Wikisage, the free encyclopedia of the second generation, is digital heritage
Inner West Light Rail: Difference between revisions
(from https://en.wikipedia.org/w/index.php?title=Dulwich_Hill_Line&oldid=871828385) |
(L2 opened) |
||
(2 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
{{Infobox public transit | |||
{{Infobox | |||
| box_width = 300px | | box_width = 300px | ||
| name = | | name = Inner West Light Rail | ||
| other_name = | | other_name = | ||
| native_name = | | native_name = | ||
Line 18: | Line 17: | ||
| status = | | status = | ||
| locale = | | locale = | ||
| start = | | start = Central | ||
| end = | | end = Dulwich Hill | ||
| | | numstops = 23 | ||
| routes = L1 Dulwich Hill Line | | routes = L1 Dulwich Hill Line | ||
| | | annual_patronage = 10.3 million (2017-18) | ||
| open = 11 August 1997 | | open = 11 August 1997 | ||
| close = | | close = | ||
| | | authority = [[Transport for NSW]] | ||
| operator = | | operator = Transdev Sydney | ||
| depot = Pyrmont | |||
| depot = | | numvehicles = 12 | ||
| | |||
| linelength_km = | | linelength_km = | ||
| linelength_mi = | | linelength_mi = | ||
Line 47: | Line 45: | ||
| elevation_ft = | | elevation_ft = | ||
| elevation = | | elevation = | ||
}} | |||
The '''Inner West Light Rail''' is a [[light rail]] line in [[Sydney]], | The '''Inner West Light Rail''' is a [[light rail]] line in [[Sydney]], New South Wales, Australia running from [[Central station (Sydney)|Central railway station]] through the [[wikipedia:Inner West|Inner West]] to [[wikipedia:Dulwich Hill, New South Wales|Dulwich Hill]]. The 23-stop, 12.8-kilometre route was the the first line to open on the [[Sydney light rail network]]. Services on the line are branded as the '''L1 Dulwich Hill Line'''. | ||
Most of the line is built on the path of the former [[Metropolitan Goods railway line]]. The line opened in 1997 and was extended in 2000 and 2014. Operation and maintenance of the line is contracted to the ALTRAC Light Rail consortium by the New South Wales Government's transport authority, [[Transport for NSW]]. Services are operated by [[wikipedia:Transdev Sydney|Transdev Sydney]] as a member of ALTRAC Light Rail. | Most of the line is built on the path of the former [[Metropolitan Goods railway line]]. The line opened in 1997 and was extended in 2000 and 2014. Operation and maintenance of the line is contracted to the ALTRAC Light Rail consortium by the New South Wales Government's transport authority, [[Transport for NSW]]. Services are operated by [[wikipedia:Transdev Sydney|Transdev Sydney]] as a member of ALTRAC Light Rail. | ||
Line 86: | Line 82: | ||
===Connection to the CBD and South East Light Rail=== | ===Connection to the CBD and South East Light Rail=== | ||
<!--[[File:Inner West and CBD & South East light rail intersection work Jan 2017 2.jpg|thumb|Intersection of [[George Street, Sydney|George]] & Hay Streets being rebuilt in January 2017]]--> | <!--[[File:Inner West and CBD & South East light rail intersection work Jan 2017 2.jpg|thumb|Intersection of [[George Street, Sydney|George]] & Hay Streets being rebuilt in January 2017]]--> | ||
The line was closed between Central and Convention in January 2017 to allow for construction work at the [[wikipedia:George Street, Sydney|George]] and Hay Street intersection as part of the [[CBD and South East Light Rail]] project.<ref name="2016-17 closure">{{cite web|title=Alerts for L1 Dulwich Hill - Buses replace light rail between Central and The Star|url=http://www.transportnsw.info/en/transport-status/alerts-route.page?routeNum=L1&routeDesc=Dulwich+Hill&mot=LightRail|website=transportnsw.info|publisher=Transport for NSW|accessdate=8 January 2017|archiveurl=https://web.archive.org/web/20161227015952/http://www.transportnsw.info/en/transport-status/alerts-route.page?routeNum=L1&routeDesc=Dulwich+Hill&mot=LightRail|archivedate=27 December 2016}}</ref> A further closure was required in January 2018 to install a junction between the two lines.<ref>{{cite web|title=Light rail network closures due to trackwork: buses replace light rail throughout January|url=http://www.transdevsydney.com.au/index.php?mact=NewsManager,cntnt01,frontend_article_details,0&cntnt01article_id=62&cntnt01returnid=21|publisher=Transdev Sydney|accessdate=28 January 2018|archiveurl=https://web.archive.org/web/20180128061703/http://www.transdevsydney.com.au/index.php?mact=NewsManager,cntnt01,frontend_article_details,0&cntnt01article_id=62&cntnt01returnid=21|archivedate=28 January 2018|date=21 December 2017}}</ref> The connection | The line was closed between Central and Convention in January 2017 to allow for construction work at the [[wikipedia:George Street, Sydney|George]] and Hay Street intersection as part of the [[CBD and South East Light Rail]] project.<ref name="2016-17 closure">{{cite web|title=Alerts for L1 Dulwich Hill - Buses replace light rail between Central and The Star|url=http://www.transportnsw.info/en/transport-status/alerts-route.page?routeNum=L1&routeDesc=Dulwich+Hill&mot=LightRail|website=transportnsw.info|publisher=Transport for NSW|accessdate=8 January 2017|archiveurl=https://web.archive.org/web/20161227015952/http://www.transportnsw.info/en/transport-status/alerts-route.page?routeNum=L1&routeDesc=Dulwich+Hill&mot=LightRail|archivedate=27 December 2016}}</ref> A further closure was required in January 2018 to install a junction between the two lines.<ref>{{cite web|title=Light rail network closures due to trackwork: buses replace light rail throughout January|url=http://www.transdevsydney.com.au/index.php?mact=NewsManager,cntnt01,frontend_article_details,0&cntnt01article_id=62&cntnt01returnid=21|publisher=Transdev Sydney|accessdate=28 January 2018|archiveurl=https://web.archive.org/web/20180128061703/http://www.transdevsydney.com.au/index.php?mact=NewsManager,cntnt01,frontend_article_details,0&cntnt01article_id=62&cntnt01returnid=21|archivedate=28 January 2018|date=21 December 2017}}</ref> The connection is used by trams of the CBD and South East line to access a maintenance facility at Lilyfield. | ||
==Ownership & operation== | ==Ownership & operation== | ||
Line 97: | Line 93: | ||
Metro Transport Sydney was purchased by the New South Wales Government in March 2012.<ref>[http://www.theaustralian.com.au/business/wall-street-journal/australian-infrastructure-fund-sells-metro-transport-stake/story-fnay3vxj-1226308293323 Australian Infrastructure Fund sells Metro Transport stake] ''The Australian'' 23 March 2012</ref><ref>[http://www.openbriefing.com/AsxDownload.aspx?pdfUrl=Report%2FComNews%2F20120323%2F01281652.pdf AIX divests its 38.9 percent interest in Metro Transport Sydney] Australian Infrastructure Fund 23 March 2012</ref> Veolia Transdev (later just [[wikipedia:Transdev|Transdev]]) remained the operator, operating as [[wikipedia:Transdev Australasia#Transdev Sydney|Transdev Sydney]]. | Metro Transport Sydney was purchased by the New South Wales Government in March 2012.<ref>[http://www.theaustralian.com.au/business/wall-street-journal/australian-infrastructure-fund-sells-metro-transport-stake/story-fnay3vxj-1226308293323 Australian Infrastructure Fund sells Metro Transport stake] ''The Australian'' 23 March 2012</ref><ref>[http://www.openbriefing.com/AsxDownload.aspx?pdfUrl=Report%2FComNews%2F20120323%2F01281652.pdf AIX divests its 38.9 percent interest in Metro Transport Sydney] Australian Infrastructure Fund 23 March 2012</ref> Veolia Transdev (later just [[wikipedia:Transdev|Transdev]]) remained the operator, operating as [[wikipedia:Transdev Australasia#Transdev Sydney|Transdev Sydney]]. | ||
In February 2014, three consortia were short listed to build and operate the [[CBD and South East Light Rail]]. The contract also included the right to the operate the Dulwich Hill Line. The three short listed operators were [[wikipedia:Keolis|Keolis]] (iLinQ consortium), [[wikipedia:Serco|Serco]] (SydneyConnect consortium) and Transdev (Connecting Sydney consortium).<ref>[http://www.transport.nsw.gov.au/media-releases/tender-out-deliver-and-operate-sydneys-light-rail-network Tender out to deliver and operate Sydney's Light Rail Network] Transport for NSW 7 March 2014</ref><ref>[http://www.railjournal.com/index.php/australia-nz/three-shortlisted-for-sydney-light-rail-ppp.html?channel=541 Three shortlisted for Sydney light rail PPP] ''International Railway Journal'' 20 February 2014</ref> In December 2014, the Connecting Sydney consortium (which was renamed ALTRAC Light Rail) was awarded the contract, meaning Transdev retains the right to operate the Dulwich Hill Line. The new contract began in July 2015 and runs until 2034.<ref name=July2015>[http://www.transport.nsw.gov.au/media-releases/delivering-integrated-light-rail-system-altrac-takes-over-operation-inner-west-light Delivering an integrated light rail system: ALTRAC takes over operation of inner west light rail] Transport for NSW 2 July 2015</ref><ref>{{cite web|title=CBD and South East Light Rail contract awarded with earlier delivery date|url=http://www.transport.nsw.gov.au/media-releases/cbd-and-south-east-light-rail-contract-awarded-earlier-delivery-date|publisher=Transport for NSW|date=18 December 2014}}</ref><ref>{{cite press release | url=http://www.transdevsydney.com.au/index.php?mact=NewsManager,cntnt01,frontend_article_details,0&cntnt01article_id=43&cntnt01returnid=101 | title=Transdev consortium achieves financial close on Sydney Light Rail PPP | publisher=Transdev | date=25 February 2015 | accessdate=5 April 2015}}</ref> | In February 2014, three consortia were short listed to build and operate the [[CBD and South East Light Rail]]. The contract also included the right to the operate the L1 Dulwich Hill Line. The three short listed operators were [[wikipedia:Keolis|Keolis]] (iLinQ consortium), [[wikipedia:Serco|Serco]] (SydneyConnect consortium) and Transdev (Connecting Sydney consortium).