 97: | Line 96: | ||
Major construction commenced on 23 October 2015, beginning in the section of George Street between King and Market Streets. To minimise disruption along the length of the corridor, works were intended to be staggered across 31 construction zones. The first section of track in the CBD was laid in December 2016, by which time a total of 410 metres of track had already been laid across the project.<ref>{{cite web |title=Cementing a new era on George Street with first light rail tracks |url=http://www.transport.nsw.gov.au/newsroom/media-releases/cementing-new-era-george-street-first-light-rail-tracks |publisher=Transport for NSW |date=19 December 2016}}</ref> This increased to around 5 kilometres of track by May 2017.<ref>{{cite web |title=Light Rail comes to the Quay |url=http://www.transport.nsw.gov.au/newsroom/media-releases/light-rail-comes-quay |publisher=Transport for NSW |date=4 May 2017}}</ref> By October 2017, track laying had been completed in seven of the 31 zones along the alignment.<ref>{{cite news |last=O'Sullivan |first=Matt |title=Sydney retailers face yet another Christmas of rail disruption |url=https://www.smh.com.au/national/nsw/sydney-retailers-face-yet-another-christmas-of-rail-disruption-20171011-gyylzb.html |accessdate=12 March 2018 |work=The Sydney Morning Herald |date=15 October 2017}}</ref> | Major construction commenced on 23 October 2015, beginning in the section of George Street between King and Market Streets. To minimise disruption along the length of the corridor, works were intended to be staggered across 31 construction zones. The first section of track in the CBD was laid in December 2016, by which time a total of 410 metres of track had already been laid across the project.<ref>{{cite web |title=Cementing a new era on George Street with first light rail tracks |url=http://www.transport.nsw.gov.au/newsroom/media-releases/cementing-new-era-george-street-first-light-rail-tracks |publisher=Transport for NSW |date=19 December 2016}}</ref> This increased to around 5 kilometres of track by May 2017.<ref>{{cite web |title=Light Rail comes to the Quay |url=http://www.transport.nsw.gov.au/newsroom/media-releases/light-rail-comes-quay |publisher=Transport for NSW |date=4 May 2017}}</ref> By October 2017, track laying had been completed in seven of the 31 zones along the alignment.<ref>{{cite news |last=O'Sullivan |first=Matt |title=Sydney retailers face yet another Christmas of rail disruption |url=https://www.smh.com.au/national/nsw/sydney-retailers-face-yet-another-christmas-of-rail-disruption-20171011-gyylzb.html |accessdate=12 March 2018 |work=The Sydney Morning Herald |date=15 October 2017}}</ref> | ||
Testing commenced on a short section of the line along Alison Road in February 2018.<ref>{{cite web |title=Testing begins on Sydney CBD and South East LRT |url=http://www.metro-report.com/news/news-by-region/asia-pacific-ex-china/single-view/view/testing-begins-on-sydneys-cbd-south-east-light-rail.html |publisher=Metro Report International |date=28 February 2018 |archiveurl= |archivedate=}}</ref> It | Testing commenced on a short section of the line along Alison Road in February 2018.<ref>{{cite web |title=Testing begins on Sydney CBD and South East LRT |url=http://www.metro-report.com/news/news-by-region/asia-pacific-ex-china/single-view/view/testing-begins-on-sydneys-cbd-south-east-light-rail.html |publisher=Metro Report International |date=28 February 2018 |archiveurl= |archivedate=}}</ref> It reached Circular Quay in July 2019.<ref name="smh 2019-07-30">{{cite news |title=Near misses spark warning as Sydney's new trams reach Circular Quay |last=O'Sullivan |first=Matt |url=https://www.smh.com.au/national/nsw/near-misses-spark-warning-as-sydney-s-new-trams-reach-circular-quay-20190730-p52c02.html |work=The Sydney Morning Herald |date=30 July 2019}}</ref> This enabled testing to take place along the entire line (apart from the Kingsford branch). | ||
===Delays===<!-- | ===Delays===<!-- | ||
Line 107: | Line 106: | ||
|footer = Four construction sites in April 2018 - the month major construction was due to be completed | |footer = Four construction sites in April 2018 - the month major construction was due to be completed | ||
}}--> | }}--> | ||
Construction | Construction of the line suffered from significant delays. Major construction of the project was due to conclude in April 2018, though finishing works were to continue for some time after.<ref name=TfNSW28May15>{{cite web |title=Final countdown to construction: Sydney Light Rail major works start October 23 |url=http://www.transport.nsw.gov.au/media-releases/final-countdown-construction-sydney-light-rail-major-works-start-october-23 |publisher=Transport for NSW |date=28 May 2015}}</ref><ref>{{cite news |last1=Saulwick |first1=Jacob |title=Bike lanes out as George Street light rail project takes off |url=http://www.smh.com.au/nsw/bike-lanes-out-as-george-street-light-rail-project-takes-off-20150528-ghbamo.html |accessdate=28 May 2015 |work=The Sydney Morning Herald |date=28 May 2015}}</ref> | ||
Delays at two zones in the CBD were announced in August 2016. Originally meant to be completed before Christmas 2016, construction work at these zones was to continue for several months longer than originally anticipated.<ref>{{cite news |last1=Hawke |first1=Sarah |title=Sydney light rail construction delayed after disused underground utilities found |url=http://www.abc.net.au/news/2016-08-09/light-rail-construction-to-cause-sydney-cbd-delays/7704766?WT.ac=localnews_sydney |work=ABC News |date=9 August 2016}}</ref> The zones were eventually opened around a year after the planned completion date.<ref>{{cite web|title=Christmas coming to the CBD|url=http://sydneylightrail.transport.nsw.gov.au/news/christmas-coming-cbd|website=Sydney Light Rail|publisher=Transport for NSW|accessdate=13 March 2018|date=30 November 2017}}</ref> Further delays to the project arose during 2016.<ref name="SMH 2016-12-05">{{cite news |last1=O'Sullivan |first1=Matt |title=More delays dog Sydney's $2.1 billion light rail line amid backroom squabbling |url=http://www.smh.com.au/nsw/more-delays-dog-sydneys-21-billion-light-rail-line-amid-backroom-squabbling-20161201-gt2cq8.html |work=The Sydney Morning Herald |date=5 December 2016}}</ref> | Delays at two zones in the CBD were announced in August 2016. Originally meant to be completed before Christmas 2016, construction work at these zones was to continue for several months longer than originally anticipated.<ref>{{cite news |last1=Hawke |first1=Sarah |title=Sydney light rail construction delayed after disused underground utilities found |url=http://www.abc.net.au/news/2016-08-09/light-rail-construction-to-cause-sydney-cbd-delays/7704766?WT.ac=localnews_sydney |work=ABC News |date=9 August 2016}}</ref> The zones were eventually opened around a year after the planned completion date.<ref>{{cite web|title=Christmas coming to the CBD|url=http://sydneylightrail.transport.nsw.gov.au/news/christmas-coming-cbd|website=Sydney Light Rail|publisher=Transport for NSW|accessdate=13 March 2018|date=30 November 2017}}</ref> Further delays to the project arose during 2016.<ref name="SMH 2016-12-05">{{cite news |last1=O'Sullivan |first1=Matt |title=More delays dog Sydney's $2.1 billion light rail line amid backroom squabbling |url=http://www.smh.com.au/nsw/more-delays-dog-sydneys-21-billion-light-rail-line-amid-backroom-squabbling-20161201-gt2cq8.html |work=The Sydney Morning Herald |date=5 December 2016}}</ref> | ||
By the beginning of 2018 the whole project was significantly behind schedule. In March 2018 - one month before major works were originally due to be completed - the Transport Minister declined to put a date on when he expected construction of the line to be finished, but noted the government was "an unhappy customer" of the ALTRAC consortium.<ref>{{cite news|last1=O'Sullivan|first1=Matt|title=Credit card payments for trips expanded across ferries, light rail|url=https://www.smh.com.au/national/nsw/credit-card-payments-for-trips-expanded-across-ferries-light-rail-20180312-p4z3xo.html|accessdate=12 March 2018|work=The Sydney Morning Herald|date=12 March 2018}}</ref> | By the beginning of 2018 the whole project was significantly behind schedule. In March 2018 - one month before major works were originally due to be completed - the Transport Minister declined to put a date on when he expected construction of the line to be finished, but noted the government was "an unhappy customer" of the ALTRAC consortium.<ref>{{cite news |last1=O'Sullivan |first1=Matt |title=Credit card payments for trips expanded across ferries, light rail |url=https://www.smh.com.au/national/nsw/credit-card-payments-for-trips-expanded-across-ferries-light-rail-20180312-p4z3xo.html |accessdate=12 March 2018 |work=The Sydney Morning Herald |date=12 March 2018}}</ref> | ||
The relationship deteriorated between the New South Wales Government and Acciona Infrastructure – the construction company delivering the line. A media report from December 2016 claimed a dispute had arisen between the parties over costs incurred from modifications to the line's design.<ref name="SMH 2016-12-05" /> Acciona commenced legal action against the government in April 2018. The company sought additional payments totalling $1.2 billion.<ref>{{cite news |last1=Cockburn |first1=Paige |title=Sydney light rail contractor Acciona suing NSW Government; further delays to construction likely |url=http://www.abc.net.au/news/2018-04-07/light-rail-contractor-sues-nsw-government/9629948 |accessdate=7 April 2018 |work=ABC News |date=7 April 2018}}</ref> Later in the month ALTRAC told the government it was working towards a completion date of March 2020.<ref>{{cite news |last1=Gerathy |first1=Sarah |title=Sydney's light rail is one year behind schedule, now set for 2020 finish |url=http://www.abc.net.au/news/2018-04-19/sydney-light-rail-is-one-year-behind-schedule/9674512 |accessdate=19 April 2018 |work=ABC News |date=19 April 2018}}</ref> | The relationship deteriorated between the New South Wales Government and Acciona Infrastructure – the construction company delivering the line. A media report from December 2016 claimed a dispute had arisen between the parties over costs incurred from modifications to the line's design.<ref name="SMH 2016-12-05" /> Acciona commenced legal action against the government in April 2018. The company sought additional payments totalling $1.2 billion.<ref>{{cite news |last1=Cockburn |first1=Paige |title=Sydney light rail contractor Acciona suing NSW Government; further delays to construction likely |url=http://www.abc.net.au/news/2018-04-07/light-rail-contractor-sues-nsw-government/9629948 |accessdate=7 April 2018 |work=ABC News |date=7 April 2018}}</ref> Later in the month ALTRAC told the government it was working towards a completion date of March 2020.<ref>{{cite news |last1=Gerathy |first1=Sarah |title=Sydney's light rail is one year behind schedule, now set for 2020 finish |url=http://www.abc.net.au/news/2018-04-19/sydney-light-rail-is-one-year-behind-schedule/9674512 |accessdate=19 April 2018 |work=ABC News |date=19 April 2018}}</ref> | ||
Line 117: | Line 116: | ||
In October 2018, Acciona stated the project would not be completed until May 2020.<ref>{{Cite news |url=http://www.abc.net.au/news/2018-10-04/sydney-light-rail-delayed-again-and-will-not-open-until-may-2020/10337658 |title=Sydney Light Rail delayed again, completion now May 2020 |date=2018-10-04 |work=ABC News |accessdate=2018-10-05 }}</ref> By March 2019, Transport for NSW was reportedly working to have the line open in stages.<ref>{{cite news |last1=O'Sullivan |first1=Matt |title=Sydney's troubled light rail line set for staged opening to passengers |url=https://www.smh.com.au/national/nsw/sydney-s-troubled-light-rail-line-set-for-staged-opening-to-passengers-20190306-p5122t.html |work=The Sydney Morning Herald |date=7 March 2019}}</ref> | In October 2018, Acciona stated the project would not be completed until May 2020.<ref>{{Cite news |url=http://www.abc.net.au/news/2018-10-04/sydney-light-rail-delayed-again-and-will-not-open-until-may-2020/10337658 |title=Sydney Light Rail delayed again, completion now May 2020 |date=2018-10-04 |work=ABC News |accessdate=2018-10-05 }}</ref> By March 2019, Transport for NSW was reportedly working to have the line open in stages.<ref>{{cite news |last1=O'Sullivan |first1=Matt |title=Sydney's troubled light rail line set for staged opening to passengers |url=https://www.smh.com.au/national/nsw/sydney-s-troubled-light-rail-line-set-for-staged-opening-to-passengers-20190306-p5122t.html |work=The Sydney Morning Herald |date=7 March 2019}}</ref> | ||
The legal dispute was resolved in June 2019, with the New South Wales Government agreeing to pay up to $576 million extra to complete the project. Up to $129 million will only be paid once milestones are met, including the start of passenger services between Circular Quay and Randwick from December 2019, and between Circular Quay and Kingsford by March 2020.<ref>{{Cite news |url=https://www.theguardian.com/australia-news/2019/jun/03/nsw-government-to-pay-576m-extra-to-sydney-light-rail-subcontractors |title=NSW government to pay $576m extra to Sydney light rail subcontractors |date=2019-06-03 |work=The Guardian Australia |accessdate=2019-06-05 }}</ref> | The legal dispute was resolved in June 2019, with the New South Wales Government agreeing to pay up to $576 million extra to complete the project. Up to $129 million will only be paid once milestones are met, including the start of passenger services between Circular Quay and Randwick from December 2019, and between Circular Quay and Kingsford by March 2020.<ref>{{Cite news |url=https://www.theguardian.com/australia-news/2019/jun/03/nsw-government-to-pay-576m-extra-to-sydney-light-rail-subcontractors |title=NSW government to pay $576m extra to Sydney light rail subcontractors |date=2019-06-03 |work=The Guardian Australia |accessdate=2019-06-05 }}</ref> A media report in July indicated services were expected to commence between Circular Quay and Randwick in the first week of December and also suggested the Kingsford branch could open earlier than March 2020.<ref name="smh 2019-07-30" /> | ||
===Associated works=== | ===Associated works=== | ||
