Metro North West Line: Difference between revisions

From Wikisage
Jump to navigation Jump to search
(create)
 
(move from Sydney Metro)
Line 6: Line 6:


The eastern terminus of the line is at Chatswood. This means passengers travelling to the city are <!--presently--> required to change to a [[T1 North Shore & Western Line]] or [[T9 Northern Line]] service to complete their journey. [[Sydney Metro City & Southwest]] is a project to construct a new tunnel to extend the metro line under Sydney Harbour, through the city and on to Sydenham. From there the metro will head west to Bankstown, taking over most of the [[Bankstown railway line]]. This extension is under construction and is due to open in 2024.
The eastern terminus of the line is at Chatswood. This means passengers travelling to the city are <!--presently--> required to change to a [[T1 North Shore & Western Line]] or [[T9 Northern Line]] service to complete their journey. [[Sydney Metro City & Southwest]] is a project to construct a new tunnel to extend the metro line under Sydney Harbour, through the city and on to Sydenham. From there the metro will head west to Bankstown, taking over most of the [[Bankstown railway line]]. This extension is under construction and is due to open in 2024.
===Hurstville branch===
Early plans for the City & Southwest project envisaged a second phase of the southern sector conversion of existing railway lines. This would see two of the four [[Illawarra railway line]] tracks between Sydenham and Hurstville converted to rapid transit and added to the Sydney Metro network. This would increase rail capacity between Hurstville and the city by 10 trains per hour. Though a precise construction timeframe was not provided, the plan was for all work being completed by 2031. The Hurstville conversion would add eight stations and <!--{{convert|-->9<!--|-->km<!--|abbr=on}}--> to the metro network.<ref name="srf">{{cite book|title=Sydney's rail future: modernising Sydney's trains|date=June 2012|author=Transport for NSW|url=http://www.transport.nsw.gov.au/sites/default/files/b2b/publications/sydneys-rail-future.pdf}}</ref> Developing plans for this extension proved difficult, and the ''Sydney Morning Herald'' reported in February 2016 that the project may have been dropped.<ref>{{cite news|last1=O'Sullivan|first1=Matt|last2=Saulwick|first2=Jacob|title=Plan to extend Sydney metro line south hits growing list of hurdles|url=http://www.smh.com.au/nsw/plan-to-extend-sydney-metro-line-south-hits-growing-list-of-hurdles-20160201-gmj9dz.html|work=The Sydney Morning Herald|date=3 February 2016}}</ref> It was absent from the New South Wales Government's 2018 ''Greater Sydney Services and Infrastructure Plan'' which set out potential transport projects to be built through to 2056.


==Stations==
==Stations==
Line 137: Line 140:
<nowiki>**</nowiki> As a metro station.
<nowiki>**</nowiki> As a metro station.
<nowiki>*</nowiki> Most stations are served by connecting bus services. Some Sydney Trains stations may also be served by intercity trains at certain times.
<nowiki>*</nowiki> Most stations are served by connecting bus services. Some Sydney Trains stations may also be served by intercity trains at certain times.
==Capacity==
Stage 1 is due to operate with 6-car trains running on 4 minute headways. After the addition of the Stage 2 extension to Bankstown the system will require at least 59 six-car trains to run every four minutes during peak periods. However the stations’ platforms will be configured to allow for future use of 8-car trains and the signalling system designed to allow for 2 minute headways, both of which are planned to be introduced once sufficient patronage demands it. Eight-car trains have a design capacity of 1,539 passengers, and increasing the running frequency to ultimately 30 trains per hour (2 minute headway) would provide a maximum capacity of 46,170 passengers per hour per direction.<ref>{{cite web|title=SYDNEY METRO CITY & SOUTHWEST &#124; BUSINESS CASE SUMMARY |url=http://www.sydneymetro.info/sites/default/files/Sydney%20Metro%20CSW%20Business%20Case%20Summary.pdf|publisher=Transport for NSW|accessdate=28 February 2017}}</ref>