<ref>[http://www.transport.nsw.gov.au/media-releases/tender-out-deliver-and-operate-sydneys-light-rail-network Tender out to deliver and operate Sydney's Light Rail Network] Transport for NSW 7 March 2014</ref><ref>[http://www.railjournal.com/index.php/australia-nz/three-shortlisted-for-sydney-light-rail-ppp.html?channel=541 Three shortlisted for Sydney light rail PPP] ''International Railway Journal'' 20 February 2014</ref> In December 2014, the Connecting Sydney consortium (which was renamed ALTRAC Light Rail) was awarded the contract, meaning Transdev retains the right to operate the Dulwich Hill Line. The new contract began in July 2015 and runs until 2034.<ref name=July2015>[http://www.transport.nsw.gov.au/media-releases/delivering-integrated-light-rail-system-altrac-takes-over-operation-inner-west-light Delivering an integrated light rail system: ALTRAC takes over operation of inner west light rail] Transport for NSW 2 July 2015</ref><ref>{{cite web|title=CBD and South East Light Rail contract awarded with earlier delivery date|url=http://www.transport.nsw.gov.au/media-releases/cbd-and-south-east-light-rail-contract-awarded-earlier-delivery-date|publisher=Transport for NSW|date=18 December 2014}}</ref><ref>{{cite press release | url=http://www.transdevsydney.com.au/index.php?mact=NewsManager,cntnt01,frontend_article_details,0&cntnt01article_id=43&cntnt01returnid=101 | title=Transdev consortium achieves financial close on Sydney Light Rail PPP | publisher=Transdev | date=25 February 2015 | accessdate=5 April 2015}}</ref> | ||
===Ticketing=== | ===Ticketing=== | ||
Line 114: | Line 110: | ||
Several tickets were recognised on the light rail but were not sold onboard. A "TramLink" ticket which allowed travel on Greater Sydney train services and the light rail was available from railway stations.<ref>{{cite web|title=Light rail|url=http://www.131500.com.au/tickets/fares/mytram-light-rail|work=Transport Info|accessdate=2 July 2013}}</ref> From 27 June 2011, all [[wikipedia:MyZone|MyMultis]], the Pensioner Excursion Ticket and Family Funday Sunday were also recognised.<ref>{{cite press release|last=Berejiklian|first=Gladys|title=Pensioners, families big winners in light rail ticket changes|date=14 June 2011|publisher=Minister for Transport|url=http://www.transport.nsw.gov.au/media-releases/pensioners-families-big-winners-light-rail-ticket-changes}}</ref> This improved integration with the broader Sydney ticketing system led to a 30% to 40% increase in patronage on the line in the first months after introduction.<ref name=SMH23Mar12>{{cite news|last=Saulwick|first=Jacob|title='Once-in-a-generation' opportunity to fix transport|url=http://www.smh.com.au/nsw/onceinageneration-opportunity-to-fix-transport-20120323-1vnss.html|newspaper=The Sydney Morning Herald|date=23 March 2012}}</ref> In 2012-13 these products comprised just over half of all tickets used on light rail services.<ref name="12-13 AR"/> | Several tickets were recognised on the light rail but were not sold onboard. A "TramLink" ticket which allowed travel on Greater Sydney train services and the light rail was available from railway stations.<ref>{{cite web|title=Light rail|url=http://www.131500.com.au/tickets/fares/mytram-light-rail|work=Transport Info|accessdate=2 July 2013}}</ref> From 27 June 2011, all [[wikipedia:MyZone|MyMultis]], the Pensioner Excursion Ticket and Family Funday Sunday were also recognised.<ref>{{cite press release|last=Berejiklian|first=Gladys|title=Pensioners, families big winners in light rail ticket changes|date=14 June 2011|publisher=Minister for Transport|url=http://www.transport.nsw.gov.au/media-releases/pensioners-families-big-winners-light-rail-ticket-changes}}</ref> This improved integration with the broader Sydney ticketing system led to a 30% to 40% increase in patronage on the line in the first months after introduction.<ref name=SMH23Mar12>{{cite news|last=Saulwick|first=Jacob|title='Once-in-a-generation' opportunity to fix transport|url=http://www.smh.com.au/nsw/onceinageneration-opportunity-to-fix-transport-20120323-1vnss.html|newspaper=The Sydney Morning Herald|date=23 March 2012}}</ref> In 2012-13 these products comprised just over half of all tickets used on light rail services.<ref name="12-13 AR"/> | ||
The smartcard-based [[Opal ticketing system]] was introduced to the line on 1 December 2014. Patronage increased in the months following the introduction of Opal.<ref name="gladys press release 27 march">{{cite press release | url=http://www.gladys.com.au/content/inner-west-light-rail-extension-celebrates-first-year-new-light-rail-vehicles-go-operation | title=Inner West Light Rail extension celebrates first year as new light rail vehicles go into operation | publisher=Gladys Berejiklian | date=27 March 2015 | accessdate=5 April 2015}}</ref> Most paper tickets sold or recognised on light rail services were discontinued on 1 January 2016. The only tickets still available were single and return tickets.<ref>{{cite web |title=Most paper tickets no longer sold from 1 January 2016 |url=http://www.transportnsw.info/sites/en/transport-status/news/2015/ticket-retirement-0116.page |website=transportnsw.info |publisher=Transport for NSW |accessdate=13 August 2015 |deadurl=yes |archiveurl=https://web.archive.org/web/20150806230101/http://www.transportnsw.info/sites/en/transport-status/news/2015/ticket-retirement-0116.page |archivedate=6 August 2015 | The smartcard-based [[Opal ticketing system]] was introduced to the line on 1 December 2014. Patronage increased in the months following the introduction of Opal.<ref name="gladys press release 27 march">{{cite press release | url=http://www.gladys.com.au/content/inner-west-light-rail-extension-celebrates-first-year-new-light-rail-vehicles-go-operation | title=Inner West Light Rail extension celebrates first year as new light rail vehicles go into operation | publisher=Gladys Berejiklian | date=27 March 2015 | accessdate=5 April 2015}}</ref> Most paper tickets sold or recognised on light rail services were discontinued on 1 January 2016. The only tickets still available were single and return tickets.<ref>{{cite web |title=Most paper tickets no longer sold from 1 January 2016 |url=http://www.transportnsw.info/sites/en/transport-status/news/2015/ticket-retirement-0116.page |website=transportnsw.info |publisher=Transport for NSW |accessdate=13 August 2015 |deadurl=yes |archiveurl=https://web.archive.org/web/20150806230101/http://www.transportnsw.info/sites/en/transport-status/news/2015/ticket-retirement-0116.page |archivedate=6 August 2015}}</ref> These last remaining tickets were replaced by Opal-based single trip tickets on 1 August of that year.<ref>{{cite web|title=The last paper tickets to be wrapped up on August 1|url=http://www.transport.nsw.gov.au/media-releases/last-paper-tickets-be-wrapped-august-1|publisher=Transport for NSW|date=4 July 2016}}</ref> | ||
===Naming=== | ===Naming=== | ||
As the original line of Sydney's light rail network, the Dulwich Hill Line lacked special branding and was simply known as the Sydney Light Rail - and later Metro Light Rail after the system was re-branded. Following the purchase of Metro Transport Sydney by the New South Wales Government and the announcement of the CBD and South East Light Rail, the line was named Inner West Light Rail. Since the opening of the 2014 extension to Dulwich Hill, passenger-facing branding of the line has referred to it as the Dulwich Hill Line. The line was given the number L1 as part of a broader program to also number all [[Sydney Trains]] and [[Sydney Ferries]] routes. | As the original line of Sydney's light rail network, the L1 Dulwich Hill Line lacked special branding and was simply known as the Sydney Light Rail - and later Metro Light Rail after the system was re-branded. Following the purchase of Metro Transport Sydney by the New South Wales Government and the announcement of the CBD and South East Light Rail, the line was named Inner West Light Rail. Since the opening of the 2014 extension to Dulwich Hill, passenger-facing branding of the line has referred to it as the L1 Dulwich Hill Line. The line was given the number L1 as part of a broader program to also number all [[Sydney Trains]] and [[Sydney Ferries]] routes. | ||
===Patronage=== | ===Patronage=== | ||