Separate to the light rail budget, Randwick City Council earmarked $68 million to partially mitigate the impacts of the light rail. Projects include replacing some of the car parking spaces that will be lost, especially in Kingsford, works to improve traffic flow in the district and public domain works.<ref>{{cite web |title=Council Endorses $68 Million Light Rail Support Plan |url=https://www.randwick.nsw.gov.au/about-council/news/news-items/2014/april/council-endorses-$68-million-light-rail-support-plan |publisher=Randwick City Council |date=30 April 2014 |archiveurl= |archivedate=}}</ref> | Separate to the light rail budget, Randwick City Council earmarked $68 million to partially mitigate the impacts of the light rail. Projects include replacing some of the car parking spaces that will be lost, especially in Kingsford, works to improve traffic flow in the district and public domain works.<ref>{{cite web |title=Council Endorses $68 Million Light Rail Support Plan |url=https://www.randwick.nsw.gov.au/about-council/news/news-items/2014/april/council-endorses-$68-million-light-rail-support-plan |publisher=Randwick City Council |date=30 April 2014 |archiveurl= |archivedate=}}</ref> | ||
The City of Sydney | The City of Sydney provided $220 million towards the light rail project. This included money for public domain works on George Street and surrounding laneways.<ref>{{cite web |title=Light rail gets the green light |url=http://www.cityofsydney.nsw.gov.au/vision/city-transformation/light-rai |publisher=City of Sydney |accessdate=21 February 2015}}</ref> The centrepiece of these works is a large arch structure located outside the Sydney Town Hall. [[wikipedia:Cloud Arch|Cloud Arch]] will act as a gateway to the pedestrian section of George Street, with trams passing underneath it.<ref>{{cite web |title=Cloud Arch |url=http://www.cityartsydney.com.au/artwork/cloud-arch/ |publisher=City of Sydney |accessdate=21 February 2015 }}</ref> | ||
===Opening=== | |||
The L2 Randwick Line opened on 14 December 2019.<ref>{{cite web |last1=Raper |first1=Ashleigh |title=Sydney light rail opens and takes passengers down George Street again after 58 years |url=https://www.abc.net.au/news/2019-12-14/sydney-light-rail-opens-after-delays-and-cost-blowouts/11766132 |website=ABC News |publisher=Australian Broadcasting Corporation |accessdate=14 December 2019}}</ref> The L3 Kingsford Line is expected to open in March 2020. | |||
== Criticism == | == Criticism == | ||
There have been criticism of the project from some parties: | There have been criticism of the project from some parties: | ||
* Action for Public Transport, that it will not have sufficient capacity to replace the bus routes eliminated<ref>{{cite web |title=Sydney tram plan will produce peak-hour chaos |url = http://www.smh.com.au/comment/sydney-tram-plan-will-produce-peakhour-chaos-20140706-zsxvr.html | | * Action for Public Transport, that it will not have sufficient capacity to replace the bus routes eliminated.<ref>{{cite web |title=Sydney tram plan will produce peak-hour chaos |url=http://www.smh.com.au/comment/sydney-tram-plan-will-produce-peakhour-chaos-20140706-zsxvr.html |work=The Sydney Morning Herald |date=7 July 2014 |first=Jim |last=Donovan |accessdate=26 January 2015}}</ref> | ||
* Save Our Suburbs, that it will disrupt vehicular traffic<ref>{{cite web |title=Choked transport arteries need underground solution |url = http://www.smh.com.au/comment/choked-transport-arteries-need-underground-solution-20141221-128rqn.html | | * Save Our Suburbs, that it will disrupt vehicular traffic<ref>{{cite web |title=Choked transport arteries need underground solution |url=http://www.smh.com.au/comment/choked-transport-arteries-need-underground-solution-20141221-128rqn.html |work=The Sydney Morning Herald |date=22 December 2014|author=Tony Recsei |accessdate=26 January 2015 }}</ref> | ||
* Save Randwick's Trees objecting to the loss of nearly 1,000 trees including from Centennial, Moore and High Cross parks<ref> | * Save Randwick's Trees objecting to the loss of nearly 1,000 trees including from Centennial, Moore and High Cross parks.<ref>{{cite news |title=Randwick community presents petition to save high cross park trees from CBD and south east light rail |url=http://www.dailytelegraph.com.au/newslocal/city-east/randwick-community-presents-petition-to-save-high-cross-park-trees-from-cbd-and-south-east-light-rail/story-fngr8h22-1227129472717 |work=The Daily Telegraph |date= |archiveurl= |archivedate=}}</ref> | ||
* Save our Park campaigning against the loss of Centennial, Moore and adjacent park lands<ref> | * Save our Park campaigning against the loss of Centennial, Moore and adjacent park lands.<ref>{{cite web |title=Battles rage on in Randwick as residents fight to save Centennial Park and High Cross Park |url=http://www.dailytelegraph.com.au/newslocal/city-east/battles-rage-on-in-randwick-as-residents-fight-to-save-centennial-park-and-high-cross-park/story-fngr8h22-1227221645725 |work=The Daily Telegraph |date= |archiveurl= |archivedate=}}</ref> | ||
== Bus network changes == | == Bus network changes == | ||
<!--[[File:George Street congestion during evening peak hour 2013.jpg|thumb|Southbound peak hour traffic congestion on George Street in 2013]]--> | <!--[[File:George Street congestion during evening peak hour 2013.jpg|thumb|Southbound peak hour traffic congestion on George Street in 2013]]--> | ||
The CBD and South East Light Rail requires significant changes to the bus networks of the Sydney Central Business District and the Eastern Suburbs. Prior to construction of the light rail, bus routes using George Street were permanently removed from the street. The network will be further redesigned | The CBD and South East Light Rail requires significant changes to the bus networks of the Sydney Central Business District and the Eastern Suburbs. Prior to construction of the light rail, bus routes using George Street were permanently removed from the street. The network will be further redesigned after the Kingsford branch of the light rail opens in 2020. Some bus routes from the Eastern Suburbs will be removed from the CBD, with many of the routes integrated with the light rail interchanges at Randwick and Kingsford. Some passengers will be required to change from bus to light rail to complete their journey. | ||
=== During construction === | === During construction === | ||
To accommodate construction of the light rail on George Street, new bus timetables were introduced on 4 October 2015. Buses were diverted from George Street on to other streets in the CBD.<ref name="TfNSW28May15" /> Some routes had their terminus changed to such places as Railway Square, Queen Victoria Building and King Street Wharf. A small number of routes were either combined so that they run through the CBD without terminating, removed from the CBD entirely or completely discontinued.<ref> | To accommodate construction of the light rail on George Street, new bus timetables were introduced on 4 October 2015. Buses were diverted from George Street on to other streets in the CBD.<ref name="TfNSW28May15" /> Some routes had their terminus changed to such places as Railway Square, Queen Victoria Building and King Street Wharf. A small number of routes were either combined so that they run through the CBD without terminating, removed from the CBD entirely or completely discontinued.<ref>{{cite web |title=Preparing for tomorrow's Sydney: New CBD bus network to ease congestion |url=http://www.transport.nsw.gov.au/media-releases/preparing-tomorrows-sydney-new-cbd-bus-network-ease-congestion |publisher=Transport for NSW |date=17 October 2015 |archiveurl= |archivedate=}}</ref><ref>{{cite web |title=New cross-city bus routes to ease congestion in the CBD |url=http://www.transport.nsw.gov.au/media-releases/new-cross-city-bus-routes-ease-congestion-cbd |publisher=Transport for NSW |date=17 October 2015 |archiveurl= |archivedate=}}</ref><ref>{{cite web |title=Bus changes outside the Sydney CBD |url=http://www.transport.nsw.gov.au/media-releases/bus-changes-outside-sydney-cbd |publisher=Transport for NSW |date=17 October 2015 |archiveurl= |archivedate=}}</ref><ref>{{cite web |title=New bus services set to roll into Barangaroo and Walsh Bay |url=http://www.transport.nsw.gov.au/media-releases/new-bus-services-set-roll-barangaroo-and-walsh-bay |publisher=Transport for NSW |date=17 October 2015 |archiveurl=https://web.archive.org/web/20150720220711/http://www.transport.nsw.gov.au/media-releases/new-bus-services-set-roll-barangaroo-and-walsh-bay# |archivedate=20 July 2015}}</ref><ref>{{cite web |title=A new CBD bus network |url=http://www.transportnsw.info/resources/documents/brochures/cbd-bus-network-brochure.pdf |publisher=Transport for NSW |date= |archiveurl= |archivedate=}}</ref> | ||
=== After completion === | === After completion === | ||
Some bus routes which were diverted from George Street to other streets during the construction, will terminate at Railway Square with their passengers to join the Light Rail while others will be rerouted permanently to the streets to which they were diverted.<ref name="EISVol2128132"> | Some bus routes which were diverted from George Street to other streets during the construction, will terminate at Railway Square with their passengers to join the Light Rail while others will be rerouted permanently to the streets to which they were diverted.<ref name="EISVol2128132">{{cite web |title=CSELR-Environmental-Impact-Statement Volume 2: Technical Papers 1 & 2 |url=http://www.sydneylightrail.transport.nsw.gov.au/Bullseye/handlers/DownloadMediaFile.ashx?file=~%2FBullseye%2Fmedia%2FSydney-Light-Rail%2FEIS%2FCSELR_EIS_Volume_2.pdf%3Fext%3D.pdf |publisher=Transport for NSW |date=14 November 2013 |format=PDF |archiveurl=https://web.archive.org/web/20160304043202/http://www.sydneylightrail.transport.nsw.gov.au/Bullseye/handlers/DownloadMediaFile.ashx?file=~%2FBullseye%2Fmedia%2FSydney-Light-Rail%2FEIS%2FCSELR_EIS_Volume_2.pdf%3Fext%3D.pdf |archivedate=4 March 2016}}</ref> | ||
The project's Environmental Impact Statement (released in 2013) proposed twenty bus routes that would be withdrawn or curtailed between Kingsford/Randwick and Railway Square/Circular Quay. A number of bus routes using Anzac Parade will unload city bound passengers at the Nine Ways interchange to board the light rail, then continue along Anzac Parade to the University of New South Wales to unload passengers before terminating in Todman Avenue, Kensington. Some bus routes currently operating to the city via Randwick will become feeder services that drop off city bound passengers at the light rail terminus.<ref name="EISVol2128132" /> | The project's Environmental Impact Statement (released in 2013) proposed twenty bus routes that would be withdrawn or curtailed between Kingsford/Randwick and Railway Square/Circular Quay. A number of bus routes using Anzac Parade will unload city bound passengers at the Nine Ways interchange to board the light rail, then continue along Anzac Parade to the University of New South Wales to unload passengers before terminating in Todman Avenue, Kensington. Some bus routes currently operating to the city via Randwick will become feeder services that drop off city bound passengers at the light rail terminus.<ref name="EISVol2128132" /> | ||
Line 153: | Line 155: | ||
}}--> | }}--> | ||
As a member of the ALTRAC Light Rail consortium, Transdev will operate the line until 2034.<ref>{{cite press release |url = http://www.transdevsydney.com.au/index.php?mact=NewsManager,cntnt01,frontend_article_details,0&cntnt01article_id=43&cntnt01returnid=101 |title = Transdev consortium achieves financial close on Sydney Light Rail PPP |publisher=Transdev |date=25 February 2015 |accessdate=5 April 2015 |deadurl=yes |archiveurl=https://web.archive.org/web/20150411051000/http://www.transdevsydney.com.au/index.php?mact=NewsManager%2Ccntnt01%2Cfrontend_article_details%2C0&cntnt01article_id=43&cntnt01returnid=101 |archivedate=11 April 2015 | As a member of the ALTRAC Light Rail consortium, Transdev will operate the line until 2034.<ref>{{cite press release |url=http://www.transdevsydney.com.au/index.php?mact=NewsManager,cntnt01,frontend_article_details,0&cntnt01article_id=43&cntnt01returnid=101 |title=Transdev consortium achieves financial close on Sydney Light Rail PPP |publisher=Transdev |date=25 February 2015 |accessdate=5 April 2015 |deadurl=yes |archiveurl=https://web.archive.org/web/20150411051000/http://www.transdevsydney.com.au/index.php?mact=NewsManager%2Ccntnt01%2Cfrontend_article_details%2C0&cntnt01article_id=43&cntnt01returnid=101 |archivedate=11 April 2015}}</ref> Services on the Randwick branch are numbered L2 and services on the Kingsford branch are numbered L3.<ref>{{cite web |title=Light Rail Network Line Diagram |url=https://www.transport.nsw.gov.au/sites/default/files/b2b/releases/cselr-network-line-diagram-and-recommended-stop-names.jpg |publisher=Transport for NSW |accessdate=14 March 2017 }}</ref> | ||
=== Fleet === | === Fleet === | ||
{{main|Light rail in Sydney#Rolling stock}} | {{main|Light rail in Sydney#Rolling stock}} | ||
Services are operated by 60 five-section [[wikipedia:Alstom Citadis|Alstom Citadis]] X05 trams operating in coupled pairs.<ref>{{cite web |title=Sydney is first Citadis X05 customer |url=http://www.railwaygazette.com/news/single-view/view/sydney-is-first-citadis-x05-tram-customer.html |work=Railway Gazette International |date=25 February 2015 |archiveurl= |archivedate=}}</ref><ref>{{cite web |title=New Citadis X05 heads to Sydney |url=http://www.tautonline.com/new-citadis-x05-heads-sydney/ |work=Tramways & Urban Transit |date=2 March 2015 |archiveurl= |archivedate=}}</ref> The first was completed in May 2017, arriving at the Randwick depot on 28 July 2017.<ref>{{cite web |title=Alstom completes first Citadis X05 LRVs for Sydney |url=http://www.railjournal.com/index.php/australia-nz/alstom-completes-first-citadis-x05-lrvs-for-sydney.html?channel=526 |work=International Railway Journal |date=24 May 2017 |archiveurl= |archivedate=}}</ref><ref>{{cite web |title=First Citadis X05 tram rolled out |url=http://www.metro-report.com/news/single-view/view/first-citadis-x05-tram-rolled-out.html |work=Metro Report International |date=24 May 2017 |archiveurl= |archivedate=}}</ref><ref>"Worldwide Review" ''Tramways & Urban Transit'' issue 957 September 2017 page 350</ref> | |||
==Route== | ==Route== | ||
The line | The line commences outside [[Circular Quay station (Sydney)|Circular Quay station]] heading west on Alfred Street, before proceeding south down George Street, then east via Rawson Place and Eddy Avenue, and south via Chalmers Street to [[Central station (Sydney)|Central station]]. It then continues east via Devonshire Street over the Eastern Distributor and under Moore Park and Anzac Parade via a tunnel before heading south adjacent to the Moore Park busway. At the intersection of Anzac Parade and Alison Road the line splits into two branches, one continuing down Anzac Parade to terminate outside the South Sydney Junior Rugby League Club at [[wikipedia:Kingsford, New South Wales|Kingsford]], and the second to [[wikipedia:Randwick, New South Wales|Randwick]] via Alison Road, Wansey Road and High Street.<ref name="TransportNSW13Dec12" /> | ||