==Potential extension==
==Potential extension==
During the 2019 New South Wales election campaign, the government announced it would commence planning of a western extension to the line from Bankstown to Liverpool.<ref>{{cite web|title=Expanding metro network to connect Sydney like never before|url=https://nsw.liberal.org.au/candidates/gladys-berejiklian/news/articles/EXPANDING-METRO-NETWORK-TO-CONNECT-SYDNEY|date=14 March 2019|website=Liberal Party NSW|}}</ref>
During the 2019 New South Wales election campaign, the government announced it would commence planning of a western extension to the line from Bankstown to Liverpool.<ref>{{cite web|title=Expanding metro network to connect Sydney like never before|url=https://nsw.liberal.org.au/candidates/gladys-berejiklian/news/articles/EXPANDING-METRO-NETWORK-TO-CONNECT-SYDNEY|date=14 March 2019|website=Liberal Party NSW|}}</ref>
==References==
{{reflist}}
[[Category:Sydney Metro|North West]]

Revision as of 02:40, 15 April 2019

The Metro North West Line is a future metro rail line serving the north west suburbs in Sydney, New South Wales, Australia. The line is the first line of the Sydney Metro network and is coloured teal on maps and informational material. The line is in the final stages of testing. It is Australia's first metro line.

History

A railway line serving the car-dependant north west suburbs had been proposed for many years. The North West Rail Link was announced in the New South Wales Government's 1998 long-term transport plan Action for Transport 2010. Plans to construct the line were repeatedly announced but then cancelled. While most plans envisaged the line as a conventional railway using Sydney's standard double-deck trains, the line was eventually created as single-deck metro line. The project to construct the line, known as Sydney Metro Northwest, converted the Epping to Chatswood railway line to metro standards and extended it through the north west suburbs to Rouse Hill.

The eastern terminus of the line is at Chatswood. This means passengers travelling to the city are required to change to a T1 North Shore & Western Line or T9 Northern Line service to complete their journey. Sydney Metro City & Southwest is a project to construct a new tunnel to extend the metro line under Sydney Harbour, through the city and on to Sydenham. From there the metro will head west to Bankstown, taking over most of the Bankstown railway line. This extension is under construction and is due to open in 2024.

Hurstville branch

Early plans for the City & Southwest project envisaged a second phase of the southern sector conversion of existing railway lines. This would see two of the four Illawarra railway line tracks between Sydenham and Hurstville converted to rapid transit and added to the Sydney Metro network. This would increase rail capacity between Hurstville and the city by 10 trains per hour. Though a precise construction timeframe was not provided, the plan was for all work being completed by 2031. The Hurstville conversion would add eight stations and 9km to the metro network.[1] Developing plans for this extension proved difficult, and the Sydney Morning Herald reported in February 2016 that the project may have been dropped.[2] It was absent from the New South Wales Government's 2018 Greater Sydney Services and Infrastructure Plan which set out potential transport projects to be built through to 2056.

Stations

North West Line stations
Name Opened** Interchanges*
Tallawong May 2019 none
Rouse Hill May 2019
Kellyville May 2019
Bella Vista May 2019
Norwest May 2019
Hills Showground May 2019
Castle Hill May 2019
Cherrybrook May 2019
Epping May 2019
Macquarie University May 2019 none
Macquarie Park May 2019
North Ryde May 2019
Chatswood May 2019
City and Southwest extension
Crows Nest 2024 none
Victoria Cross 2024
Barangaroo 2024
Martin Place 2024
Pitt Street 2024 none
Central 2024
Waterloo 2024 none
Sydenham 2024
Marrickville 2024 none
Dulwich Hill 2024
Hurlstone Park 2024 none
Canterbury 2024
Campsie 2024
Belmore 2024
Lakemba 2024
Wiley Park 2024
Punchbowl 2024
Bankstown 2024

** As a metro station. * Most stations are served by connecting bus services. Some Sydney Trains stations may also be served by intercity trains at certain times.

Capacity

Stage 1 is due to operate with 6-car trains running on 4 minute headways. After the addition of the Stage 2 extension to Bankstown the system will require at least 59 six-car trains to run every four minutes during peak periods. However the stations’ platforms will be configured to allow for future use of 8-car trains and the signalling system designed to allow for 2 minute headways, both of which are planned to be introduced once sufficient patronage demands it. Eight-car trains have a design capacity of 1,539 passengers, and increasing the running frequency to ultimately 30 trains per hour (2 minute headway) would provide a maximum capacity of 46,170 passengers per hour per direction.[3]

Potential extension

During the 2019 New South Wales election campaign, the government announced it would commence planning of a western extension to the line from Bankstown to Liverpool.[4]