A transport plan released by the New South Wales Government in 1998 reported that the line carried an average of 5,000 passengers on weekdays.<ref>{{cite book|title=Action for Transport 2010: an integrated transport plan for Sydney|date=1998|publisher=New South Wales Government|page=6}}</ref> 2.8 million journeys were made in 2009-10, increasing to 4.2 million in 2012-13. The partial integration of the line into the broader Sydney ticketing system was a major driver of the increase.<ref name="12-13 AR">{{cite web|title=Transport for NSW Annual Report 2012-13|url=http://www.transport.nsw.gov.au/sites/default/files/b2b/publications/annual_reports/tfnsw-annual-report-2013.pdf|publisher=Transport for NSW|accessdate=14 July 2016|pages=52, 361}}</ref><ref>{{cite news|last1=Saulwick|first1=Jacob|title=Monofail, and only government assistance has put trams back on track|url=http://www.smh.com.au/nsw/monofail-and-only-government-assistance-has-put-trams-back-on-track-20110928-1kxgo.html|work=The Sydney Morning Herald|date=29 September 2011}}</ref> In the 12 months to June 2015, the line carried 6.1 million passengers, compared to 3.9 million passengers in the prior year. The increase in the 2014-15 figure was influenced by the opening of the extension to Dulwich Hill in March 2014, while the 2013-14 figure was affected by the suspension of services for much of October 2013 and closures for maintenance works.<ref>{{cite web|title=5. Service Delivery - Volume Six 2015 Transport|url=http://www.audit.nsw.gov.au/publications/latest-reports/financial/volume-six-2015-transport/service-delivery/5-service-delivery|publisher=Audit Office of New South Wales|accessdate=25 November 2015|date=19 November 2015|quote=Light rail patronage increased from 3.9 million passengers in 2013-14 to 6.1 million in 2014-15.}}</ref><ref>[http://www.transport.nsw.gov.au/sites/default/files/b2b/publications/annual_reports/tfnsw-annual-report-2013-14.pdf Annual Report for year ended 30 June 2014] Transport for NSW page 45</ref> In the period from 2015-2016, 9.7 million journeys were made,<ref>{{Cite web|url=https://public.tableau.com/profile/bureau.of.transport.statistics#!/vizhome/PTVisualisations-LightRail2_7_2Nov16/Welcome|title=Tableau Public|website=public.tableau.com| | A transport plan released by the New South Wales Government in 1998 reported that the line carried an average of 5,000 passengers on weekdays.<ref>{{cite book|title=Action for Transport 2010: an integrated transport plan for Sydney|date=1998|publisher=New South Wales Government|page=6}}</ref> 2.8 million journeys were made in 2009-10, increasing to 4.2 million in 2012-13. The partial integration of the line into the broader Sydney ticketing system was a major driver of the increase.<ref name="12-13 AR">{{cite web|title=Transport for NSW Annual Report 2012-13|url=http://www.transport.nsw.gov.au/sites/default/files/b2b/publications/annual_reports/tfnsw-annual-report-2013.pdf|publisher=Transport for NSW|accessdate=14 July 2016|pages=52, 361}}</ref><ref>{{cite news|last1=Saulwick|first1=Jacob|title=Monofail, and only government assistance has put trams back on track|url=http://www.smh.com.au/nsw/monofail-and-only-government-assistance-has-put-trams-back-on-track-20110928-1kxgo.html|work=The Sydney Morning Herald|date=29 September 2011}}</ref> In the 12 months to June 2015, the line carried 6.1 million passengers, compared to 3.9 million passengers in the prior year. The increase in the 2014-15 figure was influenced by the opening of the extension to Dulwich Hill in March 2014, while the 2013-14 figure was affected by the suspension of services for much of October 2013 and closures for maintenance works.<ref>{{cite web|title=5. Service Delivery - Volume Six 2015 Transport|url=http://www.audit.nsw.gov.au/publications/latest-reports/financial/volume-six-2015-transport/service-delivery/5-service-delivery|publisher=Audit Office of New South Wales|accessdate=25 November 2015|date=19 November 2015|quote=Light rail patronage increased from 3.9 million passengers in 2013-14 to 6.1 million in 2014-15.}}</ref><ref>[http://www.transport.nsw.gov.au/sites/default/files/b2b/publications/annual_reports/tfnsw-annual-report-2013-14.pdf Annual Report for year ended 30 June 2014] Transport for NSW page 45</ref> In the period from 2015-2016, 9.7 million journeys were made,<ref>{{Cite web|url=https://public.tableau.com/profile/bureau.of.transport.statistics#!/vizhome/PTVisualisations-LightRail2_7_2Nov16/Welcome|title=Tableau Public|website=public.tableau.com|accessdate=2017-08-01}}</ref> followed by 9.1 million in 2016-2017.<ref>{{Cite web|url=https://www.transport.nsw.gov.au/system/files/media/documents/2017/tfnsw-annual-report-2016-17.pdf|title=Annual Report 2016-17|website=Transport for NSW|accessdate=25 February 2018}}</ref> The 2016-2017 statistic was affected by a partial closure of the line in December 2016/January 2017 for construction works on the CBD and South East Light Rail. | ||
===Incidents=== | ===Incidents=== | ||
Line 126: | Line 122: | ||
===Service expansion constraints=== | ===Service expansion constraints=== | ||
In August 2017 a government report, obtained by the media under freedom of information provisions, revealed patronage was "exceeding all expectations" of transport planners. However it was impossible to introduce more peak hour services, which run every eight minutes. This is because of constraints associated with the single track near Dulwich Hill, stabling capacity, power, signalling, maintenance facilities and fleet size. The power supply limits frequency to six minutes, while the single track terminus at Dulwich Hill and fleet size limit frequency to eight minutes. The report suggested it would be possible to have more services per hour if shuttle services were to run between Central and Lilyfield. Patronage is expected to rise further with 4,700 new dwellings either recently completed or under construction along the line.<ref name="SMHAug17">{{cite news|url=http://www.smh.com.au/nsw/why-trams-on-sydneys-booming-inner-west-light-rail-arent-running-more-often-20170817-gxyf4o.html|title=Why trams on Sydney's booming inner west light rail aren't running more often|date=August 27, 2017|accessdate=29 August 2017|publisher=Sydney Morning Herald}}</ref><ref>{{Cite web|url=https://www.smh.com.au/cqstatic/gy49ao/InnerWestLightRailGIPA.pdf|title=Inner West Light Rail Capacity | In August 2017 a government report, obtained by the media under freedom of information provisions, revealed patronage was "exceeding all expectations" of transport planners. However it was impossible to introduce more peak hour services, which run every eight minutes. This is because of constraints associated with the single track near Dulwich Hill, stabling capacity, power, signalling, maintenance facilities and fleet size. The power supply limits frequency to six minutes, while the single track terminus at Dulwich Hill and fleet size limit frequency to eight minutes. The report suggested it would be possible to have more services per hour if shuttle services were to run between Central and Lilyfield. Patronage is expected to rise further with 4,700 new dwellings either recently completed or under construction along the line.<ref name="SMHAug17">{{cite news|url=http://www.smh.com.au/nsw/why-trams-on-sydneys-booming-inner-west-light-rail-arent-running-more-often-20170817-gxyf4o.html|title=Why trams on Sydney's booming inner west light rail aren't running more often|date=August 27, 2017|accessdate=29 August 2017|publisher=Sydney Morning Herald}}</ref><ref>{{Cite web|url=https://www.smh.com.au/cqstatic/gy49ao/InnerWestLightRailGIPA.pdf|title=Inner West Light Rail Capacity|date=|website=Sydney Morning Herald|archive-url=|archive-date=|dead-url=|accessdate=31 March 2018}}</ref> | ||
Four new trams are likely to be ordered for the Inner West Light Rail due to the unexpectedly strong patronage growth. These will come from one of the existing models (Alstom's Citadis or CAF's Urbos), but, as of July 2019, no decision had been made on which supplier would be chosen. The vehicles are likely to be in operation no earlier than 2021. Addressing the power supply and stabling constraints and providing an additional track at Dulwich Hill is expected to be required to meet demand beyond 2024. There are also suggestions the Citadis trams used on the CBD and South East Light Rail will be deployed on the Inner West line at some point, subject to "contract limitations" being overcome.<ref>{{cite news |last1=O'Sullivan |first1=Matt |title=Extra trams to ease crowding on Sydney's inner west line still years away |url=https://www.smh.com.au/national/nsw/extra-trams-to-ease-crowding-on-sydney-s-inner-west-line-still-years-away-20190620-p51zix.html |accessdate=3 July 2019 |work=The Sydney Morning Herald |date=2 July 2019}}</ref> | |||
===Fleet=== | ===Fleet=== | ||
Line 136: | Line 134: | ||
==Route== | ==Route== | ||