<!--<mapframe width="350" height="520" longitude="151.2253" latitude="-33.8917" zoom="13" align="center" frameless> | <!--<mapframe width="350" height="520" longitude="151.2253" latitude="-33.8917" zoom="13" align="center" frameless> | ||
[ | [ | ||
Line 176: | Line 177: | ||
] | ] | ||
</mapframe>--> | </mapframe>--> | ||
=== Circular Quay === | === Circular Quay === | ||
{| class="wikitable" style="text-align: center; width: 250px; float:right;"<!-- | {| class="wikitable" style="text-align:center; width:250px; float:right;"<!-- | ||
|- | |- | ||
| rowspan="6"|[[File:Circular Quay light rail stop 20181209 01.jpg|220px]] | | rowspan="6"|[[File:Circular Quay light rail stop 20181209 01.jpg|220px]]--> | ||
! Opened | ! Opened | ||
|- | |- | ||
| | | 2019 | ||
|- | |- | ||
! Transfer | ! Transfer | ||
Line 197: | Line 195: | ||
|} | |} | ||
The '''Circular Quay''' stop | The '''Circular Quay''' stop serves the locality of Circular Quay at the northern end of the Central Business District. The stop is on Alfred St between Pitt and Loftus Streets. The area has an established role as a transport interchange and is also served by buses, trains and ferries. The stop comprises one island platform and one side platform.<ref>{{cite book |title=CBD and South East Light Rail – Environmental Impact Statement |chapterurl=https://majorprojects.affinitylive.com/public/af988042f1463435bbe7c7ce83554acb/04%20CSELR%20EIS%20-%20Chapter%205%20-%20Part%20A.pdf |chapter = Chapter 5 - Part A |publisher=Transport for NSW |author=Parsons Brinkerhoff |chapter-format=PDF |pages=5-18 to 5-19}}</ref><!--<br /> | ||
{{maplink |from = Circular Quay interchange.map |text = The transport facilities in the Circular Quay precinct |zoom = 18 }}--> | {{maplink |from=Circular Quay interchange.map |text=The transport facilities in the Circular Quay precinct |zoom=18 }}--> | ||
{{clear}} | {{clear}} | ||
=== Bridge Street === | === Bridge Street === | ||
{| class="wikitable" style="text-align: center; width: 250px; float:right;"<!-- | {| class="wikitable" style="text-align:center; width:250px; float:right;"<!-- | ||
|- | |- | ||
| rowspan="6"|[[File:Bridge Street light rail stop 20181209.jpg|220px]] | | rowspan="6"|[[File:Bridge Street light rail stop 20181209.jpg|220px]]--> | ||
! Opened | ! Opened | ||
|- | |- | ||
| | | 2019 | ||
|- | |- | ||
! Transfer | ! Transfer | ||
Line 218: | Line 216: | ||
|} | |} | ||
The Bridge Street stop | The Bridge Street stop is located on George Street, near the intersections with Bridge Street and Grosvenor Street. The stop was known as '''Grosvenor Street''' during development. The design includes an island platform. The design originally included two side platforms but was switched to an island platform to retain the existing dedicated left-hand turning lane from George Street into Grosvenor Street.<ref>{{cite web |title=CBD and South East Light Rail – Modification Report |url=https://majorprojects.affinitylive.com/public/bd9fa8e85aeb4396512d5e710e3d8da5/20141202_01_CBD_and_South_East_light_rail_modifications_report.pdf |publisher=Transport for NSW |accessdate=3 December 2014 |pages=10–11}}</ref> | ||
{{clear}} | {{clear}} | ||
=== Wynyard === | === Wynyard === | ||
{| class="wikitable" style="text-align: center; width: 250px; float:right;"<!-- | {| class="wikitable" style="text-align:center; width:250px; float:right;"<!-- | ||
|- | |- | ||
| rowspan="6"|[[File:Wynyard light rail stop 20181209.jpg|220px]] | | rowspan="6"|[[File:Wynyard light rail stop 20181209.jpg|220px]]--> | ||
! Opened | ! Opened | ||
|- | |- | ||
| | | 2019 | ||
|- | |- | ||
! Transfer | ! Transfer | ||
Line 238: | Line 236: | ||
|} | |} | ||
The '''Wynyard''' stop serves the locality of Wynyard. The stop | The '''Wynyard''' stop serves the locality of Wynyard. The stop is located at the northern end of the George Street pedestrian zone, adjacent to the entrance to [[Wynyard station (Sydney)|Wynyard railway station]]. The design includes two side platforms.<ref>{{cite book |title=CBD and South East Light Rail – Environmental Impact Statement |chapterurl=https://majorprojects.affinitylive.com/public/af988042f1463435bbe7c7ce83554acb/04%20CSELR%20EIS%20-%20Chapter%205%20-%20Part%20A.pdf |chapter=Chapter 5 - Part A |publisher=Transport for NSW |author=Parsons Brinkerhoff |chapter-format=PDF |pages=5-22 to 5-23}}</ref> | ||
{{clear}} | {{clear}} | ||
=== QVB === | === QVB === | ||
{| class="wikitable" style="text-align: center; width: 250px; float:right;"<!-- | {| class="wikitable" style="text-align:center; width:250px; float:right;"<!-- | ||
|- | |- | ||
| rowspan="6"|[[File:QVB light rail stop 20181209.jpg|220px]] | | rowspan="6"|[[File:QVB light rail stop 20181209.jpg|220px]]--> | ||
! Opened | ! Opened | ||
|- | |- | ||
| | | 2019 | ||
|- | |- | ||
! Transfer | ! Transfer | ||
Line 258: | Line 256: | ||
|} | |} | ||
'''QVB''' is located on George Street south of Market Street and adjacent to the Queen Victoria Building, a shopping centre from which the stop takes its name. The design includes two side platforms.<ref>{{cite book |title=CBD and South East Light Rail – Environmental Impact Statement |chapterurl = https://majorprojects.affinitylive.com/public/af988042f1463435bbe7c7ce83554acb/04%20CSELR%20EIS%20-%20Chapter%205%20-%20Part%20A.pdf |chapter=Chapter 5 - Part A |publisher=Transport for NSW |author=Parsons Brinkerhoff |chapter-format=PDF |pages=5-24 to 5-25}}</ref> | |||
{{clear}} | {{clear}} | ||
=== Town Hall === | === Town Hall === | ||
{| class="wikitable" style="text-align: center; width: 250px; float:right;"<!-- | {| class="wikitable" style="text-align:center; width:250px; float:right;"<!-- | ||
|- | |- | ||
| rowspan="6"|[[File:Town Hall light rail stop 20181209.jpg|220px]] | | rowspan="6"|[[File:Town Hall light rail stop 20181209.jpg|220px]]--> | ||
|- | |- | ||
! Opened | ! Opened | ||
|- | |- | ||
| | | 2019 | ||
|- | |- | ||
! Transfer | ! Transfer | ||
Line 279: | Line 277: | ||
|} | |} | ||
'''Town Hall''' is located at the southern end of the George Street pedestrian zone, adjacent to St Andrew's Cathedral. It is named after [[Town Hall station (Sydney)|Town Hall railway station]] and the Sydney Town Hall.<ref name="NRP">{{cite web |title=Name recommendations pack City and South East Light Rail (CSELR) |url=http://data.sydneylightrail.transport.nsw.gov.au/s3fs-public/Name%20Recommendations%20Pack%20-%20CBD%20and%20South%20East%20Light%20Rail.pdf |publisher=Transport for NSW |date=8 August 2017}}</ref> The stop consists of two side platforms.<ref>{{cite book |title=CBD and South East Light Rail – Environmental Impact Statement |chapterurl=https://majorprojects.affinitylive.com/public/af988042f1463435bbe7c7ce83554acb/04%20CSELR%20EIS%20-%20Chapter%205%20-%20Part%20A.pdf |chapter=Chapter 5 - Part A |publisher=Transport for NSW |author=Parsons Brinkerhoff |chapter-format=PDF |pages=5-26 to 5-27 }}</ref> | |||
{{clear}} | {{clear}} | ||
=== Chinatown === | === Chinatown === | ||
{| class="wikitable" style="text-align: center; width: 250px; float:right;"<!-- | {| class="wikitable" style="text-align:center; width:250px; float:right;"<!-- | ||
|- | |- | ||
| rowspan="6"|[[File:Chinatown light rail stop 20181209.jpg|220px]] | | rowspan="6"|[[File:Chinatown light rail stop 20181209.jpg|220px]]--> | ||
! Opened | ! Opened | ||
|- | |- | ||
| | | 2019 | ||
|- | |- | ||
! Transfer | ! Transfer | ||
|- | |- | ||
| [[Capitol Square | | [[Capitol Square light rail stop]] | ||
<!--|- | <!--|- | ||
! Location | ! Location | ||
Line 299: | Line 297: | ||
|} | |} | ||
The '''Chinatown''' stop | The '''Chinatown''' stop is located on George Street, north of Campbell Street. It is named after Sydney's Chinatown precinct. The [[Capitol Square light rail stop|Capitol Square stop]] on the Inner West Light Rail is nearby. The design was to include two side platforms, but was changed to an island platform in the project's Submissions Report. The location was also moved 15 metres north.<ref name="sub rep">{{cite web |title=CBD and South East Light Rail – Submissions Report, incorporating Preferred Infrastructure Report - Vol.1 Part A |url=https://majorprojects.affinitylive.com/public/a09c6493c9ae47720ca17be3fcaf1556/Submissions%20Report%20incorporating%20Preferred%20Infrastructure%20Report_Volume%201_Part%20A.pdf |publisher=Transport for NSW |accessdate=12 March 2014 |pages=xxi - xxiii |date=March 2014}}</ref> | ||
{{clear}} | {{clear}} | ||
=== Haymarket === | === Haymarket === | ||
{| class="wikitable" style="text-align: center; width: 250px; float:right;"<!-- | {| class="wikitable" style="text-align:center; width:250px; float:right;"<!-- | ||
|- | |- | ||
| rowspan="6"|[[File:Haymarket light rail stop 20181209 01.jpg|220px]] | | rowspan="6"|[[File:Haymarket light rail stop 20181209 01.jpg|220px]]--> | ||
! Opened | ! Opened | ||
|- | |- | ||
| | | 2019 | ||
|- | |- | ||
! Transfer | ! Transfer | ||
Line 319: | Line 317: | ||
|} | |} | ||
The '''Haymarket''' stop, known as '''Rawson Place''' during development, will serve as an interchange for buses entering the city via Broadway. The design includes two side platforms for trams and an adjacent platform for buses, which would allow some bus - tram cross-platform transfers.<ref>{{cite book |title = CBD and South East Light Rail – Environmental Impact Statement |chapterurl=https://majorprojects.affinitylive.com/public/5aeaea32c2a00a225f28390783360009/05%20CSELR%20EIS%20-%20Chapter%205%20-%20Part%20B.pdf |chapter = Chapter 5 - Part B | | The '''Haymarket''' stop, known as '''Rawson Place''' during development, will serve as an interchange for buses entering the city via Broadway. The design includes two side platforms for trams and an adjacent platform for buses, which would allow some bus - tram cross-platform transfers.<ref>{{cite book |title=CBD and South East Light Rail – Environmental Impact Statement |chapterurl=https://majorprojects.affinitylive.com/public/5aeaea32c2a00a225f28390783360009/05%20CSELR%20EIS%20-%20Chapter%205%20-%20Part%20B.pdf |chapter=Chapter 5 - Part B |publisher=Transport for NSW |author=Parsons Brinkerhoff |chapter-format=PDF |pages=5-32 to 5-33}}</ref> | ||
{{clear}} | {{clear}} | ||
=== Central === | === Central Chalmers Street === | ||
{| class="wikitable" style="text-align: center; width: 250px; float:right;"<!-- | {| class="wikitable" style="text-align:center; width:250px; float:right;"<!-- | ||
|- | |- | ||
| rowspan="6"|[[File:Central Chalmers Street light rail stop 20181209.jpg|220px]] | | rowspan="6"|[[File:Central Chalmers Street light rail stop 20181209.jpg|220px]]--> | ||
! Opened | ! Opened | ||
|- | |- | ||
| | | 2019 | ||
|- | |- | ||
! Transfer | ! Transfer | ||
Line 339: | Line 337: | ||
|} | |} | ||
The '''Central''' | The '''Central Chalmers Street''' serves the eastern side of the [[Central station (Sydney)|Central railway station]] precinct. The stop is known as Central Chalmers Street to distinguish it from the nearby Central Grand Concourse stop on the [[Inner West Light Rail]].<ref name="NRP" /> The stop consists of one side platform and one island platform.<ref name="back to three platforms">{{cite web |title=Urban Design and Landscape Plan Surry Hills |url=http://data.sydneylightrail.transport.nsw.gov.au/s3fs-public/UDLP%20Surry%20Hills.pdf?KYo4Q20V0nGgELKs3zqsijP9AMZrlCmV |publisher=Transport for NSW |accessdate=8 May 2017 |pages=29–31 }}</ref> | ||
The stop was originally proposed to consist of three double length (90 metre) platforms, with one of the platforms to be used only during special events - the roadway being open to general traffic at other times.<ref>{{cite book |title = CBD and South East Light Rail – Environmental Impact Statement |chapterurl = https://majorprojects.affinitylive.com/public/5aeaea32c2a00a225f28390783360009/05%20CSELR%20EIS%20-%20Chapter%205%20-%20Part%20B.pdf |chapter = Chapter 5 - Part B | | The stop was originally proposed to consist of three double length (90 metre) platforms, with one of the platforms to be used only during special events - the roadway being open to general traffic at other times.<ref>{{cite book |title=CBD and South East Light Rail – Environmental Impact Statement |chapterurl = https://majorprojects.affinitylive.com/public/5aeaea32c2a00a225f28390783360009/05%20CSELR%20EIS%20-%20Chapter%205%20-%20Part%20B.pdf |chapter=Chapter 5 - Part B |publisher=Transport for NSW |author=Parsons Brinkerhoff |chapter-format=PDF |pages=5-34 to 5-35 }}</ref> This third platform was removed in the project's Submissions Report, with a crossover to the north of the stop provided instead. The Report also proposed diverting most general traffic via Randle Street and converting the section of Chalmers Street opposite the station into a pedestrian/traffic shared zone.<ref name="sub repb">{{cite web |title=CBD and South East Light Rail – Submissions Report, incorporating Preferred Infrastructure Report - Vol.1 Part B |url = https://majorprojects.affinitylive.com/public/ea044311ff7b7fc8f5b441d56ac5a6c9/Submissions%20Report%20incorporating%20Preferred%20Infrastructure%20Report_Volume%201_Part%20B.pdf |publisher=Transport for NSW |accessdate=12 March 2014 |pages=6-16 to 6-18 |date=March 2014 }}</ref> As a result of the December 2014 decision to increase the length of the trams, plans to run double length trams during special events at Moore Park were abandoned. Consequently, the Modifications Report reduced the platform length from 90 metres to 75 metres.<ref name="dec design adjustment" /><ref>{{cite web |title=CBD and South East Light Rail – Modifications Report |url=https://majorprojects.affinitylive.com/public/bd9fa8e85aeb4396512d5e710e3d8da5/20141202_01_CBD_and_South_East_light_rail_modifications_report.pdf |publisher=Transport for NSW |accessdate=3 December 2014 |page=25 }}</ref> The third platform was reinstated in an urban design plan released in 2017. This report also proposed closing Chalmers Street to through traffic.<ref name="back to three platforms" /><!--<br /> | ||
{{maplink |from = Central station, Sydney.map |text = Map of Central station |zoom = 17 }}--> | {{maplink |from = Central station, Sydney.map |text = Map of Central station |zoom = 17 }}--> | ||
{{clear}} | {{clear}} | ||
=== Surry Hills === | === Surry Hills === | ||
{| class=wikitable style="text-align: center; width: 250px; float:right"<!-- | {| class=wikitable style="text-align:center; width:250px; float:right"<!-- | ||
|- | |- | ||
| rowspan="6"|[[File:Surry Hills light rail stop 20181209.jpg|220px] | | rowspan="6"|[[File:Surry Hills light rail stop 20181209.jpg|220px]--> | ||
! Opened | ! Opened | ||
|- | |- | ||
| | | 2019 | ||
|- | |- | ||
! Transfer | ! Transfer | ||
Line 362: | Line 360: | ||
|} | |} | ||