The 23-station route extends for <!--{{convert|-->12.8<!--|-->km<!--|mi}}-->,<ref>{{cite web |url=http://www.transdevsydney.com.au/hop-on-board/the-light-rail-network/ |title=The Light Rail Network - Sydney Fish Markets, The Star Casino, Darling Harbour and Chinatown are all on the list of destinations easily accessible by Sydney Light Rail |publisher=Transdev |date= |accessdate=2014-07-05 |deadurl=yes |archiveurl=https://web.archive.org/web/20131201020209/http://www.transdevsydney.com.au/hop-on-board/the-light-rail-network/ |archivedate=1 December 2013 |df=dmy-all }}</ref><ref name="PEA">{{cite web |url=http://www.transport.nsw.gov.au/sites/default/files/b2b/rail/PEA-SLRE-Inner-West-Extension-July2010.pdf |title=Sydney Light Rail Extension - Stage 1 - Inner West Extension Preliminary Environmental Assessment |publisher=Transport for NSW |date=July 2010 |format=pdf |page=10 |accessdate=2014-07-05}}</ref> including 1.5 kilometres of on-street operation. Apart from Central, Capitol Square and Paddy's Markets, all stops are located on the route of the former railway line (although buildings have been constructed above and around the line in places). Service frequency is approximate, with light rail operating between Central and Dulwich Hill from 06:00 to 23:00, extending to 00:00 on Friday. Standard weekday frequencies are every 8 minutes during peak hours, every 12 minutes between the peaks and every 15 minutes at other times. Services run every 10 to 15 minutes on weekends (with reduced services before 09:00). The section between Central and The Star is open 24 hours a day, with an overnight frequency of 30 minutes.<ref>{{Cite web|url=https://transportnsw.info/travel-info/ways-to-get-around/light-rail/light-rail-services |title=Light rail services |publisher=Transport for NSW |website=transportnsw.info | | The 23-station route extends for <!--{{convert|-->12.8<!--|-->km<!--|mi}}-->,<ref>{{cite web |url=http://www.transdevsydney.com.au/hop-on-board/the-light-rail-network/ |title=The Light Rail Network - Sydney Fish Markets, The Star Casino, Darling Harbour and Chinatown are all on the list of destinations easily accessible by Sydney Light Rail |publisher=Transdev |date= |accessdate=2014-07-05 |deadurl=yes |archiveurl=https://web.archive.org/web/20131201020209/http://www.transdevsydney.com.au/hop-on-board/the-light-rail-network/ |archivedate=1 December 2013 |df=dmy-all }}</ref><ref name="PEA">{{cite web |url=http://www.transport.nsw.gov.au/sites/default/files/b2b/rail/PEA-SLRE-Inner-West-Extension-July2010.pdf |title=Sydney Light Rail Extension - Stage 1 - Inner West Extension Preliminary Environmental Assessment |publisher=Transport for NSW |date=July 2010 |format=pdf |page=10 |accessdate=2014-07-05}}</ref> including 1.5 kilometres of on-street operation. Apart from Central, Capitol Square and Paddy's Markets, all stops are located on the route of the former railway line (although buildings have been constructed above and around the line in places). Service frequency is approximate, with light rail operating between Central and Dulwich Hill from 06:00 to 23:00, extending to 00:00 on Friday. Standard weekday frequencies are every 8 minutes during peak hours, every 12 minutes between the peaks and every 15 minutes at other times. Services run every 10 to 15 minutes on weekends (with reduced services before 09:00). The section between Central and The Star is open 24 hours a day, with an overnight frequency of 30 minutes.<ref>{{Cite web|url=https://transportnsw.info/travel-info/ways-to-get-around/light-rail/light-rail-services |title=Light rail services |publisher=Transport for NSW |website=transportnsw.info |accessdate=2018-03-31}}</ref> | ||
<!--<mapframe width="500" height="400" zoom="13" align="center" frameless> | <!--<mapframe width="500" height="400" zoom="13" align="center" frameless> | ||
[ | [ | ||
Line 152: | Line 150: | ||
</mapframe>--> | </mapframe>--> | ||
===Central=== | ===Central Grand Concourse=== | ||
{{main|Central station (Sydney)}} | {{main|Central station (Sydney)}} | ||
{|class=wikitable style="text-align: center; width: 450px; float:right" | {|class=wikitable style="text-align: center; width: 450px; float:right" | ||
Line 169: | Line 167: | ||
| {{coord|33|52|56|S|151|12|23|E|type:railwaystation_region:AU-NSW|display=inline}}--> | | {{coord|33|52|56|S|151|12|23|E|type:railwaystation_region:AU-NSW|display=inline}}--> | ||
|} | |} | ||
'''Central''' is the eastern terminus of the line. It serves Central railway station and is located on the first floor, parallel to, but above, [[wikipedia:Eddy Avenue|Eddy Avenue]]. The stop connects to the Grand Concourse, Central station's main waiting area and the departure hall for medium and long distance train services. | '''Central Grand Concourse''' is the eastern terminus of the line. It serves Central railway station and is located on the first floor, parallel to, but above, [[wikipedia:Eddy Avenue|Eddy Avenue]]. The stop connects to the Grand Concourse, Central station's main waiting area and the departure hall for medium and long distance train services. Originally known simply as Central, the stop became known as Central Grand Concourse once the CBD and South East Light Rail opened. This was done to distinguish the existing stop from the nearby Central Chalmers Street stop on the new line.<ref>{{Cite web |url=http://data.sydneylightrail.transport.nsw.gov.au/s3fs-public/Name%20Recommendations%20Pack%20-%20CBD%20and%20South%20East%20Light%20Rail.pdf |title=Name recommendations pack City and South East Light Rail (CSELR) |date=8 August 2017 |publisher=Transport for NSW |pages=13–14}}</ref> | ||
The stop is located at the midpoint of a single track unidirectional turning loop around [[wikipedia:Belmore Park|Belmore Park]]. The stop consists of two platforms. Trams stop at the first platform to allow passengers to alight, then pull up to the second platform to allow boarding. The use of the loop avoids having to terminate the vehicles and the removes the need for the driver to change ends. This loop was not new; it had been used until 1957 as a route on the [[Trams in Sydney|former Sydney tramway system]], but in the opposite direction. The covered area in which the light rail stop is located was previously used as a staff car-park and bus interchange.<!--<br /> | The stop is located at the midpoint of a single track unidirectional turning loop around [[wikipedia:Belmore Park|Belmore Park]]. The stop consists of two platforms. Trams stop at the first platform to allow passengers to alight, then pull up to the second platform to allow boarding. The use of the loop avoids having to terminate the vehicles and the removes the need for the driver to change ends. This loop was not new; it had been used until 1957 as a route on the [[Trams in Sydney|former Sydney tramway system]], but in the opposite direction. The covered area in which the light rail stop is located was previously used as a staff car-park and bus interchange.<!--<br /> | ||
Line 185: | Line 183: | ||
! Transfer | ! Transfer | ||
|- | |- | ||
| | | [[Chinatown light rail stop]] | ||
<!--|- | <!--|- | ||
! Location | ! Location | ||
Line 191: | Line 189: | ||
| {{coord|33|52|47.2|S|151|12|20.2|E|type:railwaystation_region:AU-NSW|display=inline}}--> | | {{coord|33|52|47.2|S|151|12|20.2|E|type:railwaystation_region:AU-NSW|display=inline}}--> | ||
|} | |} | ||
'''Capitol Square''' is opposite the [[wikipedia:Capitol Theatre, Sydney|Capitol Theatre]], a large theatre for long-stay, popular shows such as The Lion King. The stop is located on Hay Street, near the intersection with [[wikipedia:George Street, Sydney|George Street]]. Hay Street is closed to all other traffic. The [[CBD and South East Light Rail]] | '''Capitol Square''' is opposite the [[wikipedia:Capitol Theatre, Sydney|Capitol Theatre]], a large theatre for long-stay, popular shows such as The Lion King. The stop is located on Hay Street, near the intersection with [[wikipedia:George Street, Sydney|George Street]]. Hay Street is closed to all other traffic. The [[CBD and South East Light Rail]] runs along George Street, creating a junction at the intersection. A connection between the two lines enables trams used on CBD & South East line to access a maintenance facility at Lilyfield. | ||
{{clear}} | {{clear}} | ||
Latest revision as of 23:43, 19 December 2019
Ownership and operation | |
---|---|
Controlling authority | Transport for NSW |
Operator(s) | Transdev Sydney |
Annual patronage | 10.3 million (2017-18) |
Technical | |
Number of stops | 23 |
Number of vehicles | 12 |
The Inner West Light Rail is a light rail line in Sydney, New South Wales, Australia running from Central railway station through the Inner West to Dulwich Hill. The 23-stop, 12.8-kilometre route was the the first line to open on the Sydney light rail network. Services on the line are branded as the L1 Dulwich Hill Line.
Most of the line is built on the path of the former Metropolitan Goods railway line. The line opened in 1997 and was extended in 2000 and 2014. Operation and maintenance of the line is contracted to the ALTRAC Light Rail consortium by the New South Wales Government's transport authority, Transport for NSW. Services are operated by Transdev Sydney as a member of ALTRAC Light Rail.
Background
- F1 Manly
- F2 Taronga Zoo
- F3 Parramatta River
- F4 Cross Harbour
- F5 Neutral Bay
- F6 Mosman Bay
- F7 Double Bay
- F8 Cockatoo Island
Most of the alignment of the Dulwich Hill Line had its origins as the Metropolitan Goods railway line. From the time when the Sydney Railway Company was formed in 1848, it had been the intention of the company to build a freight terminal at Darling Harbour. To this end, a railway line was constructed between the Sydney railway station (the predecessor to Central railway station) and Darling Harbour, which opened on 26 September 1855.[1] This line was extended to Dulwich Hill via Lilyfield in 1922.[2] A short branch from Lilyfield to Rozelle served another freight terminal.
With widespread use as a freight line throughout the early 20th century, the use of containers and the decentralisation of freight terminals in Sydney to places such as Port Botany and Chullora, Darling Harbour traffic was reduced considerably. The port closed and the area was redeveloped in the 1980s.
Construction
Construction and conversion of the first section of line from Central station to Wentworth Park started on 25 January 1996 and took 16 months to complete.[3][4] The 3.6km line reused the former Darling Harbour goods railway line and the tram loop at Central station originally built for Sydney's former tram network, with a new section of track built along Hay Street to connect the two.
The original route opened for public operation with a limited 09:00 to 17:00 service on 11 August 1997 with three weeks of testing.[5][6] The official opening was on 31 August 1997.[5][7]
Buoyed by the success of the original line, a 3.6-kilometre, four stop extension of the route opened on 13 August 2000.[6][8] This saw the light rail reach Lilyfield, which was then the limit of the closed section of the goods line.
Extension to Dulwich Hill
In 2009 goods traffic on the line between Rozelle and Dulwich Hill ceased and in February 2010 the Keneally Government announced a 5.6km extension of the light rail from Lilyfield to Dulwich Hill.[9]
Work to upgrade the track and remove the overhead wiring began in August 2010.[10] The project received planning approval in February 2011.[11] The extension was originally scheduled to open in 2012, but in September 2011 the newly elected O'Farrell Government announced that it would not open until 2014, and that the cost had risen from $120 million to $176 million. The Greenway walking and cycling path which was to run alongside much of the route was deferred. The new government blamed hasty planning by their predecessor for the delay and cost overruns, and the lack of an active transport masterplan for the deferral of the Greenway.[12]
John Holland Group was announced as the successful tenderer for the infrastructure works on 31 May 2012, covering the design and construction of the nine stations, bridge works, signalling and power supply.[13][14] The extension opened on 27 March 2014.[15]
Connection to the CBD and South East Light Rail
The line was closed between Central and Convention in January 2017 to allow for construction work at the George and Hay Street intersection as part of the CBD and South East Light Rail project.[16] A further closure was required in January 2018 to install a junction between the two lines.[17] The connection is used by trams of the CBD and South East line to access a maintenance facility at Lilyfield.
Ownership & operation
The line was owned by the Sydney Light Rail Company (SLRC) when it opened in 1997. The company was formed in March 1994 was awarded a 30-year concession to operate the light rail system until February 2028 when ownership would pass to the New South Wales Government.[18][5] The service was initially operated by TNT Transit Systems.
In August 1998, SLRC formed a joint venture with CGEA Transport named CGEA Transport Sydney to purchase TNT Transit Systems, who also owned the Sydney Monorail. This resulted in CGEA Transport taking charge of light rail operations. SLRC later combined with CGEA Transport Sydney to become Metro Transport Sydney in 2001, after Connex (renamed from CGEA Transport) sold its share in CGEA Transport Sydney.[19] Connex continued to operate the light rail network. Connex eventually came to be known as Veolia Transport globally in 2005, then became part of Veolia Transdev in 2011.[20]
Metro Transport Sydney was purchased by the New South Wales Government in March 2012.[21][22] Veolia Transdev (later just Transdev) remained the operator, operating as Transdev Sydney.
In February 2014, three consortia were short listed to build and operate the CBD and South East Light Rail. The contract also included the right to the operate the L1 Dulwich Hill Line. The three short listed operators were Keolis (iLinQ consortium), Serco (SydneyConnect consortium) and Transdev (Connecting Sydney consortium).[23][24] In December 2014, the Connecting Sydney consortium (which was renamed ALTRAC Light Rail) was awarded the contract, meaning Transdev retains the right to operate the Dulwich Hill Line. The new contract began in July 2015 and runs until 2034.[25][26][27]
Ticketing
When it first opened, the line used its own paper-based ticketing system that was separate from the semi-integrated ticketing systems used by the government owned operators. The light rail operated on a proof-of-payment system, with ticket vending machines provided at all stops. By the time the Lilyfield extension opened, the machines had been switched off and replaced with onboard conductors. Paper tickets were available in single or return with fares based on two zones. Other products available included flat fare day and weekly tickets, some of which also included travel on the monorail prior to that system's closure.
Several tickets were recognised on the light rail but were not sold onboard. A "TramLink" ticket which allowed travel on Greater Sydney train services and the light rail was available from railway stations.[28] From 27 June 2011, all MyMultis, the Pensioner Excursion Ticket and Family Funday Sunday were also recognised.[29] This improved integration with the broader Sydney ticketing system led to a 30% to 40% increase in patronage on the line in the first months after introduction.[30] In 2012-13 these products comprised just over half of all tickets used on light rail services.[31]
The smartcard-based Opal ticketing system was introduced to the line on 1 December 2014. Patronage increased in the months following the introduction of Opal.[32] Most paper tickets sold or recognised on light rail services were discontinued on 1 January 2016. The only tickets still available were single and return tickets.[33] These last remaining tickets were replaced by Opal-based single trip tickets on 1 August of that year.[34]
Naming
As the original line of Sydney's light rail network, the L1 Dulwich Hill Line lacked special branding and was simply known as the Sydney Light Rail - and later Metro Light Rail after the system was re-branded. Following the purchase of Metro Transport Sydney by the New South Wales Government and the announcement of the CBD and South East Light Rail, the line was named Inner West Light Rail. Since the opening of the 2014 extension to Dulwich Hill, passenger-facing branding of the line has referred to it as the L1 Dulwich Hill Line. The line was given the number L1 as part of a broader program to also number all Sydney Trains and Sydney Ferries routes.
Patronage
A transport plan released by the New South Wales Government in 1998 reported that the line carried an average of 5,000 passengers on weekdays.[35] 2.8 million journeys were made in 2009-10, increasing to 4.2 million in 2012-13. The partial integration of the line into the broader Sydney ticketing system was a major driver of the increase.[31][36] In the 12 months to June 2015, the line carried 6.1 million passengers, compared to 3.9 million passengers in the prior year. The increase in the 2014-15 figure was influenced by the opening of the extension to Dulwich Hill in March 2014, while the 2013-14 figure was affected by the suspension of services for much of October 2013 and closures for maintenance works.[37][38] In the period from 2015-2016, 9.7 million journeys were made,[39] followed by 9.1 million in 2016-2017.[40] The 2016-2017 statistic was affected by a partial closure of the line in December 2016/January 2017 for construction works on the CBD and South East Light Rail.
Incidents
The line operated without serious incident until 7 October 2013, when two trams derailed within the space of 20 minutes. Sections of track were replaced in September and it is thought the new track damaged the wheels of the vehicles.[41][42] All services were suspended and replaced by buses. Services resumed between The Star and Lilyfield on 18 October, and along the full length of the line on 30 October.[43][44]
Service expansion constraints
In August 2017 a government report, obtained by the media under freedom of information provisions, revealed patronage was "exceeding all expectations" of transport planners. However it was impossible to introduce more peak hour services, which run every eight minutes. This is because of constraints associated with the single track near Dulwich Hill, stabling capacity, power, signalling, maintenance facilities and fleet size. The power supply limits frequency to six minutes, while the single track terminus at Dulwich Hill and fleet size limit frequency to eight minutes. The report suggested it would be possible to have more services per hour if shuttle services were to run between Central and Lilyfield. Patronage is expected to rise further with 4,700 new dwellings either recently completed or under construction along the line.[45][46]
Four new trams are likely to be ordered for the Inner West Light Rail due to the unexpectedly strong patronage growth. These will come from one of the existing models (Alstom's Citadis or CAF's Urbos), but, as of July 2019, no decision had been made on which supplier would be chosen. The vehicles are likely to be in operation no earlier than 2021. Addressing the power supply and stabling constraints and providing an additional track at Dulwich Hill is expected to be required to meet demand beyond 2024. There are also suggestions the Citadis trams used on the CBD and South East Light Rail will be deployed on the Inner West line at some point, subject to "contract limitations" being overcome.[47]
Fleet
The line is currently operated by a fleet of twelve Spanish-built Urbos 3 vehicles, which have a standard capacity of 206 passengers and a crush capacity of 272. The first Urbos 3s entered service in July 2014, with the final vehicle delivered by the end of June 2015.
When the line first opened, a fleet of seven German-designed Variotrams were built in Melbourne by Adtranz to operate the services. The last Variotram was withdrawn in May 2015. Between the opening of the Dulwich Hill extension in March 2014 and the introduction of the first Urbos 3s, the Variotrams were supplemented by four leased Urbos 2 vehicles.
Route
The 23-station route extends for 12.8km,[48][49] including 1.5 kilometres of on-street operation. Apart from Central, Capitol Square and Paddy's Markets, all stops are located on the route of the former railway line (although buildings have been constructed above and around the line in places). Service frequency is approximate, with light rail operating between Central and Dulwich Hill from 06:00 to 23:00, extending to 00:00 on Friday. Standard weekday frequencies are every 8 minutes during peak hours, every 12 minutes between the peaks and every 15 minutes at other times. Services run every 10 to 15 minutes on weekends (with reduced services before 09:00). The section between Central and The Star is open 24 hours a day, with an overnight frequency of 30 minutes.[50]
Central Grand Concourse
Opened |
---|
1997 |
Transfer |
Central railway station Railway Square, Eddy Avenue & Elizabeth Street bus routes |
Central Grand Concourse is the eastern terminus of the line. It serves Central railway station and is located on the first floor, parallel to, but above, Eddy Avenue. The stop connects to the Grand Concourse, Central station's main waiting area and the departure hall for medium and long distance train services. Originally known simply as Central, the stop became known as Central Grand Concourse once the CBD and South East Light Rail opened. This was done to distinguish the existing stop from the nearby Central Chalmers Street stop on the new line.[51]
The stop is located at the midpoint of a single track unidirectional turning loop around Belmore Park. The stop consists of two platforms. Trams stop at the first platform to allow passengers to alight, then pull up to the second platform to allow boarding. The use of the loop avoids having to terminate the vehicles and the removes the need for the driver to change ends. This loop was not new; it had been used until 1957 as a route on the former Sydney tramway system, but in the opposite direction. The covered area in which the light rail stop is located was previously used as a staff car-park and bus interchange.