The '''Surry Hills''' stop | The '''Surry Hills''' stop is located on Devonshire Street, adjacent to Ward Park in [[wikipedia:Surry Hills, New South Wales|Surry Hills]]. The design originally featured an island platform but was changed to side platforms in the project's Submissions Report.<ref name="sub rep"/> Groundwork for a second Surry Hills stop at Wimbo Park for a potential future station if required will be completed in the initial construction phase. | ||
{{clear}} | {{clear}} | ||
=== Moore Park === | === Moore Park === | ||
{| class="wikitable" style="text-align: center; width: 250px; float:right;"<!-- | {| class="wikitable" style="text-align:center; width:250px; float:right;"<!-- | ||
|- | |- | ||
| rowspan="6"|[[File:Moore Park light rail stop 20181216 01.jpg|220px]] | | rowspan="6"|[[File:Moore Park light rail stop 20181216 01.jpg|220px]]--> | ||
! Opened | ! Opened | ||
|- | |- | ||
| | | 2019 | ||
|- | |- | ||
! Transfer | ! Transfer | ||
Line 382: | Line 380: | ||
|} | |} | ||
The '''Moore Park''' stop serves the [[wikipedia:Moore Park, New South Wales|Moore Park]] precinct. In regular service the stop serves Sydney Boys High School, Sydney Girls High School and The Entertainment Quarter. The stop is also designed to handle major events at the Sydney Football Stadium and Sydney Cricket Ground, with grade separated access to the platform. At-grade access to the stop | The '''Moore Park''' stop serves the [[wikipedia:Moore Park, New South Wales|Moore Park]] precinct. In regular service the stop serves Sydney Boys High School, Sydney Girls High School and The Entertainment Quarter. The stop is also designed to handle major events at the Sydney Football Stadium and Sydney Cricket Ground, with grade separated access to the platform. At-grade access to the stop is provided for regular use and for disabled passengers during major events.<ref name="NSW 2014">"CBD and South East Light Rail – Modification Report". Transport for NSW. 3 December 2014.</ref> The design features a 75-metre island platform. | ||
The stop's design experienced a number of modifications. Initially, an overhead concourse was proposed for access to the stop during special events with at-grade access at other times. School students would have used the existing footpath and pedestrian crossing of Anzac Parade.<ref>{{cite book |title=CBD and South East Light Rail – Environmental Impact Statement |chapterurl = https://majorprojects.affinitylive.com/public/5aeaea32c2a00a225f28390783360009/05%20CSELR%20EIS%20-%20Chapter%205%20-%20Part%20B.pdf |chapter = Chapter 5 - Part B | | The stop's design experienced a number of modifications. Initially, an overhead concourse was proposed for access to the stop during special events with at-grade access at other times. School students would have used the existing footpath and pedestrian crossing of Anzac Parade.<ref>{{cite book |title=CBD and South East Light Rail – Environmental Impact Statement |chapterurl = https://majorprojects.affinitylive.com/public/5aeaea32c2a00a225f28390783360009/05%20CSELR%20EIS%20-%20Chapter%205%20-%20Part%20B.pdf |chapter=Chapter 5 - Part B |publisher=Transport for NSW |author=Parsons Brinkerhoff |chapter-format=PDF |pages=5-38 to 5-39 }}</ref> | ||
In the project's Submissions Report, the stop was moved 250 metres south and a pedestrian bridge over Anzac Parade and the light rail tracks was included in the design, replacing the existing at-grade crossing of the road and an associated set of traffic lights. The bridge was to be connected to the concourse.<ref>[https://majorprojects.affinitylive.com/public/ea044311ff7b7fc8f5b441d56ac5a6c9/Submissions%20Report%20incorporating%20Preferred%20Infrastructure%20Report_Volume%201_Part%20A.pdf CBD and South East Light Rail – Submissions Report, incorporating Preferred Infrastructure Report - Vol.1 Part A]. Transport for NSW. March 2014. pp. 6-28 - 6-31, 6-38 - 6-44</ref> In December 2014, the overhead concourse was removed, with underground access for major events provided at both ends of the platform. At-grade access will be used by disabled passengers during major events and by all passengers at other times. The bridge | In the project's Submissions Report, the stop was moved 250 metres south and a pedestrian bridge over Anzac Parade and the light rail tracks was included in the design, replacing the existing at-grade crossing of the road and an associated set of traffic lights. The bridge was to be connected to the concourse.<ref>[https://majorprojects.affinitylive.com/public/ea044311ff7b7fc8f5b441d56ac5a6c9/Submissions%20Report%20incorporating%20Preferred%20Infrastructure%20Report_Volume%201_Part%20A.pdf CBD and South East Light Rail – Submissions Report, incorporating Preferred Infrastructure Report - Vol.1 Part A]. Transport for NSW. March 2014. pp. 6-28 - 6-31, 6-38 - 6-44</ref> In December 2014, the overhead concourse was removed, with underground access for major events provided at both ends of the platform. At-grade access will be used by disabled passengers during major events and by all passengers at other times. The bridge was now designed as a separate structure. As a result of the decision to increase the length of the trams, plans to run double length trams during major events were abandoned. Consequently, the platform length was reduced from 90 metres to 75 metres.<ref name="dec design adjustment"/><ref>{{cite web |title=CBD and South East Light Rail – Modification Report |url=https://majorprojects.affinitylive.com/public/bd9fa8e85aeb4396512d5e710e3d8da5/20141202_01_CBD_and_South_East_light_rail_modifications_report.pdf |publisher=Transport for NSW |accessdate=3 December 2014 |pages=17–21, 25 }}</ref> | ||
{{clear}} | {{clear}} | ||
=== Royal Randwick === | === Royal Randwick === | ||
{| class="wikitable" style="text-align: center; width: 250px; float:right;"<!-- | {| class="wikitable" style="text-align:center; width:250px; float:right;"<!-- | ||
|- | |- | ||
| rowspan="6"|[[File:Royal Randwick light rail stop 20180930.jpg|220px]]--> | | rowspan="6"|[[File:Royal Randwick light rail stop 20180930.jpg|220px]]--> | ||
! Branch | ! Branch !! Opened | ||
|- | |- | ||
| Randwick | | Randwick || 2019 | ||
|- | |- | ||
! colspan="2"|Transfer | ! colspan="2"|Transfer | ||
Line 406: | Line 404: | ||
|} | |} | ||
'''Royal Randwick''', known as '''Royal Randwick Racecourse''' during development, is located at the edge of [[wikipedia:Centennial Park, New South Wales|Centennial Park]], adjacent to Alison Road and opposite the racecourse. The design features an island platform. The proposed location was switched from the south side to the north side of Alison Road in December 2014. This change intended to reduce impacts on the racecourse, improve bus access during major events and provide better access to the nearby Centennial Park and Randwick TAFE.<ref name="dec design adjustment" /> | '''Royal Randwick''', known as '''Royal Randwick Racecourse''' during development, is located at the edge of [[wikipedia:Centennial Park, New South Wales|Centennial Park]], adjacent to Alison Road and opposite the racecourse. The design features an island platform. The proposed location was switched from the south side to the north side of Alison Road in December 2014. This change was intended to reduce impacts on the racecourse, improve bus access during major events and provide better access to the nearby Centennial Park and Randwick TAFE.<ref name="dec design adjustment" /> | ||
{{clear}} | {{clear}} | ||
Line 413: | Line 411: | ||
|- | |- | ||
| rowspan="6"|[[File:Wansey Road light rail stop 20180930.jpg|220px]]--> | | rowspan="6"|[[File:Wansey Road light rail stop 20180930.jpg|220px]]--> | ||
! Branch | ! Branch !! Opened | ||
|- | |- | ||
| Randwick | | Randwick || 2019 | ||
|- | |- | ||
! colspan="2"|Transfer | ! colspan="2"|Transfer | ||
Line 425: | Line 423: | ||
| colspan="2"|{{coord|33|54|41.62|S|151|14|8.08|E|type:railwaystation_region:AU-NSW|display=inline}}--> | | colspan="2"|{{coord|33|54|41.62|S|151|14|8.08|E|type:railwaystation_region:AU-NSW|display=inline}}--> | ||
|} | |} | ||
'''Wansey Stables''' | '''Wansey Stables''' is located on Alison Road, adjacent to the intersection with Wansey Road. The design features an island platform and was originally to be located on Wansey Road itself, but was moved to Alison Road in the project's Submissions Report.<ref name="sub rep" /> | ||
{{clear}} | {{clear}} | ||
=== UNSW High Street === | === UNSW High Street === | ||
{| class="wikitable" style="text-align: center; width: 250px; float:right;"<!-- | {| class="wikitable" style="text-align:center; width:250px; float:right;"<!-- | ||
|- | |- | ||
| rowspan="6"|[[File:UNSW High Street light rail stop 20180916.jpg|220px]]--> | | rowspan="6"|[[File:UNSW High Street light rail stop 20180916.jpg|220px]]--> | ||
! Branch | ! Branch !! Opened | ||
|- | |- | ||
| Randwick | | Randwick || 2019 | ||
|- | |- | ||
! colspan="2"|Transfer | ! colspan="2"|Transfer | ||
Line 445: | Line 443: | ||
|} | |} | ||
The '''UNSW High Street''' stop serves the north-eastern part of the University of New South Wales campus. It was to have been located at the southern end of Wansey Road, adjacent to High Street, but was moved onto High Street itself as part of the project's Submissions Report.<ref name="sub rep"/> As part of the changes to the Randwick stop, the design was changed from an island platform to two side platforms.<ref>{{cite web|title=CBD & South East Light Rail Project State Significant Infrastructure Approval Modification Report – SSI - 6042 MOD 4 Stop changes – High Street, Randwick|url=https://majorprojects.affinitylive.com/public/4e786c069206ee4a58cfc35d06735a0f/01_CSELR_Modification%204%20-%20Main%20Report.pdf|publisher=Transport for NSW|accessdate=7 December 2015|page=12|date=24 November 2015}}</ref> | The '''UNSW High Street''' stop serves the north-eastern part of the University of New South Wales campus. It was to have been located at the southern end of Wansey Road, adjacent to High Street, but was moved onto High Street itself as part of the project's Submissions Report.<ref name="sub rep"/> As part of the changes to the Randwick stop, the design was changed from an island platform to two side platforms.<ref>{{cite web |title=CBD & South East Light Rail Project State Significant Infrastructure Approval Modification Report – SSI - 6042 MOD 4 Stop changes – High Street, Randwick |url=https://majorprojects.affinitylive.com/public/4e786c069206ee4a58cfc35d06735a0f/01_CSELR_Modification%204%20-%20Main%20Report.pdf |publisher=Transport for NSW |accessdate=7 December 2015 |page=12 |date=24 November 2015}}</ref> | ||
{{clear}} | {{clear}} | ||
=== Randwick === | === Randwick === | ||
{| class="wikitable" style="text-align: center; width: 250px; float:right;"<!-- | {| class="wikitable" style="text-align:center; width:250px; float:right;"<!-- | ||
|- | |- | ||
| rowspan="6"|[[File:Randwick light rail stop 20180916 02.jpg|220px]]--> | | rowspan="6"|[[File:Randwick light rail stop 20180916 02.jpg|220px]]--> | ||
! Branch | ! Branch !! Opened | ||
|- | |- | ||
| Randwick | | Randwick || 2019 | ||
|- | |- | ||
! colspan="2"|Transfer | ! colspan="2"|Transfer | ||
Line 465: | Line 463: | ||
|} | |} | ||
'''Randwick''' | '''Randwick''' is located the eastern end of High Street in [[wikipedia:Randwick, New South Wales|Randwick]]. The design features an island platform. The site is proposed to be a major interchange between buses and light rail. Bus stops are proposed for Belmore Road, Avoca Street and Clara Street.<ref>{{cite web |title=CBD & South East Light Rail Project State Significant Infrastructure Approval Modification Report – SSI - 6042 MOD 4 Stop changes – High Street, Randwick |url=https://majorprojects.affinitylive.com/public/4e786c069206ee4a58cfc35d06735a0f/01_CSELR_Modification%204%20-%20Main%20Report.pdf |publisher=Transport for NSW |accessdate=7 December 2015 |page=11 |date=24 November 2015 }}</ref> | ||
The original design featured two side platforms located in High Cross Park adjacent to Belmore Road.<ref>{{cite book |title = CBD and South East Light Rail – Environmental Impact Statement |chapterurl = https://majorprojects.affinitylive.com/public/5aeaea32c2a00a225f28390783360009/05%20CSELR%20EIS%20-%20Chapter%205%20-%20Part%20B.pdf |chapter = Chapter 5 - Part B |work = Transport for NSW |author = Parsons Brinkerhoff |chapter-format = PDF |pages = 5-47 to 5-46 }}</ref> This location attracted criticism from community members due to loss of trees and parkland.<ref>{{cite news |last = Pogson |first = Jenny |title = Randwick community presents petition to save High Cross Park trees from CBD and South East Light Rail |url = http://www.dailytelegraph.com.au/newslocal/city-east/randwick-community-presents-petition-to-save-high-cross-park-trees-from-cbd-and-south-east-light-rail/story-fngr8h22-1227129472717 |accessdate = 1 March 2015 |work = Southern Courier |date = 20 November 2014 }}</ref><ref name="high cross feb 2015">{{cite news |last = Aubusson |first = Laura |title = Battles rage on in Randwick as residents fight to save Centennial Park and High Cross Park |url = http://www.dailytelegraph.com.au/newslocal/city-east/battles-rage-on-in-randwick-as-residents-fight-to-save-centennial-park-and-high-cross-park/story-fngr8h22-1227221645725 |accessdate = 1 March 2015 |work = Southern Courier |date = 16 February 2015 }}</ref> The stop was redesigned in the project's Submissions Report to reduce the loss of green space in the park, however a campaign to move the stop continued.<ref name="sub rep" /><ref name="high cross feb 2015" /> Randwick City Council requested the stop be moved to High Street, outside the Prince of Wales Hospital and Transport for NSW ultimately agreed to do this.<ref name="high cross feb 2015" /> A location within High Cross Park was considered to provide the best interchanges between trams and buses.<ref>{{cite web |title = CBD & South East Light Rail Project State Significant Infrastructure Approval Modification Report – SSI - 6042 MOD 4 Stop changes – High Street, Randwick |url = https://majorprojects.affinitylive.com/public/4e786c069206ee4a58cfc35d06735a0f/01_CSELR_Modification%204%20-%20Main%20Report.pdf |publisher = Transport for NSW |accessdate=7 December 2015 |page = 23 |date = 24 November 2015 }}</ref> | The original design featured two side platforms located in High Cross Park adjacent to Belmore Road.<ref>{{cite book |title = CBD and South East Light Rail – Environmental Impact Statement |chapterurl = https://majorprojects.affinitylive.com/public/5aeaea32c2a00a225f28390783360009/05%20CSELR%20EIS%20-%20Chapter%205%20-%20Part%20B.pdf |chapter = Chapter 5 - Part B |work = Transport for NSW |author = Parsons Brinkerhoff |chapter-format = PDF |pages = 5-47 to 5-46 }}</ref> This location attracted criticism from community members due to loss of trees and parkland.<ref>{{cite news |last=Pogson |first=Jenny |title=Randwick community presents petition to save High Cross Park trees from CBD and South East Light Rail |url=http://www.dailytelegraph.com.au/newslocal/city-east/randwick-community-presents-petition-to-save-high-cross-park-trees-from-cbd-and-south-east-light-rail/story-fngr8h22-1227129472717 |accessdate=1 March 2015 |work=Southern Courier |date=20 November 2014 }}</ref><ref name="high cross feb 2015">{{cite news |last=Aubusson |first=Laura |title=Battles rage on in Randwick as residents fight to save Centennial Park and High Cross Park |url=http://www.dailytelegraph.com.au/newslocal/city-east/battles-rage-on-in-randwick-as-residents-fight-to-save-centennial-park-and-high-cross-park/story-fngr8h22-1227221645725 |accessdate=1 March 2015 |work=Southern Courier |date=16 February 2015}}</ref> The stop was redesigned in the project's Submissions Report to reduce the loss of green space in the park, however a campaign to move the stop continued.<ref name="sub rep" /><ref name="high cross feb 2015" /> Randwick City Council requested the stop be moved to High Street, outside the Prince of Wales Hospital and Transport for NSW ultimately agreed to do this.<ref name="high cross feb 2015" /> A location within High Cross Park was considered to provide the best interchanges between trams and buses.<ref>{{cite web |title=CBD & South East Light Rail Project State Significant Infrastructure Approval Modification Report – SSI - 6042 MOD 4 Stop changes – High Street, Randwick |url=https://majorprojects.affinitylive.com/public/4e786c069206ee4a58cfc35d06735a0f/01_CSELR_Modification%204%20-%20Main%20Report.pdf |publisher=Transport for NSW |accessdate=7 December 2015 |page=23 |date=24 November 2015 }}</ref> | ||