Capitol Square
Opened |
---|
1997 |
Transfer |
Chinatown light rail stop |
Capitol Square is opposite the Capitol Theatre, a large theatre for long-stay, popular shows such as The Lion King. The stop is located on Hay Street, near the intersection with George Street. Hay Street is closed to all other traffic. The CBD and South East Light Rail runs along George Street, creating a junction at the intersection. A connection between the two lines enables trams used on CBD & South East line to access a maintenance facility at Lilyfield.
Paddy's Markets
Opened |
---|
1997 |
Transfer |
None |
Paddy's Markets (formerly Haymarket) is located outside the flea market type Paddy's Markets in Haymarket. The name also belonged to a stop on the former Sydney Monorail. The monorail stop was located to the west of the light rail stop and was originally called Powerhouse Museum. It was connected to a multi-storey car park, with a footbridge across Darling Drive and the light rail providing access to the Powerhouse Museum and the suburb of Ultimo. In 2005, both stops were renamed Paddy's Markets in a naming rights deal.[52]
The area to the north of the light rail stop forms part of a major redevelopment of the Darling Harbour precinct. Prior to redevelopment, a public square existed between the stop and the Sydney Entertainment Centre - a former multi-purpose events venue. The redevelopment plans included the demolition of the Entertainment Centre, car park and monorail stop, and the creation of a 'creative quarter' named Darling Square featuring retail outlets, offices and apartments.[53] The public square adjacent to the light rail stop will be replaced with a new square further to the north. A pedestrian boulevard was constructed through the site of the Entertainment Centre, providing improved access from the stop to Darling Harbour. To prepare for the redevelopment, the monorail closed in June 2013 and demolition of the site commenced in December 2014.[54] The Entertainment Centre was replaced by the ICC Sydney Theatre, located near the Exhibition Centre stop.
To the west of the stop, the light rail crosses Darling Drive and joins the former freight railway corridor. The section of the corridor not being used by the light rail has been converted to a pedestrian pathway, dubbed The Goods Line.[55][56]
Exhibition Centre
Opened |
---|
1997 |
Transfer |
None |
Exhibition Centre serves the suburb of Ultimo and the Darling Harbour precinct. The stop is located between two streets - Darling Drive to the east and Pyrmont Street to the west. It is named after the former Sydney Exhibition Centre - a complex for holding expositions and trade fairs that was located on the opposite side of Darling Drive. A replacement facility on the same site - the International Convention Centre Sydney - was completed in 2016. The stop is now adjacent to the ICC's exhibition precinct and the ICC Sydney Theatre. The Ian Thorpe Aquatic and Fitness Centre is located on the opposite side of Pyrmont Street. The Powerhouse Museum is also nearby. The former Sydney Monorail ran parallel to the light rail next to the stop.
Convention
Opened |
---|
1997 |
Transfer |
None |
Convention is located adjacent to Darling Drive, at the western edge of the Darling Harbour precinct. The stop is named after the former Sydney Convention Centre and its replacement, the International Convention Centre Sydney. There are hotels located on both sides of the stop. The convention precinct of the ICC complex and the Harbourside Shopping Centre are also located adjacent to the stop.
A monorail stop with the same name was located a few metres down Darling Drive towards Central. The monorail closed in June 2013.
Pyrmont Bay
Opened |
---|
1997 |
Transfer |
Pyrmont Bay ferry wharf 389 bus route |
Pyrmont Bay is located underneath an apartment building in Pyrmont. The stop services the north western side of the Darling Harbour precinct. It is close to the Australian National Maritime Museum and the Harbourside Shopping Centre. The nearby Pyrmont Bridge provides access to the city.
The Star
Opened |
---|
1997 |
Transfer |
389 bus route |
The Star (formerly Star City) is the primary means of public transport serving The Star casino and entertainment complex, in Pyrmont. The stop is located underneath the casino alongside a bus and coach stop. It also services commercial offices located in the area. Between 00:00 and 06:00, services from Central terminate at The Star.
John Street Square
Opened |
---|
1997 |
Transfer |
389 bus route |
John St Square serves the northern end of the Pyrmont peninsula. The stop is located in a cutting which has been partly built over by apartments as part of the conversion process from goods railway to light rail. Since the mid-1990s, the area has been extensively redeveloped with medium density housing and offices.
Fish Market
Opened |
---|
1997 |
Transfer |
501 bus route |
Fish Market is located in a cutting, adjacent to the Western Distributor in Pyrmont. It serves a mixed employment and medium density residential area, and the nearby Sydney Fish Market. A redevelopment of the fish market was announced in November 2016. The market will move from its current location to an adjacent site that will put it closer to the Wentworth Park stop.[57]
Wentworth Park
Opened |
---|
1997 |
Transfer |
None |
Wentworth Park serves a residential area in Pyrmont. Access is available from Wattle Street, Bridge Road and Jones Street. The stop is named after the park on the opposite side of Wattle Street and the Wentworth Park greyhound racing track, located within the park.
The stop opened with a single platform in 1997 when it was the original terminus of the line. When the light rail was extended to Lilyfield in August 2000, a new platform for Lilyfield bound services was opened. A crossover remains just past the city end of the stop. To the west of the stop, a viaduct carries the light rail over Wentworth Park.
Glebe
Opened |
---|
2000 |
Transfer |
None |
Glebe is located near the shopping area in Glebe and serves the eastern side of the suburb. A footbridge over Bridge Road connects to the outbound platform. Immediately to the west of the stop is the portal for a tunnel under the suburb of Glebe.
Jubilee Park
Opened |
---|
2000 |
Transfer |
None |
Jubilee Park is located adjacent to Jubilee Park on the western side of Glebe. It serves a residential area. Immediately to the east of the stop is the portal for a tunnel under the suburb of Glebe, and to the west is a viaduct crossing the park and Johnstons Creek. It is situated adjacent to the Rozelle Depot of Sydney's former tram network. After tram services ceased the depot became part of the Harold Park Paceway harness racing complex. The paceway closed in 2010 and was redeveloped into medium density housing. The depot was turned into a food-centric retail complex that opened in September 2016, leading to an increase of patronage at the stop.[58][59]
Rozelle Bay
Opened |
---|
2000 |
Transfer |
433 bus route |
Rozelle Bay serves a residential area in the north of Annandale. It is on the edge of an embankment adjacent to its namesake bay. Access is via a walkway and steps from The Crescent below or level access from Bayview Crescent.
Lilyfield
Opened |
---|
2000 |
Transfer |
447 & 470 bus routes |
Lilyfield serves a residential area in Lilyfield. The stop is located at the edge of a wide cutting, beneath the City West Link road which passes overhead. It is the only station on the line to be built as an island platform. The entrance is on Catherine Street, with access to the platform either by stairs or a lift. The stop was the terminus of the line between 2000 and 2014.
During the corridor's time as a freight railway line, a junction between the Darling Harbour and Rozelle branches of the line was located to the west of the stop, with the stop located on what was the Darling Harbour branch. The junction also marked the western edge of Rozelle railway yard, which accounts for the width of the cutting.
Originally, only the stop's citybound platform was used. A set of points was located past the city end of the stop, allowing the outbound track to merge with the citybound track. There was no track adjacent to the outbound platform and the platform face was fenced off.
As part of the extension to Dulwich Hill, a stabling facility for four trams was built in the cutting, to the west of the stop.[60] The track configuration through the stop was also redesigned. In November 2013, the outbound platform was brought into use and the points at the city end were removed. A new crossover past the outbound end of the stop was installed to enable terminating trams to switch tracks and to provide access to the stabling facility.
Leichhardt North
Opened |
---|
2014 |
Transfer |
440 & 445 bus routes |
Leichhardt North is located parallel to the City West Link Road, serving a residential area in Leichhardt. The platforms are not located opposite one another, but are staggered, with the track crossing located between the platforms. There are entrances at either end of the stop. The outbound platform connects to the City West Link / James Street intersection. The citybound platform connects to a pathway that leads to either the southern or northern parts of Charles Street - the latter via a bridge over the City West Link. Immediately to the east of the stop, the light rail passes through a tunnel under the City West Link. Leichhardt Oval is a short walk from the station.
Hawthorne
Opened |
---|
2014 |
Transfer |
None |
Hawthorne is located at the border of Leichhardt and Haberfield. The stop's name is a reference to the Hawthorne Canal which runs parallel to the line through this area. The stop is also located close to the Hawthorne Canal Reserve and Hawthorne Parade.
The platforms are not located opposite one another, but are staggered, with the track crossing located between the platforms. The stop is located in a residential area, but adjacent to parkland on both the Leichhardt and Haberfield sides. Pathways were built between the closest streets - Hawthorne Parade in Haberfield and Darley Road in Leichhardt - including a bridge over the canal. This improved pedestrian access between the two suburbs which had been limited by the railway.
In the 2014 extension's design phase, the location of the stop was moved 80 metres south and the bridge was moved 160 metres south to avoid an off-leash dog area in Hawthorne Canal Reserve.[61]
Marion
Opened |
---|
2014 |
Transfer |
436, L37, 438/L38 & 439/L39 bus routes |
Marion is located on an embankment adjacent to Marion Street and Hawthorne Parade at the border of Leichhardt and Haberfield. The MarketPlace Leichhardt shopping centre is a short walk from the stop, along Marion Street.