{{clear}} | {{clear}} | ||
=== ES Marks === | === ES Marks === | ||
{| class="wikitable" style="text-align: center; width: 250px; float:right;"<!-- | {| class="wikitable" style="text-align:center; width:250px; float:right;"<!-- | ||
|- | |- | ||
| rowspan="6"|[[File:ES Marks light rail stop 20181216.jpg|220px]]--> | | rowspan="6"|[[File:ES Marks light rail stop 20181216.jpg|220px]]--> | ||
Line 486: | Line 484: | ||
| colspan="2"|{{coord|33|54|21.15|S|151|13|26.09|E|type:railwaystation_region:AU-NSW|display=inline}}--> | | colspan="2"|{{coord|33|54|21.15|S|151|13|26.09|E|type:railwaystation_region:AU-NSW|display=inline}}--> | ||
|} | |} | ||
'''ES Marks''', known as '''Carlton Street''' during development, | '''ES Marks''', known as '''Carlton Street''' during development, is located on Anzac Parade south of the intersection with Carlton Street. The stop serves a residential area. It is named after the nearby ES Marks Athletics Field.<ref name="NRP" /> The design features an island platform.<ref>{{cite book |title=CBD and South East Light Rail – Environmental Impact Statement |chapterurl=https://majorprojects.affinitylive.com/public/5aeaea32c2a00a225f28390783360009/05%20CSELR%20EIS%20-%20Chapter%205%20-%20Part%20B.pdf |chapter=Chapter 5 - Part B |publisher=Transport for NSW |author=Parsons Brinkerhoff| chapter-format=PDF |pages=5-48 to 5-49 }}</ref> | ||
{{clear}} | {{clear}} | ||
=== Kensington === | === Kensington === | ||
{| class="wikitable" style="text-align: center; width: 250px; float:right;"<!-- | {| class="wikitable" style="text-align:center; width:250px; float:right;"<!-- | ||
|- | |- | ||
| rowspan="6"|[[File:Kensington light rail stop 20180701.jpg|220px]]--> | | rowspan="6"|[[File:Kensington light rail stop 20180701.jpg|220px]]--> | ||
Line 506: | Line 504: | ||
|} | |} | ||
'''Kensington''', named '''Todman Avenue''' during development, | '''Kensington''', named '''Todman Avenue''' during development, is located on Anzac Parade north of the intersection with Todman Avenue. The stop serves a residential area and a shopping strip on Anzac Parade in the suburb of [[wikipedia:Kensington, New South Wales|Kensington]]. The design features an island platform.<ref>{{cite book |title=CBD and South East Light Rail – Environmental Impact Statement |chapterurl=https://majorprojects.affinitylive.com/public/5aeaea32c2a00a225f28390783360009/05%20CSELR%20EIS%20-%20Chapter%205%20-%20Part%20B.pdf |chapter=Chapter 5 - Part B |publisher=Transport for NSW|author=Parsons Brinkerhoff|chapter-format=PDF |pages=5-50 to 5-51 }}</ref> | ||
{{clear}} | {{clear}} | ||
=== UNSW Anzac Parade === | === UNSW Anzac Parade === | ||
{| class="wikitable" style="text-align: center; width: 250px; float:right;"<!-- | {| class="wikitable" style="text-align:center; width:250px; float:right;"<!-- | ||
|- | |- | ||
| rowspan="6"|[[File:UNSW Anzac Parade light rail stop 20181216.jpg|220px]]--> | | rowspan="6"|[[File:UNSW Anzac Parade light rail stop 20181216.jpg|220px]]--> | ||
Line 528: | Line 526: | ||
'''UNSW Anzac Parade''' serves the western part of the [[wikipedia:University of New South Wales|University of New South Wales]] campus and the [[wikipedia:National Institute of Dramatic Art|National Institute of Dramatic Art]]. The design includes an island platform in the centre of [[wikipedia:Anzac Parade, Sydney|Anzac Parade]], north of the University Mall. | '''UNSW Anzac Parade''' serves the western part of the [[wikipedia:University of New South Wales|University of New South Wales]] campus and the [[wikipedia:National Institute of Dramatic Art|National Institute of Dramatic Art]]. The design includes an island platform in the centre of [[wikipedia:Anzac Parade, Sydney|Anzac Parade]], north of the University Mall. | ||
The stop was to be located on the eastern side of Anzac Parade and include one island platform and one side platform - though only two tracks. In the project's Submissions Report, the side platform was removed and the stop was moved to the centre of Anzac Parade.<ref name="sub rep" /><ref>{{cite book |title = CBD and South East Light Rail – Environmental Impact Statement |chapterurl = https://majorprojects.affinitylive.com/public/5aeaea32c2a00a225f28390783360009/05%20CSELR%20EIS%20-%20Chapter%205%20-%20Part%20B.pdf |chapter=Chapter 5 - Part B | | The stop was to be located on the eastern side of Anzac Parade and include one island platform and one side platform - though only two tracks. In the project's Submissions Report, the side platform was removed and the stop was moved to the centre of Anzac Parade.<ref name="sub rep" /><ref>{{cite book |title=CBD and South East Light Rail – Environmental Impact Statement |chapterurl=https://majorprojects.affinitylive.com/public/5aeaea32c2a00a225f28390783360009/05%20CSELR%20EIS%20-%20Chapter%205%20-%20Part%20B.pdf |chapter=Chapter 5 - Part B |publisher=Transport for NSW |author=Parsons Brinkerhoff |chapter-format=PDF |pages=5-52 to 5-53 }}</ref> | ||
{{clear}} | {{clear}} | ||
=== Kingsford === | === Kingsford === | ||
{| class="wikitable" style="text-align: center; width: 250px; float:right;"<!-- | {| class="wikitable" style="text-align:center; width:250px; float:right;"<!-- | ||
|- | |- | ||
| rowspan="6"|[[File:Kingsford light rail stop 20181216.jpg|220px]]--> | | rowspan="6"|[[File:Kingsford light rail stop 20181216.jpg|220px]]--> | ||
Line 548: | Line 546: | ||
|} | |} | ||
The '''Kingsford''' stop, known during development as '''Strachan Street''', | The '''Kingsford''' stop, known during development as '''Strachan Street''', is located on [[wikipedia:Anzac Parade, Sydney|Anzac Parade]] to the south of the intersection of Strachan Street and Middle Street in [[wikipedia:Kingsford, New South Wales|Kingsford]]. The stop serves a residential area and a shopping strip on Anzac Parade. The design features an island platform.<ref>{{cite book |title=CBD and South East Light Rail – Environmental Impact Statement |chapterurl=https://majorprojects.affinitylive.com/public/5aeaea32c2a00a225f28390783360009/05%20CSELR%20EIS%20-%20Chapter%205%20-%20Part%20B.pdf |chapter=Chapter 5 - Part B |publisher=Transport for NSW |author=Parsons Brinkerhoff |chapter-format=PDF |pages=5-54 to 5-55 }}</ref> | ||
{{clear}} | {{clear}} | ||
=== Juniors Kingsford === | === Juniors Kingsford === | ||
{| class=wikitable style="text-align: center; width: 250px; float:right" | {| class=wikitable style="text-align:center; width:250px; float:right" | ||
<!--|- | <!--|- | ||
| rowspan="6"|[[image|220px]]--> | | rowspan="6"|[[image|220px]]--> | ||
Line 568: | Line 566: | ||
|} | |} | ||
'''Juniors Kingsford''', known as '''Nine Ways''' during development, | '''Juniors Kingsford''', known as '''Nine Ways''' during development, is located on the southern side of the Nine Ways intersection in Kingsford. The design features two island platforms with the light rail using the two outer platforms and buses using the two inner platforms, providing cross-platform transfers. Terminating facilities for trams are located south of the stop.<ref>{{cite book |title=CBD and South East Light Rail – Environmental Impact Statement |chapterurl=https://majorprojects.affinitylive.com/public/5aeaea32c2a00a225f28390783360009/05%20CSELR%20EIS%20-%20Chapter%205%20-%20Part%20B.pdf |chapter=Chapter 5 - Part B |publisher=Transport for NSW |author=Parsons Brinkerhoff |chapter-format=PDF |pages = 5-56 to 5-57 }}</ref> Transport for NSW submitted a proposal to name the stop Juniors Kingsford which was approved by the New South Wales Geographical Names Board in January 2019.<ref>{{cite web |title=Naming proposal Juniors Kingsford Light Rail Stop |url=http://www.gnb.nsw.gov.au/place_naming/current_proposals/naming_proposal?id=149370 |publisher=NSW Geographical Names Board |date= |archiveurl= |archivedate=}}</ref><ref>{{cite news |title=Kingsford’s light rail stop to be renamed after Juniors, sparking mixed opinions from shop owners, residents |url=https://www.dailytelegraph.com.au/newslocal/southern-courier/transport-bosses-to-name-sydney-light-rail-stop-juniors-kingsford/news-story/ee13c8da541cc282f7a92fae2092c113 |work=The Daily Telegraph |date=22 January 2019 |archiveurl= |archivedate=}}</ref> | ||
{{clear}} | {{clear}} | ||
== Potential extension == | == Potential extension == | ||
Transport for NSW is investigating an extension along the southern Anzac Parade corridor. Three potential options are being examined; a 1.9 kilometre extension to Maroubra Junction, a 5.1 kilometre extension to [[wikipedia:Malabar, New South Wales|Malabar]] and an 8.2 kilometre extension to [[wikipedia:La Perouse, New South Wales|La Perouse]].<ref>{{cite web |title = 2014 State Infrastructure Strategy Update |url = http://www.insw.com/media/42945/inf_j14_871_sis_report_ch02_web.pdf |publisher=Infrastructure NSW |page = 40 }}</ref><ref> | Transport for NSW is investigating an extension along the southern Anzac Parade corridor. Three potential options are being examined; a 1.9 kilometre extension to Maroubra Junction, a 5.1 kilometre extension to [[wikipedia:Malabar, New South Wales|Malabar]] and an 8.2 kilometre extension to [[wikipedia:La Perouse, New South Wales|La Perouse]].<ref>{{cite web |title=2014 State Infrastructure Strategy Update |url=http://www.insw.com/media/42945/inf_j14_871_sis_report_ch02_web.pdf |publisher=Infrastructure NSW |page=40 }}</ref><ref>{{cite news |title=Plans for Sydney to La Perouse light rail steam ahead |url= |work=The Daily Telegraph |date=28 March 2016 |archiveurl= |archivedate=}}</ref> An extension to [[wikipedia:Maroubra Junction, New South Wales|Maroubra Junction]] has the support of Randwick City Council.<ref>{{cite web |title=Light Rail to Randwick |url=http://yoursayrandwick.com.au/lightrail?tool=news_feed#tool_tab |publisher=Randwick City Council |date=17 April 2014 |archiveurl= |archivedate=}}</ref> | ||
<!-- | <!-- | ||
[[File:Anzac Parade through Kingsford and Maroubra from the air.jpg|thumb|center|The southern section of Anzac Parade retains the wide median used by the former tram network.]] | [[File:Anzac Parade through Kingsford and Maroubra from the air.jpg|thumb|center|The southern section of Anzac Parade retains the wide median used by the former tram network.]] |
Latest revision as of 00:10, 26 December 2019
Ownership and operation | |
---|---|
Controlling authority | Transport for NSW |
Operator(s) | Transdev Sydney |
Technical | |
Number of vehicles | 60 |
The CBD and South East Light Rail is a light rail line in the Australian city of Sydney, New South Wales, running from Circular Quay at the northern end of the central business district to the south-eastern suburbs of Randwick and Kingsford. The line is part of Sydney's light rail network. Services are branded as the L2 Randwick Line and L3 Kingsford Line. The L2 Randwick Line opened in December 2019 and the L3 Kingsford Line is set to open in March 2020. Operation and maintenance of the CBD and South East Light Rail is contracted to the ALTRAC Light Rail consortium by the New South Wales Government's transport authority, Transport for NSW. Services are operated by Transdev Sydney as a member of ALTRAC Light Rail.
Background and initial announcement
- F1 Manly
- F2 Taronga Zoo
- F3 Parramatta River
- F4 Cross Harbour
- F5 Neutral Bay
- F6 Mosman Bay
- F7 Double Bay
- F8 Cockatoo Island
Since the light rail network's original line opened in 1997, a line through the Sydney central business district had been suggested numerous times but failed to achieve the support of the New South Wales Government. This changed in February 2010 when the Keneally Government announced a new line from Haymarket to Circular Quay via Barangaroo.[1] The final route was not decided, with the three options being to send the line north via George Street, Sussex Street or a loop using both.[2]
When the O'Farrell Government took office in March 2011, it committed to building a line through the CBD to Barangaroo, with a preferred route along George Street.[3][4][5] It also committed to conducting feasibility studies into the construction of lines from the City to Sydney University and the City to the University of New South Wales.[4][6] On 8 December 2011, the government announced shortlisted potential routes for these extensions.[5] In 2012, Transport for NSW decided the routes to Sydney University and Barangaroo via The Rocks provided fewer customer benefits and were considered a lower priority. A route from Circular Quay to the University of New South Wales via Central station was seen as the best option.[7]
On 13 December 2012, the government announced a commitment to build a $1.6 billion line from Circular Quay down George Street to Central station, then across to Moore Park and down Anzac Parade with branches to Kingsford and Randwick.[8] Construction was expected to begin in 2014 and to take five to six years.[8][9]
Design
The line services areas that were previously served by Sydney's former tram network. Much of the new route follows tram lines of the former network.