Taverners Hill
Opened |
---|
2014 |
Transfer |
461, 480 & 483 bus routes |
Taverners Hill is located on an embankment adjacent to Parramatta Road and the Hawthorne Canal at the border of Lewisham, Summer Hill, Haberfield and Leichhardt. The platforms are not located opposite one another, but are staggered, with the track crossing located between the platforms. A footbridge to the south of the stop over Parramatta Road connects to the citybound platform. Taverners Hill is a well known locality name for the area to the east of the stop extending up Parramatta Road to Norton Street.[62] A long-term plan exists for urban renewal and higher density development around the stop.[63]
Lewisham West
Opened |
---|
2014 |
Transfer |
Lewisham railway station 413 bus route |
Lewisham West is located on the border of Lewisham and Summer Hill. The platforms are not located opposite one another, but are staggered, with the track crossing located between the platforms. A crossover is located at the city end of the stop. Access to the stop from the Summer Hill side is via a park on the grounds of the former Mungo Scott flour mill.
The stop sits in an medium density residential area which was subject to urban renewal soon after the stop opened. The area on the Lewisham side of the stop featured various light industrial buildings. The Summer Hill side of the stop is dominated by the former flour mill complex, which underwent redevelopment. The mill provided the final traffic for the freight railway line, and the cessation of traffic after the mill's closure provided the catalyst for conversion of the line to light rail. The stop is located adjacent to the flour mill, within walking distance of Lewisham railway station on the T2 Inner West & Leppington Line. The 2014 extension's Product Definition Report describes the positioning of the stop:
The site provides the most practical balance between meeting the interchange opportunity with Lewisham Station and the opportunities of the catchment and its two known developments.
Patronage at this location is currently predicted to come approximately equally from walk-up catchment and from interchange. Future redevelopment will see this balance tip significantly in favour of catchment with the stop potentially becoming a focus of the local area.[64]
Access to the city is quickest via the heavy rail line, but the light rail provides north-south transport, in contrast to the heavy rail's east-west route.
Waratah Mills
Opened |
---|
2014 |
Transfer |
None |
Waratah Mills serves a residential area in the northern part of Dulwich Hill. The stop's name is a reference to the former Waratah Mills flour mill located on the opposite side of Davis Street.[62] The mill has been converted to apartments and is a local landmark.
Arlington
Opened |
---|
2014 |
Transfer |
None |
Arlington is located adjacent to Constitution Road and Johnson Park in Dulwich Hill. It serves a medium density residential area. The stop's name is a reference to the nearby Arlington Recreation Ground (Oval) - a local sports venue on the opposite side of Johnson Park.[62]
Dulwich Grove
Opened |
---|
2014 |
Transfer |
418, 428/L28 & 445 bus routes |
Dulwich Grove is located in a cutting between New Canterbury Road and Hercules Street in Dulwich Hill. Dulwich Grove was the name of one of the area’s two earliest land releases and first use of the name Dulwich.[62]
The original design provided access to the stop from both Hercules Street and New Canterbury Road. The access from Hercules Street was subsequently removed from the design with a pathway provided to New Canterbury Road in its place.[65]
Dulwich Hill
Opened |
---|
2014 |
Transfer |
Dulwich Hill railway station 412 bus route |
Dulwich Hill (known as Dulwich Hill Interchange during planning and construction) is located in the southern part of the suburb of Dulwich Hill, adjacent to Dulwich Hill railway station on the T3 Bankstown Line. The stop sits at the end of Bedford Crescent, where the Rozelle branch line joined the main Metropolitan Goods railway line and is thus the terminus of the light rail.
In the 2014 extension's Environmental Assessment the stop was proposed to be located parallel to the railway station with direct access from Wardell Road. This was to have been achieved by widening the cutting used by the railway lines and removing angle parking on Bedford Crescent. It was proposed to construct an island platform with two tracks.
The design was altered after a review favoured moving the stop to the end of Bedford Crescent.[66][67] This final design includes a single side platform and is further away from the railway station than the original proposal, but includes a connection to Jack Shanahan Park on the western side of the light rail alignment, which improved access to the park from the east and access to the stop from the west. Other improvements cited were reduced construction cost and environmental impact due to the elimination of the extensive work required to widen the cutting under the original proposal, and the reduced need to interface with assets in the active rail corridor.[68]
The quickest access to the city is via the heavy rail line. The light rail runs to the north, in contrast to the heavy rail's east-west route.
References
- ↑ Forsyth, J.H. (ed.) (1988-93), Stations & Tracks; Vol. 1: "Main Suburban & Branches -- Illawarra & Branches". State Rail Authority of New South Wales: Sydney, p. 97.
- ↑ Bozier, Rolfe. "Rozelle - Darling Harbour Goods Line". NSWrail. http://www.nswrail.net/lines/show.php?name=NSW:wardell_road_central. Retrieved 18 May 2007.
- ↑ "Sydney Light Rail Construction and Extension". Railway Technology. http://www.railway-technology.com/projects/sydney/.
- ↑ "Sydney Light Rail Construction Commences" Railway Digest March 1996 page 6
- ↑ 5.0 5.1 5.2 "Sydney's new light rail system" Railway Digest September 1997 page 14
- ↑ 6.0 6.1 Geier, Matthew. "Sydney Light Rail". http://www.sleeper.apana.org.au/railway/slr/.
- ↑ Geier, Matthew. "Sydney Light Rail's Official Opening". http://www.sleeper.apana.org.au/railway/slr/official-opening.html.
- ↑ "Sydney's Tram Extension Opens" Railway Digest September 2000 page 4
- ↑ "Inner West Light rail extension now complete". Transport for NSW. 27 March 2014. Archived from the original on 27 March 2014. https://web.archive.org/web/20140327044022/http://www.transportnsw.info/en/transport-status/news/2014/light-rail-extension.page.
- ↑ "Community Update: Light Rail Extension - Inner West. Lilyfield to Dulwich Hill - July/August 2010" Transport NSW
- ↑ "Sydney Light Rail Program". Transport for NSW. http://www.transport.nsw.gov.au/lightrail-program.
- ↑ Berejiklian, Gladys (6 September 2011). "Inner West light rail extension to proceed as Greenway is deferred" (Press release). Minister for Transport. http://www.greenway.org.au/files/DoT%20defers%20GreenWay.pdf.
- ↑ "Getting on with the job: Contract awarded for construction of Inner West Light Rail Extension". Transport for NSW. http://www.transport.nsw.gov.au/media-releases/getting-job-contract-awarded-construction-inner-west-light-rail-extension. Retrieved 1 June 2012.
- ↑ "John Holland awarded Sydney light rail extension contract". Railway Gazette International. 7 June 2012. http://www.railwaygazette.com/news/single-view/view/john-holland-awarded-sydney-light-rail-extension-contract.html.
- ↑ Inner West Light rail extension now complete Template:Webarchive Transport for NSW 27 March 2014
- ↑ "Alerts for L1 Dulwich Hill - Buses replace light rail between Central and The Star". Transport for NSW. Archived from the original on 27 December 2016. https://web.archive.org/web/20161227015952/http://www.transportnsw.info/en/transport-status/alerts-route.page?routeNum=L1&routeDesc=Dulwich+Hill&mot=LightRail. Retrieved 8 January 2017.
- ↑ "Light rail network closures due to trackwork: buses replace light rail throughout January". Transdev Sydney. 21 December 2017. Archived from the original on 28 January 2018. https://web.archive.org/web/20180128061703/http://www.transdevsydney.com.au/index.php?mact=NewsManager,cntnt01,frontend_article_details,0&cntnt01article_id=62&cntnt01returnid=21. Retrieved 28 January 2018.
- ↑ Sydney Light Rail Extension Stage 1 Inner West Extension Transport NSW July 2010
- ↑ "Overview of Connex Worldwide and in Australia". Metro Light Rail. Archived on 25 April 2003. Template:Citation error. http://www.metrolightrail.com.au:80/about/company.html. Retrieved 1 February 2018.
- ↑ "Light rail in Sydney". Transdev. http://www.transdev.com.au/business-activity/our-operations/light-rail-in-sydney/. Retrieved 14 July 2016.
- ↑ Australian Infrastructure Fund sells Metro Transport stake The Australian 23 March 2012
- ↑ AIX divests its 38.9 percent interest in Metro Transport Sydney Australian Infrastructure Fund 23 March 2012
- ↑ Tender out to deliver and operate Sydney's Light Rail Network Transport for NSW 7 March 2014
- ↑ Three shortlisted for Sydney light rail PPP International Railway Journal 20 February 2014
- ↑ Delivering an integrated light rail system: ALTRAC takes over operation of inner west light rail Transport for NSW 2 July 2015
- ↑ "CBD and South East Light Rail contract awarded with earlier delivery date". Transport for NSW. 18 December 2014. http://www.transport.nsw.gov.au/media-releases/cbd-and-south-east-light-rail-contract-awarded-earlier-delivery-date.
- ↑ "Transdev consortium achieves financial close on Sydney Light Rail PPP" (Press release). Transdev. 25 February 2015. http://www.transdevsydney.com.au/index.php?mact=NewsManager,cntnt01,frontend_article_details,0&cntnt01article_id=43&cntnt01returnid=101. Retrieved 5 April 2015.
- ↑ "Light rail". Transport Info. http://www.131500.com.au/tickets/fares/mytram-light-rail. Retrieved 2 July 2013.
- ↑ Berejiklian, Gladys (14 June 2011). "Pensioners, families big winners in light rail ticket changes" (Press release). Minister for Transport. http://www.transport.nsw.gov.au/media-releases/pensioners-families-big-winners-light-rail-ticket-changes.
- ↑ Saulwick, Jacob (23 March 2012). "'Once-in-a-generation' opportunity to fix transport". The Sydney Morning Herald. http://www.smh.com.au/nsw/onceinageneration-opportunity-to-fix-transport-20120323-1vnss.html.
- ↑ 31.0 31.1 "Transport for NSW Annual Report 2012-13". Transport for NSW. pp. 52, 361. http://www.transport.nsw.gov.au/sites/default/files/b2b/publications/annual_reports/tfnsw-annual-report-2013.pdf. Retrieved 14 July 2016.
- ↑ "Inner West Light Rail extension celebrates first year as new light rail vehicles go into operation" (Press release). Gladys Berejiklian. 27 March 2015. http://www.gladys.com.au/content/inner-west-light-rail-extension-celebrates-first-year-new-light-rail-vehicles-go-operation. Retrieved 5 April 2015.
- ↑ "Most paper tickets no longer sold from 1 January 2016". Transport for NSW. Archived from the original on 6 August 2015. https://web.archive.org/web/20150806230101/http://www.transportnsw.info/sites/en/transport-status/news/2015/ticket-retirement-0116.page. Retrieved 13 August 2015.
- ↑ "The last paper tickets to be wrapped up on August 1". Transport for NSW. 4 July 2016. http://www.transport.nsw.gov.au/media-releases/last-paper-tickets-be-wrapped-august-1.
- ↑ Action for Transport 2010: an integrated transport plan for Sydney. New South Wales Government. 1998. p. 6.
- ↑ Saulwick, Jacob (29 September 2011). "Monofail, and only government assistance has put trams back on track". The Sydney Morning Herald. http://www.smh.com.au/nsw/monofail-and-only-government-assistance-has-put-trams-back-on-track-20110928-1kxgo.html.
- ↑ "5. Service Delivery - Volume Six 2015 Transport". Audit Office of New South Wales. 19 November 2015. http://www.audit.nsw.gov.au/publications/latest-reports/financial/volume-six-2015-transport/service-delivery/5-service-delivery. Retrieved 25 November 2015. "Light rail patronage increased from 3.9 million passengers in 2013-14 to 6.1 million in 2014-15."
- ↑ Annual Report for year ended 30 June 2014 Transport for NSW page 45
- ↑ "Tableau Public". https://public.tableau.com/profile/bureau.of.transport.statistics#!/vizhome/PTVisualisations-LightRail2_7_2Nov16/Welcome. Retrieved 2017-08-01.
- ↑ "Annual Report 2016-17". https://www.transport.nsw.gov.au/system/files/media/documents/2017/tfnsw-annual-report-2016-17.pdf. Retrieved 25 February 2018.
- ↑ Saulwick, Jacob (8 October 2013). "Light rail suspended after double derailing". The Sydney Morning Herald. http://www.smh.com.au/nsw/light-rail-suspended-after-double-derailing-20131008-2v5hn.html. Retrieved 15 October 2013.
- ↑ Saulwick, Jacob (15 October 2013). "New track blamed for derailing trams". The Sydney Morning Herald. http://www.smh.com.au/nsw/new-track-blamed-for-derailing-trams-20131014-2vixg.html#ixzz2hkAtBByP. Retrieved 15 October 2013.
- ↑ "Sydney Light Rail: Services Partially Restored from Tomorrow". Transdev Sydney. 17 October 2013. http://www.transdevsydney.com.au/index.php?mact=NewsManager,cntnt01,frontend_article_details,0&cntnt01article_id=24&cntnt01returnid=101.
- ↑ Saulwick, Jacob (30 October 2013). "Light rail resumes after weeks of suspension". The Sydney Morning Herald. http://www.smh.com.au/nsw/light-rail-resumes-after-weeks-of-suspension-20131030-2wfyi.html. Retrieved 30 October 2013.
- ↑ "Why trams on Sydney's booming inner west light rail aren't running more often". Sydney Morning Herald. August 27, 2017. http://www.smh.com.au/nsw/why-trams-on-sydneys-booming-inner-west-light-rail-arent-running-more-often-20170817-gxyf4o.html. Retrieved 29 August 2017.
- ↑ "Inner West Light Rail Capacity". https://www.smh.com.au/cqstatic/gy49ao/InnerWestLightRailGIPA.pdf. Retrieved 31 March 2018.
- ↑ O'Sullivan, Matt (2 July 2019). "Extra trams to ease crowding on Sydney's inner west line still years away". The Sydney Morning Herald. https://www.smh.com.au/national/nsw/extra-trams-to-ease-crowding-on-sydney-s-inner-west-line-still-years-away-20190620-p51zix.html. Retrieved 3 July 2019.
- ↑ "The Light Rail Network - Sydney Fish Markets, The Star Casino, Darling Harbour and Chinatown are all on the list of destinations easily accessible by Sydney Light Rail". Transdev. Archived from the original on 1 December 2013. https://web.archive.org/web/20131201020209/http://www.transdevsydney.com.au/hop-on-board/the-light-rail-network/. Retrieved 2014-07-05.
- ↑ "Sydney Light Rail Extension - Stage 1 - Inner West Extension Preliminary Environmental Assessment" (pdf). Transport for NSW. July 2010. p. 10. http://www.transport.nsw.gov.au/sites/default/files/b2b/rail/PEA-SLRE-Inner-West-Extension-July2010.pdf. Retrieved 2014-07-05.
- ↑ "Light rail services". Transport for NSW. https://transportnsw.info/travel-info/ways-to-get-around/light-rail/light-rail-services. Retrieved 2018-03-31.
- ↑ "Name recommendations pack City and South East Light Rail (CSELR)". Transport for NSW. 8 August 2017. pp. 13–14. http://data.sydneylightrail.transport.nsw.gov.au/s3fs-public/Name%20Recommendations%20Pack%20-%20CBD%20and%20South%20East%20Light%20Rail.pdf.
- ↑ "Joint media release by Metro Transport Sydney and Paddy's Markets on the change of name for the Haymarket stop.". http://www.paddysmarkets.com.au/documents/paddysstationname.pdf. Retrieved 2013-08-26.
- ↑ "Creative quarter for south of the city". Infrastructure NSW. 11 December 2012. http://www.siceep.com/media/20305/fact_sheet_haymarket.pdf. Retrieved 13 December 2012.
- ↑ "Work is about to start on Sydney’s exciting new neighbourhood at Darling Square.". Lend Lease. 1 December 2014. http://www.darlingharbourlive.com.au/media/26803/141201-DSQ-Notification.pdf.
- ↑ Robertson, James (28 August 2015). "Sydney version of New York High Line to open between Central and Darling Harbour". The Sydney Morning Herald. http://www.smh.com.au/nsw/a-dormant-goods-line-reconnects-sydneys-east-and-west-20150827-gj95kf.html.
- ↑ Marks, Lucy (28 August 2015). "High-rise public walkway and recreation space to connect Railway Square to Darling Harbour". Australian Broadcasting Corporation. http://www.abc.net.au/news/2015-08-28/pedestrian-corridor-recreational-space-to-open-darling-harbour/6731704.
- ↑ "A Revitalised SFM Functional Brief Video". Sydney Fish Market. 6 November 2016. https://www.youtube.com/watch?v=hcM98zhyeGk.
- ↑ Cormack, Lucy (22 September 2016). "Harold Park Tramsheds open to reveal European-inspired food hall". The Sydney Morning Herald. http://www.smh.com.au/nsw/harold-park-tramsheds-open-to-reveal-europeaninspired-food-hall-20160922-grm7t4.html.
- ↑ "Monthly Opal Trips by Card Type and by Card Type by Station". Transport for NSW. https://www.transport.nsw.gov.au/data-and-research/passenger-travel/light-rail-patronage/light-rail-patronage-card-type. Retrieved 3 December 2018.
- ↑ "Inner West Light Rail Extension – Light rail stabling within the former Rozelle Goods Yard". John Holland Pty Ltd. http://www.transport.nsw.gov.au/sites/default/files/b2b/projects/IWLRE%20Light%20rail%20stabling%20within%20the%20former%20Rozelle%20Goods%20Yard.pdf. Retrieved 16 July 2013.
- ↑ Inner West Light Rail Extension Fact Sheet. Light rail stops - Hawthorne. Transport for NSW.
- ↑ 62.0 62.1 62.2 62.3 Sydney Light Rail Extension - Stage 1 - Inner West Extension - Preliminary Environmental Assessment. Appendix A. Transport NSW.
- ↑ "Taverners Hill Precinct". Urban Growth NSW. https://newparrard.com.au/precincts/taverners-hill/. Retrieved 18 September 2015.
- ↑ Sydney Light Rail Extension – Stage 1, Inner West Extension - Product Definition Report - p.19 - Transport NSW
- ↑ Inner West Light Rail Extension Fact Sheet. Light rail stops – Dulwich Grove. Transport for NSW
- ↑ Submissions Report Appendix A (Part 1) p 71. Transport NSW.
- ↑ Submissions Report - Main Report Figure 6.1 p 67. Transport NSW
- ↑ Submissions Report Appendix A (Part 1) p 59. Transport NSW.
Attribution
This article incorporates text from the following revision of the English Wikipedia article "Dulwich Hill Line": https://en.wikipedia.org/w/index.php?title=Dulwich_Hill_Line&oldid=871828385.