The route is mostly on-street but includes an off-street section through Moore Park. The only major engineering works on the line are a new bridge over the Eastern Distributor and a tunnel under Moore Park and Anzac Parade.
Several changes to the design were announced in December 2014. The major changes involve revising platform lengths at all stops to support an increase in the length of the trams from 45m to 67m, redesigning several stops, switching technologies for the delivery of the wire-free section and the removal of a proposed stop at World Square. It was also announced that the projected cost had increased from $1.6 billion to $2.2 billion. The government claimed the increase was due to the design modifications, but a 2016 report produced by the Audit Office of New South Wales found that the increase was largely due to Transport for NSW underestimating the cost of the project.[10][11][12]
The design included the creation of a pedestrian zone along approximately 40% of George Street, between Bathurst and Hunter streets.[8][13][14]
The section between Bathurst Street and Circular Quay will be wire-free.[15] This was originally to have been achieved by equipping the trams with batteries and providing recharging facilities at stops. This was changed to the proprietary ground-level power supply technology of the tram supplier, Alstom.
The line is designed to handle special events in the Moore Park precinct and at Royal Randwick Racecourse. Events at Moore Park were initially planned to be served using two coupled trams 90m long, with double length platforms at the Central Station and Moore Park stops.[13][16] Following the decision to increase the length of the trams to 67m, the plans to operate coupled trams were abandoned.
A depot for the trams was built at the north-western corner of Royal Randwick Racecourse, providing stabling facilities and allowing light maintenance. Heavy maintenance is conducted at the former Rozelle railway yard at Lilyfield, with access to the facility provided via the Inner West Light Rail.[13]
Construction
The line was built as a public-private partnership, with the contract covering detailed design, major construction, operation and maintenance of the line as well as the provision of rolling stock. A contract for early construction works was awarded to Laing O'Rourke in July 2014.[17]
In February 2014, three consortia were short listed for the main contract - covering the construction and operation of the line:[18][19]
- Connecting Sydney - Acciona Infrastructure Australia, Alstom, Capella Capital & Transdev
- iLinQ - Balfour Beatty, Bombardier Transportation, Keolis Downer, Macquarie Capital & McConnell Dowell
- SydneyConnect - John Holland, Plenary Group & Serco
The iLinQ consortium withdrew after Balfour Beatty pulled out of the group. Balfour Beatty was reportedly concerned about cost overruns for the project and falling profitability of the company as a whole.[20]
On 23 October 2014, Connecting Sydney was announced as the preferred bidder. The contract was finalised in December 2014, when it was also announced that the consortium had been renamed ALTRAC Light Rail, and that the opening date had been brought forward to early 2019.[21] The contract also included the operation and maintenance of the Inner West Light Rail from mid-2015.[22][23][24]
Major construction commenced on 23 October 2015, beginning in the section of George Street between King and Market Streets. To minimise disruption along the length of the corridor, works were intended to be staggered across 31 construction zones. The first section of track in the CBD was laid in December 2016, by which time a total of 410 metres of track had already been laid across the project.[25] This increased to around 5 kilometres of track by May 2017.[26] By October 2017, track laying had been completed in seven of the 31 zones along the alignment.[27]
Testing commenced on a short section of the line along Alison Road in February 2018.[28] It reached Circular Quay in July 2019.[29] This enabled testing to take place along the entire line (apart from the Kingsford branch).
Delays
Construction of the line suffered from significant delays. Major construction of the project was due to conclude in April 2018, though finishing works were to continue for some time after.[30][31]
Delays at two zones in the CBD were announced in August 2016. Originally meant to be completed before Christmas 2016, construction work at these zones was to continue for several months longer than originally anticipated.[32] The zones were eventually opened around a year after the planned completion date.[33] Further delays to the project arose during 2016.[34]
By the beginning of 2018 the whole project was significantly behind schedule. In March 2018 - one month before major works were originally due to be completed - the Transport Minister declined to put a date on when he expected construction of the line to be finished, but noted the government was "an unhappy customer" of the ALTRAC consortium.[35]
The relationship deteriorated between the New South Wales Government and Acciona Infrastructure – the construction company delivering the line. A media report from December 2016 claimed a dispute had arisen between the parties over costs incurred from modifications to the line's design.[34] Acciona commenced legal action against the government in April 2018. The company sought additional payments totalling $1.2 billion.[36] Later in the month ALTRAC told the government it was working towards a completion date of March 2020.[37]
In October 2018, Acciona stated the project would not be completed until May 2020.[38] By March 2019, Transport for NSW was reportedly working to have the line open in stages.[39]
The legal dispute was resolved in June 2019, with the New South Wales Government agreeing to pay up to $576 million extra to complete the project. Up to $129 million will only be paid once milestones are met, including the start of passenger services between Circular Quay and Randwick from December 2019, and between Circular Quay and Kingsford by March 2020.[40] A media report in July indicated services were expected to commence between Circular Quay and Randwick in the first week of December and also suggested the Kingsford branch could open earlier than March 2020.[29]
Associated works
Separate to the light rail budget, Randwick City Council earmarked $68 million to partially mitigate the impacts of the light rail. Projects include replacing some of the car parking spaces that will be lost, especially in Kingsford, works to improve traffic flow in the district and public domain works.[41]
The City of Sydney provided $220 million towards the light rail project. This included money for public domain works on George Street and surrounding laneways.[42] The centrepiece of these works is a large arch structure located outside the Sydney Town Hall. Cloud Arch will act as a gateway to the pedestrian section of George Street, with trams passing underneath it.[43]
Opening
The L2 Randwick Line opened on 14 December 2019.[44] The L3 Kingsford Line is expected to open in March 2020.
Criticism
There have been criticism of the project from some parties:
- Action for Public Transport, that it will not have sufficient capacity to replace the bus routes eliminated.[45]
- Save Our Suburbs, that it will disrupt vehicular traffic[46]
- Save Randwick's Trees objecting to the loss of nearly 1,000 trees including from Centennial, Moore and High Cross parks.[47]
- Save our Park campaigning against the loss of Centennial, Moore and adjacent park lands.[48]
Bus network changes
The CBD and South East Light Rail requires significant changes to the bus networks of the Sydney Central Business District and the Eastern Suburbs. Prior to construction of the light rail, bus routes using George Street were permanently removed from the street. The network will be further redesigned after the Kingsford branch of the light rail opens in 2020. Some bus routes from the Eastern Suburbs will be removed from the CBD, with many of the routes integrated with the light rail interchanges at Randwick and Kingsford. Some passengers will be required to change from bus to light rail to complete their journey.
During construction
To accommodate construction of the light rail on George Street, new bus timetables were introduced on 4 October 2015. Buses were diverted from George Street on to other streets in the CBD.[30] Some routes had their terminus changed to such places as Railway Square, Queen Victoria Building and King Street Wharf. A small number of routes were either combined so that they run through the CBD without terminating, removed from the CBD entirely or completely discontinued.[49][50][51][52][53]
After completion
Some bus routes which were diverted from George Street to other streets during the construction, will terminate at Railway Square with their passengers to join the Light Rail while others will be rerouted permanently to the streets to which they were diverted.[54]
The project's Environmental Impact Statement (released in 2013) proposed twenty bus routes that would be withdrawn or curtailed between Kingsford/Randwick and Railway Square/Circular Quay. A number of bus routes using Anzac Parade will unload city bound passengers at the Nine Ways interchange to board the light rail, then continue along Anzac Parade to the University of New South Wales to unload passengers before terminating in Todman Avenue, Kensington. Some bus routes currently operating to the city via Randwick will become feeder services that drop off city bound passengers at the light rail terminus.[54]
Operation
As a member of the ALTRAC Light Rail consortium, Transdev will operate the line until 2034.[55] Services on the Randwick branch are numbered L2 and services on the Kingsford branch are numbered L3.[56]
Fleet
Services are operated by 60 five-section Alstom Citadis X05 trams operating in coupled pairs.[57][58] The first was completed in May 2017, arriving at the Randwick depot on 28 July 2017.[59][60][61]
Route
The line commences outside Circular Quay station heading west on Alfred Street, before proceeding south down George Street, then east via Rawson Place and Eddy Avenue, and south via Chalmers Street to Central station. It then continues east via Devonshire Street over the Eastern Distributor and under Moore Park and Anzac Parade via a tunnel before heading south adjacent to the Moore Park busway. At the intersection of Anzac Parade and Alison Road the line splits into two branches, one continuing down Anzac Parade to terminate outside the South Sydney Junior Rugby League Club at Kingsford, and the second to Randwick via Alison Road, Wansey Road and High Street.[8]
Circular Quay
Opened |
---|
2019 |
Transfer |
Circular Quay railway station Circular Quay ferry wharf Circular Quay bus routes |
The Circular Quay stop serves the locality of Circular Quay at the northern end of the Central Business District. The stop is on Alfred St between Pitt and Loftus Streets. The area has an established role as a transport interchange and is also served by buses, trains and ferries. The stop comprises one island platform and one side platform.[62]
Bridge Street
Opened |
---|
2019 |
Transfer |
None |
The Bridge Street stop is located on George Street, near the intersections with Bridge Street and Grosvenor Street. The stop was known as Grosvenor Street during development. The design includes an island platform. The design originally included two side platforms but was switched to an island platform to retain the existing dedicated left-hand turning lane from George Street into Grosvenor Street.[63]
Wynyard
Opened |
---|
2019 |
Transfer |
Wynyard railway station Wynyard Park bus routes |
The Wynyard stop serves the locality of Wynyard. The stop is located at the northern end of the George Street pedestrian zone, adjacent to the entrance to Wynyard railway station. The design includes two side platforms.[64]
QVB
Opened |
---|
2019 |
Transfer |
Bus |
QVB is located on George Street south of Market Street and adjacent to the Queen Victoria Building, a shopping centre from which the stop takes its name. The design includes two side platforms.[65]
Town Hall
Opened |
---|
2019 |
Transfer |
Town Hall railway station, Bus |
Town Hall is located at the southern end of the George Street pedestrian zone, adjacent to St Andrew's Cathedral. It is named after Town Hall railway station and the Sydney Town Hall.[66] The stop consists of two side platforms.[67]
Chinatown
Opened |
---|
2019 |
Transfer |
Capitol Square light rail stop |
The Chinatown stop is located on George Street, north of Campbell Street. It is named after Sydney's Chinatown precinct. The Capitol Square stop on the Inner West Light Rail is nearby. The design was to include two side platforms, but was changed to an island platform in the project's Submissions Report. The location was also moved 15 metres north.[68]
Haymarket
Opened |
---|
2019 |
Transfer |
Bus |
The Haymarket stop, known as Rawson Place during development, will serve as an interchange for buses entering the city via Broadway. The design includes two side platforms for trams and an adjacent platform for buses, which would allow some bus - tram cross-platform transfers.[69]
Central Chalmers Street
Opened |
---|
2019 |
Transfer |
Central railway station, Bus |
The Central Chalmers Street serves the eastern side of the Central railway station precinct. The stop is known as Central Chalmers Street to distinguish it from the nearby Central Grand Concourse stop on the Inner West Light Rail.[66] The stop consists of one side platform and one island platform.[70]
The stop was originally proposed to consist of three double length (90 metre) platforms, with one of the platforms to be used only during special events - the roadway being open to general traffic at other times.[71] This third platform was removed in the project's Submissions Report, with a crossover to the north of the stop provided instead. The Report also proposed diverting most general traffic via Randle Street and converting the section of Chalmers Street opposite the station into a pedestrian/traffic shared zone.[72] As a result of the December 2014 decision to increase the length of the trams, plans to run double length trams during special events at Moore Park were abandoned. Consequently, the Modifications Report reduced the platform length from 90 metres to 75 metres.[10][73] The third platform was reinstated in an urban design plan released in 2017. This report also proposed closing Chalmers Street to through traffic.[70]
Surry Hills
Opened |
---|
2019 |
Transfer |
Bus |
The Surry Hills stop is located on Devonshire Street, adjacent to Ward Park in Surry Hills. The design originally featured an island platform but was changed to side platforms in the project's Submissions Report.[68] Groundwork for a second Surry Hills stop at Wimbo Park for a potential future station if required will be completed in the initial construction phase.
Moore Park
Opened |
---|
2019 |
Transfer |
None |
The Moore Park stop serves the Moore Park precinct. In regular service the stop serves Sydney Boys High School, Sydney Girls High School and The Entertainment Quarter. The stop is also designed to handle major events at the Sydney Football Stadium and Sydney Cricket Ground, with grade separated access to the platform. At-grade access to the stop is provided for regular use and for disabled passengers during major events.[74] The design features a 75-metre island platform.
The stop's design experienced a number of modifications. Initially, an overhead concourse was proposed for access to the stop during special events with at-grade access at other times. School students would have used the existing footpath and pedestrian crossing of Anzac Parade.[75]
In the project's Submissions Report, the stop was moved 250 metres south and a pedestrian bridge over Anzac Parade and the light rail tracks was included in the design, replacing the existing at-grade crossing of the road and an associated set of traffic lights. The bridge was to be connected to the concourse.[76] In December 2014, the overhead concourse was removed, with underground access for major events provided at both ends of the platform. At-grade access will be used by disabled passengers during major events and by all passengers at other times. The bridge was now designed as a separate structure. As a result of the decision to increase the length of the trams, plans to run double length trams during major events were abandoned. Consequently, the platform length was reduced from 90 metres to 75 metres.[10][77]
Royal Randwick
Branch | Opened |
---|---|
Randwick | 2019 |
Transfer | |
Bus |
Royal Randwick, known as Royal Randwick Racecourse during development, is located at the edge of Centennial Park, adjacent to Alison Road and opposite the racecourse. The design features an island platform. The proposed location was switched from the south side to the north side of Alison Road in December 2014. This change was intended to reduce impacts on the racecourse, improve bus access during major events and provide better access to the nearby Centennial Park and Randwick TAFE.[10]
Wansey Stables
Branch | Opened |
---|---|
Randwick | 2019 |
Transfer | |
None |
Wansey Stables is located on Alison Road, adjacent to the intersection with Wansey Road. The design features an island platform and was originally to be located on Wansey Road itself, but was moved to Alison Road in the project's Submissions Report.[68]
UNSW High Street
Branch | Opened |
---|---|
Randwick | 2019 |
Transfer | |
None |
The UNSW High Street stop serves the north-eastern part of the University of New South Wales campus. It was to have been located at the southern end of Wansey Road, adjacent to High Street, but was moved onto High Street itself as part of the project's Submissions Report.[68] As part of the changes to the Randwick stop, the design was changed from an island platform to two side platforms.[78]
Randwick
Branch | Opened |
---|---|
Randwick | 2019 |
Transfer | |
Bus |
Randwick is located the eastern end of High Street in Randwick. The design features an island platform. The site is proposed to be a major interchange between buses and light rail. Bus stops are proposed for Belmore Road, Avoca Street and Clara Street.[79]
The original design featured two side platforms located in High Cross Park adjacent to Belmore Road.[80] This location attracted criticism from community members due to loss of trees and parkland.[81][82] The stop was redesigned in the project's Submissions Report to reduce the loss of green space in the park, however a campaign to move the stop continued.[68][82] Randwick City Council requested the stop be moved to High Street, outside the Prince of Wales Hospital and Transport for NSW ultimately agreed to do this.[82] A location within High Cross Park was considered to provide the best interchanges between trams and buses.[83]
ES Marks
Branch | |
---|---|
Kingsford | |
Transfer | |
None |
ES Marks, known as Carlton Street during development, is located on Anzac Parade south of the intersection with Carlton Street. The stop serves a residential area. It is named after the nearby ES Marks Athletics Field.[66] The design features an island platform.[84]
Kensington
Branch | |
---|---|
Kingsford | |
Transfer | |
None |
Kensington, named Todman Avenue during development, is located on Anzac Parade north of the intersection with Todman Avenue. The stop serves a residential area and a shopping strip on Anzac Parade in the suburb of Kensington. The design features an island platform.[85]
UNSW Anzac Parade
Branch | |
---|---|
Kingsford | |
Transfer | |
Bus |
UNSW Anzac Parade serves the western part of the University of New South Wales campus and the National Institute of Dramatic Art. The design includes an island platform in the centre of Anzac Parade, north of the University Mall.
The stop was to be located on the eastern side of Anzac Parade and include one island platform and one side platform - though only two tracks. In the project's Submissions Report, the side platform was removed and the stop was moved to the centre of Anzac Parade.[68][86]
Kingsford
Branch | |
---|---|
Kingsford | |
Transfer | |
None |
The Kingsford stop, known during development as Strachan Street, is located on Anzac Parade to the south of the intersection of Strachan Street and Middle Street in Kingsford. The stop serves a residential area and a shopping strip on Anzac Parade. The design features an island platform.[87]
Juniors Kingsford
Branch | |
---|---|
Kingsford | |
Transfer | |
Bus |
Juniors Kingsford, known as Nine Ways during development, is located on the southern side of the Nine Ways intersection in Kingsford. The design features two island platforms with the light rail using the two outer platforms and buses using the two inner platforms, providing cross-platform transfers. Terminating facilities for trams are located south of the stop.[88] Transport for NSW submitted a proposal to name the stop Juniors Kingsford which was approved by the New South Wales Geographical Names Board in January 2019.[89][90]
Potential extension
Transport for NSW is investigating an extension along the southern Anzac Parade corridor. Three potential options are being examined; a 1.9 kilometre extension to Maroubra Junction, a 5.1 kilometre extension to Malabar and an 8.2 kilometre extension to La Perouse.[91][92] An extension to Maroubra Junction has the support of Randwick City Council.[93]
References
- ↑ "Transport plan for Sydney" (PDF) (Press release). New South Wales Governemnt. 21 February 2010. Archived from the original on 12 March 2011. https://web.archive.org/web/20110312213829/http://www.nsw.gov.au/sites/default/files/uploads/common/Transport%20Overview%20Statement.pdf. Retrieved 25 February 2011.
- ↑ "Work underway on $500 million Sydney light rail revolution" (PDF) (Press release). New South Wales Government. 14 August 2010. Archived from the original on 17 February 2011. https://web.archive.org/web/20110217070742/http://www.transport.nsw.gov.au/sites/default/files/releases/100814_work_underway_on_500_million_sydney_light_rail_revolution.pdf. Retrieved 25 February 2011.
- ↑ Clennell, Andrew (9 July 2011). "Premier Barry O'Farrell promises light rail revolution". The Daily Telegraph. Archived from the original on 15 January 2012. https://web.archive.org/web/20120115031830/http://southern-courier.whereilive.com.au/news/story/premier-barry-ofarrell-promises-light-rail-revolution. Retrieved 14 December 2012.
- ↑ 4.0 4.1 Saulwick, Jacob (14 June 2011). "Light rail brought on board multi-trip tickets". The Sydney Morning Herald. http://www.smh.com.au/nsw/light-rail-brought-on-board-multitrip-tickets-20110613-1g0jb.html. Retrieved 9 December 2011.
- ↑ 5.0 5.1 "Expanding light rail - potential routes shortlisted" (Press release). Ministry for Transport. 8 December 2011. http://yoursayrandwick.com.au/document/show/262. Retrieved 9 December 2011.
- ↑ "Sydney Light Rail Program". Transport for NSW. http://www.transport.nsw.gov.au/lightrail-program. Retrieved 30 June 2013.
- ↑ "CBD and South East Light Rail". Transport for NSW. http://www.transport.nsw.gov.au/lightrail-program/cbd-and-south-east-light-rail.
- ↑ 8.0 8.1 8.2 8.3 "Sydney's Light Rail Future". Transport for NSW. 13 December 2012. pp. 9, 13, 14–17, 24. Archived from the original on 10 April 2013. https://web.archive.org/web/20130410121516/http://engage.haveyoursay.nsw.gov.au/document/show/601. Retrieved 14 December 2012.
- ↑ Campion, Vikki; Wood (14 December 2012). "Trams will track Sydney's transport future". The Daily Telegraph. http://www.dailytelegraph.com.au/news/trams-will-track-sydneys-transport-future/story-e6freuy9-1226536459334. Retrieved 14 December 2012.
- ↑ 10.0 10.1 10.2 10.3 "CBD and South East Light Rail improvements to deliver a better service for customers". Transport for NSW. 2 December 2014. http://www.transport.nsw.gov.au/media-releases/cbd-and-south-east-light-rail-improvements-deliver-better-service-customers.
- ↑ "Sydney light rail line costs blow out to $2.2 billion – $600 million more than budgeted". The Sydney Morning Herald. 10 November 2014. http://www.smh.com.au/nsw/sydney-light-rail-line-costs-blow-out-to-22-billion--600-million-more-than-budgeted-20141109-11jazn.html.
- ↑ "Costs are higher and benefits are lower than the approved business case". Audit Office of New South Wales. 30 November 2016. http://www.audit.nsw.gov.au/publications/latest-reports/performance/cbd-and-south-east-light-rail-project/executive-summary/1-executive-summary. Retrieved 1 December 2016.
- ↑ 13.0 13.1 13.2 "CBD and South East Light Rail - State Significant Infrastructure Application Supporting Document" (PDF). Transport for NSW. 21 June 2013. p. 23. Archived from the original on 27 September 2013. https://web.archive.org/web/20130927100041/http://www.transport.nsw.gov.au/sites/default/files/b2b/projects/CSELR_State_Infrastructure_Application_June_2013.pdf. Retrieved 12 July 2013.
- ↑ Modifications Report December 2014, pg1
- ↑ Campion, Vikki. "Sydney's new light rail system will feature futuristic wire-free trams to ensure clutter-free streets". The Daily Telegraph. http://www.dailytelegraph.com.au/news/nsw/sydney8217s-new-light-rail-system-will-feature-futuristic-wirefree-trams-to-ensure-clutterfree-streets/story-fni0cx12-1226714773633.
- ↑ Modification Report December 2014, p. 25.
- ↑ "Laing O'Rourke has been awarded the first contract to return light rail to the centre of the Sydney CBD.". Laing O'Rourke. 1 July 2014. http://www.laingorourke.com/media/news-releases/2014/returning-light-rail-to-sydney.aspx.
- ↑ "Tender out to deliver and operate Sydney's Light Rail Network". Transport for NSW. 7 March 2014. Archived from the original on 13 March 2014. https://web.archive.org/web/20140313103856/http://www.transport.nsw.gov.au/media-releases/tender-out-deliver-and-operate-sydneys-light-rail-network#.
- ↑ "Three shortlisted for Sydney light rail PPP". International Railway Journal. 20 February 2014. http://www.railjournal.com/index.php/australia-nz/three-shortlisted-for-sydney-light-rail-ppp.html?channel=541.
- ↑ Saulwick, Jacob (22 July 2014). "British heavyweights pull out of bid for Sydney city light-rail project". The Sydney Morning Herald. http://www.smh.com.au/nsw/sydney-traffic/british-heavyweights-pull-out-of-bid-for-sydney-city-lightrail-project-20140721-zvapx.html. Retrieved 22 July 2014.
- ↑ "CBD and South East Light Rail contract awarded with earlier delivery date". Transport for NSW. 18 December 2014. http://www.transport.nsw.gov.au/media-releases/cbd-and-south-east-light-rail-contract-awarded-earlier-delivery-date. Retrieved 18 December 2014.
- ↑ "Huge win for customers as preferred bidder announced for CBD and South East Light Rail project". Transport for NSW. 23 October 2014. http://www.transport.nsw.gov.au/media-releases/huge-win-customers-preferred-bidder-announced-cbd-and-south-east-light-rail-project.
- ↑ "Sydney CBD & South East light rail preferred bidder named". Railway Gazette. 23 October 2014. http://www.railwaygazette.com/news/single-view/view/sydney-cbd-south-east-light-rail-preferred-bidder-named.html.
- ↑ "Three international consortia in the running to build and operate Light Rail". Transport for NSW. 14 Feburary 2014. http://www.transport.nsw.gov.au/media-releases/three-international-consortia-running-build-and-operate-light-rail.
- ↑ "Cementing a new era on George Street with first light rail tracks". Transport for NSW. 19 December 2016. http://www.transport.nsw.gov.au/newsroom/media-releases/cementing-new-era-george-street-first-light-rail-tracks.
- ↑ "Light Rail comes to the Quay". Transport for NSW. 4 May 2017. http://www.transport.nsw.gov.au/newsroom/media-releases/light-rail-comes-quay.
- ↑ O'Sullivan, Matt (15 October 2017). "Sydney retailers face yet another Christmas of rail disruption". The Sydney Morning Herald. https://www.smh.com.au/national/nsw/sydney-retailers-face-yet-another-christmas-of-rail-disruption-20171011-gyylzb.html. Retrieved 12 March 2018.
- ↑ "Testing begins on Sydney CBD and South East LRT". Metro Report International. 28 February 2018. http://www.metro-report.com/news/news-by-region/asia-pacific-ex-china/single-view/view/testing-begins-on-sydneys-cbd-south-east-light-rail.html.
- ↑ 29.0 29.1 O'Sullivan, Matt (30 July 2019). "Near misses spark warning as Sydney's new trams reach Circular Quay". The Sydney Morning Herald. https://www.smh.com.au/national/nsw/near-misses-spark-warning-as-sydney-s-new-trams-reach-circular-quay-20190730-p52c02.html.
- ↑ 30.0 30.1 "Final countdown to construction: Sydney Light Rail major works start October 23". Transport for NSW. 28 May 2015. http://www.transport.nsw.gov.au/media-releases/final-countdown-construction-sydney-light-rail-major-works-start-october-23.
- ↑ Saulwick, Jacob (28 May 2015). "Bike lanes out as George Street light rail project takes off". The Sydney Morning Herald. http://www.smh.com.au/nsw/bike-lanes-out-as-george-street-light-rail-project-takes-off-20150528-ghbamo.html. Retrieved 28 May 2015.
- ↑ Hawke, Sarah (9 August 2016). "Sydney light rail construction delayed after disused underground utilities found". ABC News. http://www.abc.net.au/news/2016-08-09/light-rail-construction-to-cause-sydney-cbd-delays/7704766?WT.ac=localnews_sydney.
- ↑ "Christmas coming to the CBD". Transport for NSW. 30 November 2017. http://sydneylightrail.transport.nsw.gov.au/news/christmas-coming-cbd. Retrieved 13 March 2018.
- ↑ 34.0 34.1 O'Sullivan, Matt (5 December 2016). "More delays dog Sydney's $2.1 billion light rail line amid backroom squabbling". The Sydney Morning Herald. http://www.smh.com.au/nsw/more-delays-dog-sydneys-21-billion-light-rail-line-amid-backroom-squabbling-20161201-gt2cq8.html.
- ↑ O'Sullivan, Matt (12 March 2018). "Credit card payments for trips expanded across ferries, light rail". The Sydney Morning Herald. https://www.smh.com.au/national/nsw/credit-card-payments-for-trips-expanded-across-ferries-light-rail-20180312-p4z3xo.html. Retrieved 12 March 2018.
- ↑ Cockburn, Paige (7 April 2018). "Sydney light rail contractor Acciona suing NSW Government; further delays to construction likely". ABC News. http://www.abc.net.au/news/2018-04-07/light-rail-contractor-sues-nsw-government/9629948. Retrieved 7 April 2018.
- ↑ Gerathy, Sarah (19 April 2018). "Sydney's light rail is one year behind schedule, now set for 2020 finish". ABC News. http://www.abc.net.au/news/2018-04-19/sydney-light-rail-is-one-year-behind-schedule/9674512. Retrieved 19 April 2018.
- ↑ "Sydney Light Rail delayed again, completion now May 2020". ABC News. 2018-10-04. http://www.abc.net.au/news/2018-10-04/sydney-light-rail-delayed-again-and-will-not-open-until-may-2020/10337658. Retrieved 2018-10-05.
- ↑ O'Sullivan, Matt (7 March 2019). "Sydney's troubled light rail line set for staged opening to passengers". The Sydney Morning Herald. https://www.smh.com.au/national/nsw/sydney-s-troubled-light-rail-line-set-for-staged-opening-to-passengers-20190306-p5122t.html.
- ↑ "NSW government to pay $576m extra to Sydney light rail subcontractors". The Guardian Australia. 2019-06-03. https://www.theguardian.com/australia-news/2019/jun/03/nsw-government-to-pay-576m-extra-to-sydney-light-rail-subcontractors. Retrieved 2019-06-05.
- ↑ "Council Endorses $68 Million Light Rail Support Plan". Randwick City Council. 30 April 2014. https://www.randwick.nsw.gov.au/about-council/news/news-items/2014/april/council-endorses-$68-million-light-rail-support-plan.
- ↑ "Light rail gets the green light". City of Sydney. http://www.cityofsydney.nsw.gov.au/vision/city-transformation/light-rai. Retrieved 21 February 2015.
- ↑ "Cloud Arch". City of Sydney. http://www.cityartsydney.com.au/artwork/cloud-arch/. Retrieved 21 February 2015.
- ↑ Raper, Ashleigh. "Sydney light rail opens and takes passengers down George Street again after 58 years". Australian Broadcasting Corporation. https://www.abc.net.au/news/2019-12-14/sydney-light-rail-opens-after-delays-and-cost-blowouts/11766132. Retrieved 14 December 2019.
- ↑ Donovan, Jim (7 July 2014). "Sydney tram plan will produce peak-hour chaos". The Sydney Morning Herald. http://www.smh.com.au/comment/sydney-tram-plan-will-produce-peakhour-chaos-20140706-zsxvr.html. Retrieved 26 January 2015.
- ↑ Tony Recsei (22 December 2014). "Choked transport arteries need underground solution". The Sydney Morning Herald. http://www.smh.com.au/comment/choked-transport-arteries-need-underground-solution-20141221-128rqn.html. Retrieved 26 January 2015.
- ↑ "Randwick community presents petition to save high cross park trees from CBD and south east light rail". The Daily Telegraph. http://www.dailytelegraph.com.au/newslocal/city-east/randwick-community-presents-petition-to-save-high-cross-park-trees-from-cbd-and-south-east-light-rail/story-fngr8h22-1227129472717.
- ↑ "Battles rage on in Randwick as residents fight to save Centennial Park and High Cross Park". The Daily Telegraph. http://www.dailytelegraph.com.au/newslocal/city-east/battles-rage-on-in-randwick-as-residents-fight-to-save-centennial-park-and-high-cross-park/story-fngr8h22-1227221645725.
- ↑ "Preparing for tomorrow's Sydney: New CBD bus network to ease congestion". Transport for NSW. 17 October 2015. http://www.transport.nsw.gov.au/media-releases/preparing-tomorrows-sydney-new-cbd-bus-network-ease-congestion.
- ↑ "New cross-city bus routes to ease congestion in the CBD". Transport for NSW. 17 October 2015. http://www.transport.nsw.gov.au/media-releases/new-cross-city-bus-routes-ease-congestion-cbd.
- ↑ "Bus changes outside the Sydney CBD". Transport for NSW. 17 October 2015. http://www.transport.nsw.gov.au/media-releases/bus-changes-outside-sydney-cbd.
- ↑ "New bus services set to roll into Barangaroo and Walsh Bay". Transport for NSW. 17 October 2015. Archived from the original on 20 July 2015. https://web.archive.org/web/20150720220711/http://www.transport.nsw.gov.au/media-releases/new-bus-services-set-roll-barangaroo-and-walsh-bay#.
- ↑ "A new CBD bus network". Transport for NSW. http://www.transportnsw.info/resources/documents/brochures/cbd-bus-network-brochure.pdf.
- ↑ 54.0 54.1 "CSELR-Environmental-Impact-Statement Volume 2: Technical Papers 1 & 2" (PDF). Transport for NSW. 14 November 2013. Archived from the original on 4 March 2016. https://web.archive.org/web/20160304043202/http://www.sydneylightrail.transport.nsw.gov.au/Bullseye/handlers/DownloadMediaFile.ashx?file=~%2FBullseye%2Fmedia%2FSydney-Light-Rail%2FEIS%2FCSELR_EIS_Volume_2.pdf%3Fext%3D.pdf.
- ↑ "Transdev consortium achieves financial close on Sydney Light Rail PPP" (Press release). Transdev. 25 February 2015. Archived from the original on 11 April 2015. https://web.archive.org/web/20150411051000/http://www.transdevsydney.com.au/index.php?mact=NewsManager%2Ccntnt01%2Cfrontend_article_details%2C0&cntnt01article_id=43&cntnt01returnid=101. Retrieved 5 April 2015.
- ↑ "Light Rail Network Line Diagram". Transport for NSW. https://www.transport.nsw.gov.au/sites/default/files/b2b/releases/cselr-network-line-diagram-and-recommended-stop-names.jpg. Retrieved 14 March 2017.
- ↑ "Sydney is first Citadis X05 customer". Railway Gazette International. 25 February 2015. http://www.railwaygazette.com/news/single-view/view/sydney-is-first-citadis-x05-tram-customer.html.
- ↑ "New Citadis X05 heads to Sydney". Tramways & Urban Transit. 2 March 2015. http://www.tautonline.com/new-citadis-x05-heads-sydney/.
- ↑ "Alstom completes first Citadis X05 LRVs for Sydney". International Railway Journal. 24 May 2017. http://www.railjournal.com/index.php/australia-nz/alstom-completes-first-citadis-x05-lrvs-for-sydney.html?channel=526.
- ↑ "First Citadis X05 tram rolled out". Metro Report International. 24 May 2017. http://www.metro-report.com/news/single-view/view/first-citadis-x05-tram-rolled-out.html.
- ↑ "Worldwide Review" Tramways & Urban Transit issue 957 September 2017 page 350
- ↑ Parsons Brinkerhoff. "Chapter 5 - Part A". CBD and South East Light Rail – Environmental Impact Statement. Transport for NSW. pp. 5-18 to 5-19. https://majorprojects.affinitylive.com/public/af988042f1463435bbe7c7ce83554acb/04%20CSELR%20EIS%20-%20Chapter%205%20-%20Part%20A.pdf.
- ↑ "CBD and South East Light Rail – Modification Report". Transport for NSW. pp. 10–11. https://majorprojects.affinitylive.com/public/bd9fa8e85aeb4396512d5e710e3d8da5/20141202_01_CBD_and_South_East_light_rail_modifications_report.pdf. Retrieved 3 December 2014.
- ↑ Parsons Brinkerhoff. "Chapter 5 - Part A". CBD and South East Light Rail – Environmental Impact Statement. Transport for NSW. pp. 5-22 to 5-23. https://majorprojects.affinitylive.com/public/af988042f1463435bbe7c7ce83554acb/04%20CSELR%20EIS%20-%20Chapter%205%20-%20Part%20A.pdf.
- ↑ Parsons Brinkerhoff. "Chapter 5 - Part A". CBD and South East Light Rail – Environmental Impact Statement. Transport for NSW. pp. 5-24 to 5-25. https://majorprojects.affinitylive.com/public/af988042f1463435bbe7c7ce83554acb/04%20CSELR%20EIS%20-%20Chapter%205%20-%20Part%20A.pdf.
- ↑ 66.0 66.1 66.2 "Name recommendations pack City and South East Light Rail (CSELR)". Transport for NSW. 8 August 2017. http://data.sydneylightrail.transport.nsw.gov.au/s3fs-public/Name%20Recommendations%20Pack%20-%20CBD%20and%20South%20East%20Light%20Rail.pdf.
- ↑ Parsons Brinkerhoff. "Chapter 5 - Part A". CBD and South East Light Rail – Environmental Impact Statement. Transport for NSW. pp. 5-26 to 5-27. https://majorprojects.affinitylive.com/public/af988042f1463435bbe7c7ce83554acb/04%20CSELR%20EIS%20-%20Chapter%205%20-%20Part%20A.pdf.
- ↑ 68.0 68.1 68.2 68.3 68.4 68.5 "CBD and South East Light Rail – Submissions Report, incorporating Preferred Infrastructure Report - Vol.1 Part A". Transport for NSW. March 2014. pp. xxi - xxiii. https://majorprojects.affinitylive.com/public/a09c6493c9ae47720ca17be3fcaf1556/Submissions%20Report%20incorporating%20Preferred%20Infrastructure%20Report_Volume%201_Part%20A.pdf. Retrieved 12 March 2014.
- ↑ Parsons Brinkerhoff. "Chapter 5 - Part B". CBD and South East Light Rail – Environmental Impact Statement. Transport for NSW. pp. 5-32 to 5-33. https://majorprojects.affinitylive.com/public/5aeaea32c2a00a225f28390783360009/05%20CSELR%20EIS%20-%20Chapter%205%20-%20Part%20B.pdf.
- ↑ 70.0 70.1 "Urban Design and Landscape Plan Surry Hills". Transport for NSW. pp. 29–31. http://data.sydneylightrail.transport.nsw.gov.au/s3fs-public/UDLP%20Surry%20Hills.pdf?KYo4Q20V0nGgELKs3zqsijP9AMZrlCmV. Retrieved 8 May 2017.
- ↑ Parsons Brinkerhoff. "Chapter 5 - Part B". CBD and South East Light Rail – Environmental Impact Statement. Transport for NSW. pp. 5-34 to 5-35. https://majorprojects.affinitylive.com/public/5aeaea32c2a00a225f28390783360009/05%20CSELR%20EIS%20-%20Chapter%205%20-%20Part%20B.pdf.
- ↑ "CBD and South East Light Rail – Submissions Report, incorporating Preferred Infrastructure Report - Vol.1 Part B". Transport for NSW. March 2014. pp. 6-16 to 6-18. https://majorprojects.affinitylive.com/public/ea044311ff7b7fc8f5b441d56ac5a6c9/Submissions%20Report%20incorporating%20Preferred%20Infrastructure%20Report_Volume%201_Part%20B.pdf. Retrieved 12 March 2014.
- ↑ "CBD and South East Light Rail – Modifications Report". Transport for NSW. p. 25. https://majorprojects.affinitylive.com/public/bd9fa8e85aeb4396512d5e710e3d8da5/20141202_01_CBD_and_South_East_light_rail_modifications_report.pdf. Retrieved 3 December 2014.
- ↑ "CBD and South East Light Rail – Modification Report". Transport for NSW. 3 December 2014.
- ↑ Parsons Brinkerhoff. "Chapter 5 - Part B". CBD and South East Light Rail – Environmental Impact Statement. Transport for NSW. pp. 5-38 to 5-39. https://majorprojects.affinitylive.com/public/5aeaea32c2a00a225f28390783360009/05%20CSELR%20EIS%20-%20Chapter%205%20-%20Part%20B.pdf.
- ↑ CBD and South East Light Rail – Submissions Report, incorporating Preferred Infrastructure Report - Vol.1 Part A. Transport for NSW. March 2014. pp. 6-28 - 6-31, 6-38 - 6-44
- ↑ "CBD and South East Light Rail – Modification Report". Transport for NSW. pp. 17–21, 25. https://majorprojects.affinitylive.com/public/bd9fa8e85aeb4396512d5e710e3d8da5/20141202_01_CBD_and_South_East_light_rail_modifications_report.pdf. Retrieved 3 December 2014.
- ↑ "CBD & South East Light Rail Project State Significant Infrastructure Approval Modification Report – SSI - 6042 MOD 4 Stop changes – High Street, Randwick". Transport for NSW. 24 November 2015. p. 12. https://majorprojects.affinitylive.com/public/4e786c069206ee4a58cfc35d06735a0f/01_CSELR_Modification%204%20-%20Main%20Report.pdf. Retrieved 7 December 2015.
- ↑ "CBD & South East Light Rail Project State Significant Infrastructure Approval Modification Report – SSI - 6042 MOD 4 Stop changes – High Street, Randwick". Transport for NSW. 24 November 2015. p. 11. https://majorprojects.affinitylive.com/public/4e786c069206ee4a58cfc35d06735a0f/01_CSELR_Modification%204%20-%20Main%20Report.pdf. Retrieved 7 December 2015.
- ↑ Parsons Brinkerhoff. "Chapter 5 - Part B". CBD and South East Light Rail – Environmental Impact Statement. pp. 5-47 to 5-46. https://majorprojects.affinitylive.com/public/5aeaea32c2a00a225f28390783360009/05%20CSELR%20EIS%20-%20Chapter%205%20-%20Part%20B.pdf.
- ↑ Pogson, Jenny (20 November 2014). "Randwick community presents petition to save High Cross Park trees from CBD and South East Light Rail". Southern Courier. http://www.dailytelegraph.com.au/newslocal/city-east/randwick-community-presents-petition-to-save-high-cross-park-trees-from-cbd-and-south-east-light-rail/story-fngr8h22-1227129472717. Retrieved 1 March 2015.
- ↑ 82.0 82.1 82.2 Aubusson, Laura (16 February 2015). "Battles rage on in Randwick as residents fight to save Centennial Park and High Cross Park". Southern Courier. http://www.dailytelegraph.com.au/newslocal/city-east/battles-rage-on-in-randwick-as-residents-fight-to-save-centennial-park-and-high-cross-park/story-fngr8h22-1227221645725. Retrieved 1 March 2015.
- ↑ "CBD & South East Light Rail Project State Significant Infrastructure Approval Modification Report – SSI - 6042 MOD 4 Stop changes – High Street, Randwick". Transport for NSW. 24 November 2015. p. 23. https://majorprojects.affinitylive.com/public/4e786c069206ee4a58cfc35d06735a0f/01_CSELR_Modification%204%20-%20Main%20Report.pdf. Retrieved 7 December 2015.
- ↑ Parsons Brinkerhoff. "Chapter 5 - Part B". CBD and South East Light Rail – Environmental Impact Statement. Transport for NSW. pp. 5-48 to 5-49. https://majorprojects.affinitylive.com/public/5aeaea32c2a00a225f28390783360009/05%20CSELR%20EIS%20-%20Chapter%205%20-%20Part%20B.pdf.
- ↑ Parsons Brinkerhoff. "Chapter 5 - Part B". CBD and South East Light Rail – Environmental Impact Statement. Transport for NSW. pp. 5-50 to 5-51. https://majorprojects.affinitylive.com/public/5aeaea32c2a00a225f28390783360009/05%20CSELR%20EIS%20-%20Chapter%205%20-%20Part%20B.pdf.
- ↑ Parsons Brinkerhoff. "Chapter 5 - Part B". CBD and South East Light Rail – Environmental Impact Statement. Transport for NSW. pp. 5-52 to 5-53. https://majorprojects.affinitylive.com/public/5aeaea32c2a00a225f28390783360009/05%20CSELR%20EIS%20-%20Chapter%205%20-%20Part%20B.pdf.
- ↑ Parsons Brinkerhoff. "Chapter 5 - Part B". CBD and South East Light Rail – Environmental Impact Statement. Transport for NSW. pp. 5-54 to 5-55. https://majorprojects.affinitylive.com/public/5aeaea32c2a00a225f28390783360009/05%20CSELR%20EIS%20-%20Chapter%205%20-%20Part%20B.pdf.
- ↑ Parsons Brinkerhoff. "Chapter 5 - Part B". CBD and South East Light Rail – Environmental Impact Statement. Transport for NSW. pp. 5-56 to 5-57. https://majorprojects.affinitylive.com/public/5aeaea32c2a00a225f28390783360009/05%20CSELR%20EIS%20-%20Chapter%205%20-%20Part%20B.pdf.
- ↑ "Naming proposal Juniors Kingsford Light Rail Stop". NSW Geographical Names Board. http://www.gnb.nsw.gov.au/place_naming/current_proposals/naming_proposal?id=149370.
- ↑ "Kingsford’s light rail stop to be renamed after Juniors, sparking mixed opinions from shop owners, residents". The Daily Telegraph. 22 January 2019. https://www.dailytelegraph.com.au/newslocal/southern-courier/transport-bosses-to-name-sydney-light-rail-stop-juniors-kingsford/news-story/ee13c8da541cc282f7a92fae2092c113.
- ↑ "2014 State Infrastructure Strategy Update". Infrastructure NSW. p. 40. http://www.insw.com/media/42945/inf_j14_871_sis_report_ch02_web.pdf.
- ↑ "Plans for Sydney to La Perouse light rail steam ahead". The Daily Telegraph. 28 March 2016.
- ↑ "Light Rail to Randwick". Randwick City Council. 17 April 2014. http://yoursayrandwick.com.au/lightrail?tool=news_feed#tool_tab.